- Land Acquisition of Ac.2.38¾ gts situated at Pullur village of Siddipet Rural (M) for Excavation of minors of 2R Distributory canal in package-12 main canal from Sri Kommuravelli mallanna Sagar Reservoir under Kaleshwaram Project.File.No.G1/3114/2024,Dated:21.12.2024.
- Land Acquisition of Ac.3.28 gts situated within the limits of Nangnoor(M)Baddipadaga(V) for Excavation of LD6-LM4 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3814/2022,Dated:12.12.2024.
- Land Acquisition of Ac.3.06 gts situated at Machapur Village of Chinnakodur mandal for excavation of RD3-RM1 minor canal of left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project.Proc.No.G1/2578/2023,Dated:12.12.2024.
- Land Acquisition of Ac.14.11 gts situated at Kachapur village of Koheda Mandal for excavtion of Distributaries on Gouravelly Left side Main Canal of Gouravelly Canal Project.File.No:G3/2828/2024,Dated:10.12.2024.
- Land Acquisition of Ac.41.22 gts situated at Koheda village of Koheda Mandal for excavtion of Distributaries on Gouravelly Left side Main Canal of Gouravelly Canal Project.File.No:G3/3036/2024,Dated:10.12.2024.
- Land Acquisition of Ac.45.17 gts situated at Narayanpur, Nakirikommula, Vinjapally and Samudrala villages of Koheda Mandal for excavtion of Distributaries on Gouravelly Left side Main Canal of Gouravelly Canal Project.File.No:G3/3034/2024,Dated:09.12.2024.
- Land Acquisition of Ac.2.26 gts situated within the limits of Vittalapur village of Chinnakodur mandal for Excavation of RD3-LM3 minor of LMC of Sri Ranganayaka sagar reservoir under kaleshwaram Project. File.No.G1/995/2023,Dated:28.11.2024.
- Land Acquisition of Ac.18.04 gts situated at Potlapally village of Husnabad Mandal for formation of Minors & Sub-Minors of Distributory-2 on Gouravelly Left side Main Canal of Gouravelly Reservoir.File.No:G3/2945/2024,Dated:28.11.2024.
- Land Acquisition of Ac.13.08 gts situated at Potlapally village of Husnabad Mandal for formation of Minors & Sub-Minors of Distributory-4 on Gouravelly Right side Main Canal of Gouravelly Reservoir.File.No:G3/2945/2024,Dated:22.11.2024.
- Land Acquisition of Ac.5.15 gts situated at Poreddypally H/o Baswapur Village of Koheda mandal for construction of check dam cum SLRB across Peddavagu.File.No:G3/2051/2019,Dated:20.11.2024.
- Land Acquisition of Ac.42.33 gts situated at Pandilla villages of Husnabad Mandal for formation of Minors & Sub-Minors of Distributory-2 on Gouravelly Left side Main Canal of Gouravelly Reservoir.File.No:G3/2921/2024,Dated:20.11.2024.
- Land Acquisition of Ac.15.00 gts situated at Kuchanapally, Pandilla Villages of Husnabad (M) for formation of Minor 1R on Distributory-2 of Gouravelly left side main canal of Gouravelly Reservoir.File.No.G3/2921/2024,Dated:20.11.2024.
- Land Acquisition of Ac.6.33 gts situated at Nakirikummula, Samudrala and Pariveda villages of Koheda Mandal for formation of Minors & Sub-Minors on Distributaries on Gouravelly Left side Main Canal of Gouravelly Reservoir.File.No:G3/2828/2024,Dated:18.11.2024.
- Land Acquisition of Ac.13.30 gts situated at Madadha village of Husnabad Mandal for formation of Minors & Sub-Minors on Minor 14R of Distributory-4 of Gouravelly Right side Main Canal of Gouravelly Reservoir.File.No:G3/2916/2024,Dated:18.11.2024.
- Land Acquisition of Ac.31.25 gts situated at Sriramulapally, Nakirikummula, Pariveda and koheda villages of Koheda Mandal for formation of Minors & Sub-Minors on Distributaries on Gouravelly Left side Main Canal of Gouravelly Reservoir.File.No:G3/2828/2024,Dated:07.11.2024.
- Land Acquisition of Ac.0.22¼ gts situated at Bakrichepyala (V) of Siddipet(Urban) Mandal for formation of service Roads at (ROB)156 of New BG line from Manoharabad-Kothapally Railway line project File.No:G2/2549/2019,Dated:04.11.2024.
- Land Acquisition of Ac.6.12 gts situated at Jangaon villages of Akkannapet Mandal for formation of Minors on Distributaries of Gouravelly Right side Main Canal of Gouravelli Reservoir.File.No:G3/1991/2024,Dated:04.11.2024.
- Land Acquisition of Ac.6.36 gts situated at Jangaon villages of Akkannapet Mandal for formation of Minors on Distributaries of Gouravelly Right side Main Canal of Gouravelli Reservoir.File.No:G3/1991/2024,Dated:04.11.2024.
- Land Acquisition of Ac.13.09 gts situated at Mallampally, Jangaon and Regonda villages of Akkannapeta Mandal for formation of Distributaries on Gouravelly Right side Main Canal and Left side Main Canal of Gouravelly Reservoir of Gouravelli Reservoir.File.No:G3/1991/2024,Dated:01.11.2024.
- Land Acquisition of Ac.10.06 gts situated at Anthakkapeta,Keshavapur and Katkur villages of Akkannapeta Mandal for formation of Minor & Sub Minors of Distributaries on Gouravelly Right side Main Canal of Gouravelli Reservoir.File.No:G3/1991/2024,Dated:01.11.2024.
- Land Acquisition of Ac.236.32 gts in Sy.No.289 & 364 situated within the limits of Kothur Village of Mulugu Mandal for establishment of Industrial Park by TGIIC.File.No.E2/1752/2019,Dated:28.10.2024.
- Land Acquisition of Ac.7.26 gts situated at Ensanpally (V) of Siddipet Urban (M) for excavation of parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/1730/2023,Dated:25.10.2024.
- Land Acquisition of 164.05 Sq.yards situated in Siddipet Town for Widening of carriage way from double lane to four lane of siddipet Bypass road from km 0/0 to 14/2 from Nagadevatha Temple to Siddipet Rural Police Station in siddipet District.File.No.G1/2332/2024,Dated:25.10.2024.
- Land Acquisition of Ac.6.13¾ gts situated at Komuravelli Mandal and Village for construction of Komuravelly Railway Station.File.No.G3/1523/2016,Dated:24.10.2024.
- Land Acquisition of Ac.26.23 gts situated at Baswapur Village of Koheda mandal for Excavation of LD6 Distributor Canal of RMC for Ranganayakasagar under Kaleshwaram Project.File.No:G1/877/2020,Dated:23.10.2024.
- Land Acquisition of Ac.2.37 gts situated within the limits of Raghavapur (V) Siddipet Rural (M) for Excavation of RD7-LM1 Canal of LMC of sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No.G1/6056/2021,Dated:23.10.2024.
- Land Acquisition of Ac.20.11 gts situated within the limits of Potharam village of Husnabad Mandal for formation of Minors & Sub-Minors of D4 of Gouravelli Right Side Main Canal of Gouravelli Reservoir.File.No:G3/4210/2023,Dated:23.10.2024.
- Land Acquisition of Ac.20.29 Gts.situated at Koheda Village of Koheda (M) for formation of Left side Main Canal of Gouravelli Reservoir. File.No.G3/258/2024,Dated:21.10.2024.
- Land Acquisition of Ac.27.03 Gts.situated at Kurella,Koheda Villages of Koheda (M) for formation of D5 Gouravelly Left side Main Canal of Gouravelli Reservoir. File.No.G3/258/2024,Dated:15.10.2024.
- Land Acquisition of Ac.17.04 gts situated within the limits of Husnabad,Thotapally & Mahammadapur villages of Husnabad Mandal for formation of Minors & Sub-Minors of D4 of Gouravelli Reservoir.File.No:G3/4210/2023,Dated:09.10.2024.
- Land Acquisition of Ac.46.25 gts situated within the limits of Husnabad,Mirzapur & Thotapally villages of Husnabad Mandal for formation of Minors & Sub-Minors of D4 of Gouravelli Reservoir.File.No:G3/4210/2023,Dated:09.10.2024.
- Land Acquisition of Ac.0.25½ gts situated within the limits of Khatha village of Nangnoor Mandal for excavation LD-10-RM2 Pump house of Right main canal of sri Ranganayaka sagar Reservoir under Kaleshwaram project.Proc.No.G1/1688/2023, Dated:30.09.2024.
- Land Acquisition of Ac.16.27 gts situated at Baswapur Village of Koheda mandal for construction of LD6 Right Main Canal of RMC for Ranganayakasagar under Kaleshwaram Project.File.No:G1/877/2020,Dated:30.09.2024.
- Land Acquisition of Ac.1.08 gts situated within the limits of Narayanraopet village of Narayanraopet Mandal for Excavation canal of RD7-LM1 minor of LMC of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.File.No.G1/3456/2021,Dated:27.09.2024.
- Land Acquisition of Ac.0.33 gts situated with in the limits of Ghanapur (V) of Nangnoor Mandal for excavation of LD10-RM2 Pump house of Right main canal of Sri Ranganayaka Sagar Reservoir under Kaleshwaram Project.File.No.G1/1689/2023,Dated:25.09.2024.
- Land Acquisition of Ac.36.03 gts situated within the limits of Venkatapur (V) of Siddipet Rural(M) for Excavation of parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/764/2023,Dated:20.09.2024.
- Land Acquisition of Ac.3.01 gts situated within the limits of Konaipally(V) Nangnoor (M) for excavation of LD4(1)-LM1 of RMC of sri Ranganayaka sagar Reservoir under Kaleshwaram Project.File.No:G1/3843/2022,Dated:20.09.2024.
- Land Acquisition of Ac.1.29 gts situated at Jakkapur village of Narayanaraopet Mandal and 1.06 gts at Machapur village of chinnakodur mandal for formation of new BG Railway line from Manoharabad to kothapally.File.No.G3/1523/2016,Dated:28.08.2024.
- Land Acquisition of Ac.9.36 gts situated at Kotyal village of mulugu Mandal for establishment Biotech Park,Phase-IV by TGIIC .File.No.E1/3487/2022,Dated:16.08.2024.
- Land Acquisition of Ac.4.09¾ gts situated at chinnakodur Village of Chinnakodur mandal for excavation of RD3-RM2-LSM4 sub-minor canal under LMC sri Ranganayakasagar reservoir under Kaleshwaram Project Extension of time of PN further a period of (12) months. Proc.No.G1/3110/2021,Dated:09.08.2024.
- Land Acquisition of Ac.1.15 gts situated at Gangapur(V) Chinnakodur(M) for Excavation of RD3-RM2-LSM1 sub-minor canal under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project Extension of time of PN further a period of (12) months. Proc.No:G1/2896/2023,Dated:09.08.2024.
- Land Acquisition of Ac.2.26 gts situated within the limits of Vittalapur (V) Chinnakodur (M) for Excavation of RD3-LM3 minor of LMC of Sri Ranganayaka sagar reservoir under kaleshwaram Project. File.No.G1/995/2023,Dated:31.07.2024.
- Land Acquisition of Ac.0.39 gts situated within the limits of Vittalapur (V) Chinnakodur (M) for Excavation of RD3-RM2-LSM1 sub minor canal of LMC of Sri Ranganayaka sagar reservoir under kaleshwaram Project Extension of time of PN further a period of (12) months. Proc.No.G1/2895/2023,Dated:23.07.2024.
- Land Acquisition of Ac.6.27 gts situated within the limits of Lingapur (V) of Thoguta (M) for excavation of D-10 Distributory of RMC of sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project. File.No.G1/1373/2019,Dated:23.07.2024.
- Land Acquisition of Ac.7.32 gts situated within the of limits of chandapur village Thoguta mandal for excavation of D-8 distributory of Right main canal of Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project.FileNo:G1/1347/2019,Dated:23.07.2024.
- Land Acquisition of Ac.1.13 gts situated at Bakrichepyala (V) of Siddipet(Urban) Mandal for service Roads at (ROB)156 for formation of New BG line from Manoharabad-Kothapally-Extension of time of PN further a period of (12) months.Proc.No:G2/2549/2019,Dated:23.07.2024.
- Land Acquisition of Ac.3.11 gts situated in Marpadaga Village of Kondapak Mandal for Excavation of 1R Distributory canal in package-12 main canal of Sri Komuravelli Mallanna sagar reservoir under Kaleshwaram Project Extension of validity of Declaration beyond 12 months.Proc.No:G1/3895/2022,Dated:19.07.2024.
- Land Acquisition of Ac.8.08 gts situated within the limits of chepyala (V) of Mirdoddi Mandal for Excavation of D-11 distributary of RMC of Sri Komuravelly Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/1895/2019,Dated:11.07.2024
- Land Acquisition of Ac.4.14 ½gts situated within the limits of Raghavapur (V) Siddipet Rural (M) for Excavation of 2R Minor Canal of 6R distributary canal in package-12 of Sri Kommuravelli mallanna Sagar Reservoir under Kaleshwaram Project.File.No.G1/2912/2022,Dated:09.07.2024.
- Land Acquisition of Ac.2.38 gts situated within the limits of Venkatraopet (V) of Thoguta (M) for Excavation of D-10 Distributor of RMC of sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project.Lr.No.G1/1349/2019,Dated:09.07.2024.
- Land Acquisition of Ac.2.16 gts situated within the limits of Nangnoor(V) Nangnoor(M) for Excavation of LD6-LM4 distributary of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .Lr.No.G1/2254/2023,Dated:09.07.2024.
- Land Acquisition of Ac 21.20gts Situated in Alwal (V) of Mirdoddi (M) for excavation of D-11 Distributory of right main canal of Sri Komuravelly Mallanna Sagar Reservoir Under Kaleshwaram Project.Lr.No:G1/1901/2019,Dated:09.07.2024.
- Land Acquisition of Ac.3.06 gts situated at Machapur Village of Chinnakodur mandal for excavation of RD3-RM1 minor canal of left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension of time of Preliminary Notification further a period of (12 months).Proc.No.G1/2578/2023,Dated:09.07.2024.
- Land Acquisition of Ac.2.30½ gts situated at Chinthamadaka Village of Siddipet mandal for excavation of public purpose,namely,2R Minor of 6R Distributor package-12 main canal of Sri Komuravelli Mallanna sagar Reservoir under kaleshwaram Project. File.No.G1/3104/20222,Dated:03.07.2024.
- Land Aquisition of Ac.4.02 gts situated within the limits of Ramunipatla (V) of chinnakodur mandal for Exacavation of RD1-LM4 canal of Ranganayaka sagar reservoir under Kaleshwaram Project.File.No:G1/1685/2022,Dated:03.07.2024.
- Land Acquisiton of Ac.6.15¼ gts situated within the limits of Ankampet (V) siddipet rural mandal for excavation package 12 under 6R-Distributor of 2R minor canal Sri komuravelli Mallanna sagar Reservoir under Kaleshwaram Project.File.No:G1/4166/2022,Dated:03.07.2024.
- Land Acquisiton of Ac.7.33½ gts situated within the limits of Jakkapur(V) of Narayanaraopet(M) for Construction of RD3-LM3 sub minor canal of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.File.No:G1/1684/2022,Dated:03.07.2024.
- Land Acquisition of Ac.0.06 gts situated within the limits of Lingapur (V) of Thoguta (M) for excavation of D-9 Distributor canal for sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project. File.No.G1/1373/2019,Dated:03.07.2024.
- Land Acquisition of Ac.1.22¼ gts situated within the limits of Gurralagondhi village Narayanraopet Mandal for excavation canal of RD4-RM3 minor of LMC of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.Proc.No.G1/291/2023,Dated:03.07.2024.
- Land Acquisition of Ac.6.37 gts situated at surampally village of Doulthabad Mandal for excavation of Right main canal of Sri Komuravelli Mallanna sagar Reservoir under kaleshwaram project.File.No.G2/4563/2017, Dated:28.06.2024.
- Land Acquisition of Ac.2.23 gts situated at Theegul villages of Jagadevpur (M) tail channel package -15 main canal for construction of under Kaleshwaram project.,Lr.No.G2/1746/2018,Dated:28.06.2024.
- Land Acquisition of Ac.3.25 gts situated within the limits of Nangnoor(V) of Nangnoor(M) for Excavation of LD6-LM4 distributary of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project Extension of time of Preliminary Notification further a period of (12 months).File.No.G2/2254/2023,Dated:21.06.2024.
- Land Acquisition of Ac.7.26 gts situated at Ensanpally (V) of Siddipet Urban (M) for excavation of parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/1730/2023,Dated:11.06.2024.
- Land Acquisition of Ac.3.00 gts situated within the limits of Gurralagondhi village Narayanraopet Mandal for formation of New BG Railway line from Manoharabad to Kothapally.File.No.G3/1523/2016,Dated:11.06.2024.
- Land Acquisition of Ac.9.06½ gts situated at Allipur Village of Chinnakodur mandal for excavation of RD3-RM2-LSM1-RSSM1 sub-minor canal under LMC of Sri Ranganayakasagar reservoir under Kaleshwaram Project.File.No.G1/1374/2024,Dated:11.06.2024.
- Land Acquisition of Ac.5.15 gts situated at Baswapur Village of Koheda mandal for construction of check dam cum SLRB across Peddavagu near Poreddypally Project.File.No:G3/2051/2019,Dated:11.06.2024.
- Land Acquisition of Ac.7.03 gts situated within the limits of Japthilingareddypally (V) of Thoguta (M) for excavation of D-11 Distributor of Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project File.No.G1/1893/2019, Dated:04.06.2024.
- Land Acquisition of Ac.9.05½ gts situated within the limits of Narayanraopet village of Narayanraopet Mandal for Excavation canal of RD8-LM2 of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.File.No.G1/556/2023,Dated:04.06.2024.
- Land Acquisition of Ac.18.04 gts situated within the limits of Venkatraopet (V) of Thoguta (M) for Excavation of D9 Distributor of RMC of sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project.File.No.G1/1816/2020,Dated:04.06.2024.
- Land Acquisition of Ac.0.29½ gts,Ac.0.09 gts,Ac.1.17½ gts,Ac.2.07¼ gts,Ac.2.18¾ gts situated at Kotyala, Zapthisingaipally, Adavimajeed, cheelasagar, and Narsampally villages of Mulugu (M) for construction of Thurkapally Main canal system of kondapochamma sagar under kaleshwaram project.Extension of time of Preliminary Notification further a period of (12 months).File.No.G2/761/2018,Dated:03.06.2024.
- Land Acquisition of Ac.7.32 gts situated within the of limits of chandapur village Thoguta mandal for excavation of D-8 distributor of Right main canal of Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project Extension of time of PN.Proc.No:G1/1347/2019,Dated:30.05.2024.
- Land Acquisiton of Ac.4.18 gts situated at Gangapur(V) of chinnakodur(M) for Excavation of RD3-LM1 canal under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/1347/2024,Dated:30.05.2024.
- Land Acquisition of Ac.7.02 gts situated within the limits of Gurralagondhi village Narayanraopet Mandal for excavation of RD3-LM3-LSM1 sub minor canal under LMC of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.File.No.G1/6341/2021,Dated:30.05.2024.
- Land Acquisition of Ac.2.14 gts situated at Malyala(V) of Narayanraopet for Excavation Canal of RD4-LM2 sub minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3458/2021,Dated:30.05.2024.
- Land Acquisition of Ac.11.37 gts situated within the limits of Lingapur (V) of Thoguta (M) for Excavation of D-11 Distributor of Right main canal for Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project. Extension of time PN.Proc.No.G1/1894/2019,Dated:30.05.2024.
- Land Acquisition of Ac.6.27 gts situated within the limits of Lingapur (V) of Thoguta (M) for Excavation of D-10 Distributor of Right main canal for Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project-Extension time of PN.Proc.No.G1/1373/2019,Dated:30.05.2024.
- Land Acquisition of Ac.2.37 gts situated within the limits of Raghavapur (V) Siddipet Rural (M) for Excavation of RD7-LM1 Canal of LMC of sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No.G1/6056/2021,Dated:30.05.2024.
- Land Acquisition of Ac.2.38 gts situated within the limits of Venkatraopet (V) of Thoguta (M) for Excavation of D-10 Distributor of RMC of sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project-Extension of time of PN.Proc.No.G1/1349/2019,Dated:29.05.2024.
- Land Acquisition of Ac.1.08 gts situated within the limits of Narayanraopet village of Narayanraopet Mandal for Excavation of RD7-LM1 sub-minor canal of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.File.No.G1/3456/2021,Dated:29.05.2024.
- Land Acquisition of Ac.5.29 gts situated within the limits of Bakrichepyala (V) of Siddipet (U) Mandal for Excavation of 1-R distributor of package-12 of Sri Komuravelly Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/2357/2019,Dated:29.05.2024
- Land Acquisition of Ac.8.08 gts situated within the limits of Chepyala (V) mirdoddi (M)for Excavation of D-11 distributary of RMC of Sri Komuravelli mallanna sagar under Kaleshwaram Project Extension of time of PN.Proc.No:G1/1895/2019,Dated:29.05.2024.
- Land Acquisition of Ac.3.09 gts situated within the limits of Narayanaraopet(V) of Narayanaraopet(M) for Excavation of RD9-LM1 sub minor canal of LMC of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.File.No:G1/3509/2023,Dated:29.05.2024.
- Land Acquisition of Ac.1.19 gts situated within the limits of Malyala Village of Narayanaraopet(M) for Excavation of RD4-RM3 sub minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/293/2023,Dated:29.05.2024.
- Land Acquisition of Ac.0.39 gts Situated at Ankshapur(v) of Nangnoor (M) for excavation of LD10-RM4 canal of RMC of sri RanganayakaSagar Reservoir under Kaleshwaram Project .File.No:G1/1217/2023,Dated:25.05.2024.
- Land Acquisition of Ac.6.03 gts situated within the limits of Nangnoor(V) Nangnoor(M) for Excavation of LD10-LM4 of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/2991/2023,Dated:25.05.2024.
- Land Acquisition of Ac.5.10 gts situated within the limits of Nagarajupally village of Nangnoor Mandal for excavation LD-10-RM4 canal of RMC of sri Ranganayaka sagar Reservoir under Kaleshwaram project, File.No.G1/1231/2023, Dated:25.05.2024.
- Land Acquisition of Ac.1.12 gts situated at Palamakula(V) of Nanganoor(M) for Excavation of LD5 Distributary of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/289/2023,Dated:23.05.2024..
- Land Acquisition of Ac.1.23 gts situated with in the limits of Khanapur (V) of Nangnoor (M) for excavation of LD10-RM3 canal of RMC of Sri Ranganayaka sagar Reservoir under Kaleshwaram project. File.No.G1/5067/2022, Dated:23.05.2024.
- Land Acquisition of Ac.0.10 gts situated within the limits of Chowdaram (V) Chinnakodur (M) for excavation of RD3-RM2-LSM5 sub minor caal under LMC of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.Lr.No.G1/3502/2023,Dated:23.05.2024.
- Land Acquisition of Ac.3.25½ gts situated within the limits of Baddipadaga(V) of Nangnoor(M) for Excavation of LD6-LM5 canal of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3813/2022,Dated:23.05.2024.
- Land Acquisition of Ac.0.23 gts Situated at Ankshapur(v) of Nangnoor (M) for excavation of LD10-RM2 canal of RMC of sri RanganayakaSagar Reservoir under Kaleshwaram Project .File.No:G1/5023/2023,Dated:23.05.2024.
- Land Aquisition of Ac.0.03 gts situated at Dudeda village of Kondapak Mandal for construction of new BG Railway line from Manoharabad to Kothapalli Broad Gauge RUB No.154. Proc.No.G2/2549/2019,Dated:16.05.2024.
- Land Acquisition of Ac.13.3375 gts sy.No.71 situated at Chinnathimmapur (V) Mulugu (M) for establishment of vegetable Hub with cold chain facilities for the welfare of the farming community.Proc.No.G2/1790/2021,Dated:15.05.2024 .
- Land Acquisition of Ac.0.39 gts situated within the limits of Khatha village of Nangnoor Mandal for excavation LD-10-RM2Pump house of Right main canal of sri Ranganayaka sagar Reservoir under Kaleshwaram project.Proc.No.G1/1688/2023, Dated:02.05.2024.
- Land Acquisition of Ac.1.19 gts situated with in the limits of Ghanapur (V) of Nangnoor Mandal for excavation of LD10-RM2 Pump house of Right main canal of Sri Ranganayaka Sagar Reservoir under Kaleshwaram Project.Proc.No.G1/1689/2023,Dated:02.05.2024.
- Land Acquisition of Ac.4.32½ gts situated at Gangapur village of chinnakodur Mandal for construction of new BG Railway line from Manoharabad to Kothapally File.No:G3/1523/2016,Dated:24.04.2024.
- Land Acquisition of Ac.1.38 gts situated at Vittalapur (V) Chinnakodur (M) for construction of New BG Railway line from Manoharabad to kothapally.File.No.G3/1523/2016,Dated:20.04.2024.
- Land Acquisition of Ac.5.10 gts situated within the limits of Nagarajupally village of Nangnoor Mandal for excavation LD-10-RM4 minor of RMC of sri Ranganayaka sagar Reservoir under Kaleshwaram project, Extension time of PN. Proc.No.G1/1231/2023, Dated:18.03.2024.
- Land Acquisition of Ac.0.39 gts Situated at Ankshapur(v) of Nangnoor (M) for excavation of LD10-RM4 Minor of RMC of sri RanganayakaSagar Reservoir under Kaleshwaram Project .Proc.No:G1/1217/2023,Dated:18.03.2024.
- Land Acquisition of Ac.6.33 gts situated within the limits of Chinnakodur (V) and mandal for construction canal of RD3-RM2-RSM4 Sub-minor canal of LMC of Sri Ranganayaka sagar reservoir under kaleshwaram Project. File.No.G1/4000/2022,Dated:18.03.2024
- Land Acquisition of Ac.3.0538 gts within the limits of Mittapally (V) of Siddipet (Urban) (M) for construction of New BG Line from manoharabad-kothapally service Road for (ROB)-167 under RFCTLARR Act 30 of 2023.File.No.G2/2549/2019,Dated:13.03.2024.
- Land Acquisition of Ac.1.18 gts situated at Baddipadaga(V) Nangnoor (M) for excavation of LD6-LM6 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.Proc.No:G1/3815/2022,Dated:28.02.2024.
- Land Acquisition of Ac.141.38 gts situated within the of limits of Thadkapally (V),Siddipet Mandal for Excavation Parallel Conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project.File.No.G1/1358/2019,Dated:20.02.2024.
- Land Acquisition of Ac.84.23½ Gts Situated within the limits of Gajwel (V) of Gajwel (M) for Construction of R&R colony to the submerged Displaced families of Mallanna Sagar Reservoir Under Kaleshwaram Project .File.No:G1/5065/2022,Dated:27.01.2024.
- Land Acquisiton of Ac.9.05½ gts situated within the limits of Narayanaraopet Village and Mandal for excavation of RD8-LM2 minor of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.Extension of time of PN. File.No:G1/556/2023,Dated:27.01.2024.
- Land Acquisiton of Ac.1.19 gts situated within the limits of Malyala Village of Narayanaraopet(M) for Excavation of RD4-RM3 minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.Extension time of PN.File.No:G1/293/2023,Dated:18.01.2024.
- Land Acquisition of Ac.25.32 gts situated at Konaipally(V) Kukunoorpally(M) for formation of feeder channel from Sri Komuravelli Mallanna sagar to Tapaspally Reservoir under Kaleshwaram Project.File.No:G1/1980/2022,Dated:06.01.2024.
- Land Acquisition of Ac.6.37 gts situated at surampally village of Doulthabad Mandal for excavation of Right main canal of Sri Komuravelli Mallanna sagar Reservoir under kaleshwaram project.File.No.G2/4563/2017, Dated:06.01.2024.
- Land Acquisition of Ac.59.19 gts situated in Mangole village of Kukunoorpally Mandal for excavation of formation of feeder channel from sri Komuravelli Mallanna Sagar to Tapaspally Reservoir.Proc.No.G1/1980/2022, Dated:06.01.2024.
- Acquisition of Ac.22.31 gts situated in Medhinipur villages of kukunoorpally mandal for excavation of formation of feeder channel from Sri Komuravelli Mallanna sagar Reservoir to Tapaspally Reservoir under Kaleshwaram project.Proc.No.G1/1980/2022,Dated:03.01.2024.
- Land Acquisition of Ac.56.20 gts situated at Peddakodur Village of Chinnakodur mandal for formation of new BG Railway Lane from Manoharabad to Kothapally. Proc.No.G3/1523/2016,Dated:02.01.2024.
- Land Acquisition of Ac.1.22¼ gts situated within the limits of Gurralagondhi village Narayanraopet Mandal for excavation of RD4-RM3 minor canal under LMC of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.Proc.No.G1/291/2023,Dated:02.01.2024.
- Land Acquisition of Ac.8.38 gts situated with in the limits of Khanapur (V) of Nangnoor (M) for excavation of LD10-RM3 Minor of RMC of Sri Ranganayaka sagar Reservoir under Kaleshwaram project,Extension of time of PN. Proc.No.G1/5067/2022, Dated:26.12.2023.
- Land Acquisition of Ac.6.15 gts situated within the limits of Nagarajupally village of Nangnoor Mandal for excavation LD-10-RM3 minor of RMC of sri Ranganayaka sagar Reservoir under Kaleshwaram project, Extension time of PN. Proc.No.G1/252/2023, Dated:26.12.2023.
- Land Acquisiton of Ac.4.35 gts situated in Narayanaraopet(V) of Narayanaraopet(M) for Excavation of RD8-LM3 minor canal under left main canal of of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.Proc.No:G1/6344/2021,Dated:26.12.2023.
- Land Acquisition of Ac.1.14 gts situated at Palamakula(V) of Nanganoor(M) for Excavation of LD5 of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .Proc.No.G1/289/2023,Dated:26.12.2023.
- Land Aquisition of Ac.9.00 Gts and Ac.1.11 Gts situated at Duddeda and Bandaram villages of Kondapak mandal for construction of Outer Ring Road to Siddipet town. File.No.G2/4116/2023,Dated:20.12.2023.
- Land Acquisition of Ac.0.23 gts Situated at Ankshapur(v) of Nangnoor (M) for excavation of LD10-RM3 Minor of RMC of sri RanganayakaSagar Reservoir under Kaleshwaram Project .Proc.No:G1/5023/2022,Dated:20.12.2023.
- Land Acquisition of Ac.13.33 gts situated within the limits of Ramancha (V) of Chinnakodur (M) for Excavation of package-2, Link-IV Pressure main (pipeline) parallel conveyor system under Kaleshwaram Project.File.No.G1/3754/2023,Dated:02.11.2023.
- Land Acquisition of Ac.3.15 gts situated at Machapur Village of Chinnakodur mandal for excavation of Package-2, Link-IV (Surge Tank) for Ananthagiri Reservoir under Kaleshwaram Project File.No.G1/3752/2023,Dated:02.11.2023.
- Land Acquisition of Ac.30.09 gts situated at siddipet Municipality-siddipet Urban mandal for construction of recreation zone Tourism spot like Shilparamam facilities near Komaticheruvu at siddipet Town-Extension of time of Notification.File.No.G1/5025/2022,Dated:03.11.2023.
- Land Acquisiton of Ac.3.09 gts situated within the limits of Narayanaraopet(V) of Narayanaraopet(M) for Excavation of RD9-LM1 minor of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.File.No:G1/3509/2023,Dated:13.10.2023.
- Land Acquisiton of Ac.21.36 gts situated within the limits of Jakkapur(V) of Narayanaraopet(M) for Excavation of RD3-LM4 -LSM1 under LMC of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.File.No:G1/3507/2023,Dated:09.10.2023.
- Land Acquisition of Ac.0.39 gts situated within the limits of Chowdaram (V) Chinnakodur (M) for excavation of RD3-RM2-LSM5 sub minor caal under LMC of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.Lr.No.G1/3502/2023,Dated:09.10.2023 .
- Land Acquisition of Ac.3.01 gts situated at Konaipally(V) Nangnoor (M) for excavation of LD4(1)-LM1 minor RMC of Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3843/2022,Dated:20.09.2023.
- Land Acquisition of Ac.3.25½ gts situated at Baddipadaga(V) Nangnoor (M) for excavation of LD6-LM5 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3813/2022,Dated:19.09.2023.
- Land Acquisition of Ac.4.09¾ gts situated at chinnakodur Village of Chinnakodur mandal for excavation of RD3-RM2-LSM4 sub-minor canal under LMC sri Ranganayakasagar reservoir under Kaleshwaram Project.File.No.G1/3110/2021,Dated:12.09.2023.
- Land Acquisition of Ac.3.00 gts situated at Gajwel (V) & (M) for providing House sites/open plots to the effected families under Sri Komuravelli Mallanna Sagar Reservoir.File.No:G1/1125/2019,Dated:04.09.2023.
- Land Acquisition of Ac.6.03 gts situated within the limits of Nangnoor(V) Nangnoor(M) for Excavation of LD10-LM4 of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/2991/2023,Dated:28.08.2023.
- Land Acquisition of Ac.0.39 gts situated within the limits of Vittalapur (V) Chinnakodur (M) for Excavation of RD3-RM2-LSM1 sub minor canal under LMC of Sri Ranganayaka sagar reservoir under kaleshwaram Project. File.No.G1/2895/2023,Dated:18.08.2023.
- Land Acquisiton of Ac.1.15 gts situated at Chinnakodur(M) Gangapur(V) for Excavation of RD3-RM2-LSM1 sub-minor canal under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/2896/2023,Dated:17.08.2023.
- Land Acquisition of Ac.1.13 gts situated at Bakrichepyala (V),Siddipet(Urban) Mandal for service Roads at (ROB)156 for construction of New BG line from Manoharabad-Kothapally Project.File.No:G2/2549/2019,Dated:9.08.2023.
- Land Acquisition of Ac.3.11 gts situated within the limits of Marpadaga Village of Kondapak Mandal for Excavation of 1R Distributory canal in package-12 main canal of Sri Komuravelli Mallanna sagar reservoir under Kaleshwaram Project .File.No:G1/3895/2022,Dated:23.07.2023.
- Land Acquisition of Ac.1.04 gts situated at Mulugu village of Mulugu Mandal for the project Laying of pipe line under Moulana Abdul Kalam hyderabad sujala sravanthi GDWSS Phase-I .File.No.G2/4410/2017,Dated:23.07.2023.
- Land Acquisition of Ac.1.00 gts within the limits of Mittapally (V) of Siddipet (Urban) (M) for construction of Sewerage Treatment Plant (STP)File.No:G1/4864/2022.Dated:21.07.2023
- Land Acquisition of Ac.4.12 gts situated within the limits of Duddeda (V) of Kondapak (M) for Excavation of 1R distributory canal in package-12 main canal under Kaleshwaram Project.File.No:G1/4635/2022,Dated:15.07.2023.
- Land Acquisition of Ac.3.06 gts situated at Machapur Village of Chinnakodur mandal for excavation of RD3-RM1 minor canal of LMC Ranganayakasagar reservoir under Kaleshwaram Project.File.No.G1/2570/2023,Dated:15.07.2023.
- Land Acquisition of Ac.2.27 gts situated within the limits of Ramancha village of chinnakodur mandal for excavation of RD5-RM1-LSM1 minor canal under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No.G1/2474/2023,Dated:11.07.2023.
- Land Acquisition of Ac.3.20 gts, Ac.28.03 gts &Ac.21.23½ gts situated at Machapur,Gangapur and Vittalapur villages , chinnakodur Mandal for formation of new Railway lane from Manoharabad to Kothapally under RFTCTLARR Actof 2013.File.No:G3/1523/2016,Dated:05.07.2023.
- Land Acquisition of Ac.8.08 gts situated within the limits of Chepyala (V) mirdoddi (M)for Excavation of D-11 distributary of RMC of Sri Komuravelli mallanna sagar under Kaleshwaram Project.File.No:G1/1895/2019,Dated:30.06.2023.
- Land Acquisition of Ac.7.32 gts situated within the of limits of chandapur village Thoguta mandal for excavation of D-8 distributor of Right main canal of Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project.File.No:G1/1347/2019,Dated:30.06.2023.
- Land Acquisition of Ac.6.27 gts situated within the limits of Lingapur (V) of Thoguta (M) for Excavation of D-10 Distributor of Right main canal for Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.File.No.G1/1373/2019,Dated:26.06.2023.
- Land Acquisition of Ac.11.37 gts situated within the limits of Lingapur (V) of Thoguta (M) for Excavation of D-11 Distributor of Right main canal for Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.File.No.G1/1894/2019,Dated:26.06.2023.
- Land Acquisition of Ac.3.25 gts situated within the limits of Nangnoor(V) Nangnoor(M) for Excavation of LD6-LM4 distributary of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/2254/2023,Dated:26.06.2023.
- Land Acquisition of Ac.18.04 gts situated within the limits of Venkatraopet (V) of Thoguta (M) for excavation of D-9, Distributor of Right main canal of sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project.File.No.G1/1816/2020,Dated:26.06.2023.
- Land Acquisition of Ac.1.03 gts situated at Kyasaram (V) of Gajwel (M) for formation of Gravity canal under package-17 of Kaleshwaram Project.File..No.G1/3571/2017,Dated:19.06.2023.
- Land Acquisition of Ac.6.34½ gts situated at Wargal village & mandal for construction of Sangareddy Distributory canal (D-2R)of Kondapochamma Reservoir under Kaleshwaram Project.File.No:G2/1710/2020,Dated:19.06.2023.
- Land Acquisition of Ac.0.29½ gts,Ac.0.09 gts,Ac.1.17½ gts,Ac.2.07¼ gts,Ac.2.18¾ gts situated at Kotyal, Zapthisingaipally, Adavimajeed, cheelasagar, and Narsampally villages of Mulugu (M) for construction of Thurkapally Main canal system of kondapochamma sagar under kaleshwaram project.File.No.G2/761/2018,Dated:08.06.2023.
- Land Acquisition of Ac.2.03½ gts situated at Mittapally village of Siddipet (U) Mandal for construction of new BG Line from Manoharabad-Kothapalli service road for (ROB) uder RFCTLARR Act 30 of 2013.File.No.G2/2549/2019,Dated:08.06.2023.
- Land Acquisition of Ac.5.29 gts situated within the limits of Bakrichepyala (V) of Siddipet (U) Mandal for Excavation of 1-R distributory of main canal from Sri Komuravelly Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/2357/2019,Dated:31.05.2023.
- Land Acquisition of Ac.2.38 gts situated at Venkatraopet (V) of Thoguta (M) for excavation of D-10, Distributor of Right main canal of sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project.File.No.G1/1349/2019,Dated:31.05.2023.
- Land Aquisition of Ac.1.07 gts & Ac.0.23 gts situated at Nancharupalli & Ponnala villages of Siddipet(Urban) mandal for construction new BG Railway line between Manoharabad and Kothapalli Project.Fil.No.G2/2549/2019,Dated:31.05.2023.
- Land Acquisition of Ac.80.04 gts situated at Kotyal (V) of Mulugu (M) for establishment of Instructional Farm at Mulugu Campus under RECTLARR Act 30 of 2013.File.No.E2/2621/2021,Dated:23.05.2023.
- Land Aquisition of Ac.0.03 Gts situated at Duddeda village of Kondapak mandal for construction new BG Railway line between Manoharabad and Kothapalli Project. File.No.Fil.No.G2/2549/2019,Dated:20.05.2023.
- Land Acquisition of Ac.13.3375 gts sy.No.71 situated at Chinnathimmapur (V) Mulugu (M) for establishment of vegetable Hub with cold chain facilities for the welfare of the farming community.Lr.No.G2/1790/2020,Dated:18.05.2023 .
- Land Acquisition of Ac.1.13 gts situated within the limits of Chowdaram (V) Chinnakodur (M) for public purpose ,namely,excavation of RD3-RM2-LSM5 of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.Lr.No.G1/1745/2023,Dated:16.05.2023 .
- Land Acquisition of Ac.7.26 gts situated in Ensanpally (V) of Siddipet Urban (M) for excavation of parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1730/2023,Dated:09.05.2023.
- Land Acquisition of Ac.4.14 gts situated at Hasanmeerapur village of Dubbak (M) for Excavation of 6-R Distributor of 2-R minor of sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.File.No.G1/4463/2022,Dated:09.05.2023.
- Land Acquisition of Ac.0.39 gts situated within the limits of Khatha village of Nangnoor Mandal for excavation LD-10-RM2Pump house of Right main canal of sri Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/1688/2023, Dated:06.05.2023.
- Land Acquisition of Ac.4.05 gts situated within the limits of Maqdumpur(V) Nangnoor(M) for Excavation of LD6-RM4 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3811/2022,Dated:06.05.2023.
- Land Acquisition of Ac.1.19 gts situated with in the limits of Ghanapur (V) of Nangnoor Mandal for excavation of LD10-RM2 Pump house of Right main canal of Sri Ranganayaka Sagar Reservoir under Kaleshwaram Project.Proc.No.G1/1689/2023,Dated:06.05.2023.
- Land Acquisition of Ac.0.21 gts situated within the limits of Yellapur (V) , Dubbak (M) for Excavation of 6-R distributor of Main canal of Sri Komuravelli Mallanna Sagar under Kaleshwaram Project.File.No.G1/1690/2023,Dated:06.05.2023.
- Land Acquisition of Ac.8.21 gts situated at siddipet Municipality-siddipet Urban mandal for construction of recreation zone Tourism spot like Shilparamam facilities near at Komaticheruvu.File.No.G1/5025/2022,Dated:03.05.2023.
- Land Acquisition of Ac.30.09 gts situated at siddipet Municipality-siddipet Urban mandal for construction of recreation zone Tourism spot like Shilparamam facilities near at Komaticheruvu.File.No.G1/5025/2022,Dated:06.01.2023.
- Land Acquisition of Ac.11.39 gts situated at Kyasaram (V) of Gajwel (M) for construction of package-17 tunnel and gravity canal under Kaleshwaram Project.File..No.G1/3571/2017,Dated:25.04.2023.
- Land Acquisition of Ac.0.37 gts situated at Pragnapur (V) of Gajwel (M) for formation of Ring Road to Gajwel (GORR) under RFCTLARR Act 30 of 2013 .File.No.G2/335/2017,Dated:18.04.2023.
- Land Acquisition of Ac.4.14 ½gts situated within the limits of Raghavapur (V) Siddipet Rural (M) for Excavation of 2R Minor Canal of 6R distributor of under Kaleshwaram Project.File.No.G1/2912/2022,Dated:06.04.2023.
- Land Acquisiton of Ac.6.15¼ gts situated within the limits of Ankampet (V) siddipet rural mandal for excavation of 2R minor of PR Distributor of under Kaleshwaram Project.File.No:G1/4166/2022,Dated:31.03.2023.
- Land Acquisiton of Ac.2.30½ gts situated within the limits of Chinthamadaka (V) siddipet rural mandal for excavation of 2R minor of PR Distributor of under Kaleshwaram Project.File.No:G1/3104/2022,Dated:31.03.2023.
- Land Acquisition of Ac.1.04 Gts situated at Mulugu village of Mulugu Mandal forLaying drinking water pipe line under Moulana Abdul Kalam hyderabad sujala sravanthi GDWSS Phase-I For the drinking water requirement of Hyderabad city.File.No.G2/4410/2017,Dated:31.03.2023.
- Land Acquisition of Ac.5.10 gts situated within the limits of Nagarajupally village of Nangnoor Mandal for excavation LD-10-RM4 minor of sri Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/1231/2023, Dated:31.03.2023.
- Land Acquisition of Ac.0.39 gts Situated at Ankshapur(v) of Nangnoor (M) for excavation of LD10-RM4 Minor of RMC of sri RanganayakaSagar Reservoir under Kaleshwaram Project .File.No:G1/1217/2023,Dated:28.03.2023.
- Land Acquisition of Ac.2.19 gts situated within the limits of Baddipadaga(V) Nangnoor(M) for Excavation canal of LD6-LM1 sub- minor canal of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/4461/2022,Dated:28.03.2023.
- Land Acquisition of Ac.19.32 gts, Ac.0.22 gts and Ac.22.24 gts at Cheryala,Akunoor villages, Cheryala Mandal for Construction of 8R-DR-RMC,D4-RMC,4R-TE-D4-RMC Phase -II Tappaspally Distributory system under JCRDLIS.File.No.G2/1216/2023.,Dated:28.03.2023.
- Land Acquisition of Ac.0.15 gts situated within the limits of Nangnoor(M)Rampur(V) for Excavation of LD6-RM4 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3812/2022,Dated:28.03.2023.
- Land Acquisiton of Ac.2.27½ gts situated within the limits of Machapur (V) siddipet rural mandal for excavation of 6R Distributor in Package-12 main canal of Sri Komuravelli Reservoir under Kaleshwaram Project.File.No:G1/4150/2022,Dated:24.03.2023.
- Land Acquisition of Ac.2.26 gts situated within the limits of Vittalapur (V) Chinnakodur (M) for Excavation of RD3-LM3 minor canal of Sri Ranganayaka sagar reservoir under kaleshwaram Project. File.No.G1/995/2023,Dated:24.03.2023.
- Land Acquisition of Ac.20.06 gts situated within the of limits of Thadkapally (V),Siddipet Mandal for Excavation of 1-L of 1R distributor of Dubbaka Main Canal under Kaleshwaram Project.File.No.G1/5066/2022,Dated:24.03.2023.
- Land Acquisition of Ac.9.00 gts situated within the of Bandarupally (V) , Thoguta (M) for Excavation of 1R distributor of Dubbak Main Canal under Kaleshwaram Project.File.No.G1/3554/2022,Dated:24.03.2023.
- Land Acquisition of Ac.6.33 gts situated within the limits of Chinnakodur (V) and mandal for construction canal of RD3-RM2-RSM4 Sub-minor canal of LMC of Sri Ranganayaka sagar reservoir under kaleshwaram Project. File.No.G1/4000/2022,Dated:24.03.2023.
- Land Acquisition of Ac.3.10 gts situated within the limits of Gonepally (V) chinnakodur (M) for excavation canal of LD4-LM5 minor canal of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.File.No.G1/3842/2022,Dated:23.03.2023.
- Land Acquisition of Ac.1.03 gts situated at Kyasaram (V) of Gajwel (M) for excavation of Gravity canal/tunnel system under Kaleshwaram Project.File..No.G1/3571/2017,Dated:06.03.2023.
- Land Acquisition of Ac.37.31 gts situated within the limits of Venkatapur (V) of Siddipet Rural(M) for Excavation of parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/764/2023,Dated:06.03.2023.
- Land Acquisition of Ac.0.29 gts situated within the limits of Nangnoor(M)Maqdumpur(V) for Excavation of LD6-LM1 minor canalof RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/4462/2022,Dated:02.03.2023.
- Land Acquisition of Ac.0.11 gts situated at Palamakula(V) of Nanganoor(M) for Excavation canal of LD6-LM1 minor canal of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/4460/2022,Dated:02.03.2023.
- Land Acquisition of Ac.1.18 gts situated within the limits of Baddipadaga(V) Nangnoor(M) for Excavation canal of LD6-LM6 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3815/2022,Dated:02.03.2023.
- Land Acquisiton of Ac.9.05½ gts situated within the limits of Narayanaraopet Village and Mandal for construction of RD8-LM2 minor of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/556/2023,Dated:09.02.2023.
- Land Acquisition of Ac.1.27 gts situated within the limits of Ibrahimnagar village of chinnakodur mandal for excavation of RD3-RM2-LSM10 sub minor canal of LMC Sri Ranganayaka sagar reservoir under Kaleshwaram Project.File.No.G1/3144/2021,Dated:04.02.2023.
- Land Acquisition of Ac.3.19 gts situated within the limits of Ibrahimnagar village of chinnakodur mandal for excavation of RD3-RM2-RSM7 sub minor canal of LMC of Sri Ranganayaka sagar reservoir under Kaleshwaram Project.File.No.G1/3269/2021,Dated:04.02.2023.
- Land Acquisition of Ac.3.24 gts situated within the limits of Ibrahimnagar village of chinnakodur mandal for excavation of RD3-RM2-LSM8 sub minor canal of LMC Sri Ranganayaka sagar reservoir under Kaleshwaram Project.File.No.G1/3115/2021,Dated:04.02.2023.
- Land Acquisition of Ac.8.17½ gts situated within the limits of Sikindlapur village of chinnakodur mandal for excavation of RD3-RM2-LSM14 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project.File.No.G1/3140/2021,Dated:01.02.2023.
- Land Acquisiton of Ac.6.27 gts situated within the limits of Chowdaram (V) of chinnakodur (M) for Excavation of RD3-RM2-LSM6 Sub-minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3268/2021,Dated:01.02.2023.
- Land Acquisition of Ac.1.01 gts situated within the limits of Ibrahimnagar village of chinnakodur mandal for excavation canal of RD3 Distributor of Sri Ranganayaka sagar reservoir under Kaleshwaram Project.File.No.G1/3576/2021,Dated:01.02.2023.
- Land Acquisiton of Ac.1.22¼ gts situated within the limits of Narayanaraopet Village and Mandal for Excavation of RD4-RM3 minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/291/2023,Dated:25.01.2023.
- Land Acquisiton of Ac.2.04 gts situated within the limits of Jakkapur(V) of Narayanaraopet(M) for Excavation of RD8-LM2 minor of LMC of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.File.No:G1/292/2023,Dated:25.01.2023.
- Land Acquisiton of Ac.1.19 gts situated within the limits of Malyala Village of Narayanaraopet(M) for Excavation of RD4-RM3 minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/293/2023,Dated:25.01.2023.
- Land Acquisition of Ac.6.15 gts situated within the limits of Nagarajupally village of Nangnoor Mandal for excavation of right Main canal LD-10-RM3 minor of RMC of sri Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/252/2023, Dated:25.01.2023.
- Land Acquisiton of Ac.7.36 gts situated within the limits of Narayanaraopet Village and Mandal for Excavation of RD8-RM2 minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/290/2023,Dated:25.01.2023.
- Land Acquisition of Ac.1.14 gts situated at Palamakula(V) of Nanganoor(M) for Excavation of LD5 of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/289/2023,Dated:25.01.2023.
- Land Acquisition of Ac.7.27 gts situated within the limits of Kasthuripally village of chinnakodur mandal for excavation of RD3-RM2-LSM14 sub minor canal of Sri Ranganayaka sagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3146/2021,Dated:17.01.2023.
- Land Acquisition of Ac.0.34 gts situated within the limits of Marpadaga Village of Kondapak Mandal for Excavation of 1L minor of 1R Distributory in package-12 main canal of Sri Komuravelli Mallanna sagar reservoir .File.No:G1/3894/2022,Dated:17.01.2023.
- Land Acquisition of Ac.4.35 gts situated within the limits of Narayanraopet village and Mandal for Excavation of RD8-LM3 sub-minor canal of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.File.No.G1/6344/2021,Dated:17.01.2023.
- Land Acquisition of Ac.2.33 gts situated within the limits of Sikindlapur village of chinnakodur mandal for excavation of RD3-RM2-LSM11 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project.File.No.G1/3142/2021,Dated:17.01.2023.
- Land Acquisition of Ac.11.32½ gts situated at Tunikibollaram (V) of Mulugu mandal for formation of Sangareddy Distributory canal (D-7R,D-8R) under Kaleshwaram Project.File.No.G2/2116/2020,Dated:10.01.2023.
- Land Acquisition of Ac.36.04 gts situated at Cheelasagar (V) of Mulugu (M) for excavation of distributaries D-9L,D-10L,D-11L,D-12L and 13TE of Turkapally canal of Kondapochamma sagar Reservoir under Kaleshwaram Project.Proc.No.G2/1641/2019,Dated:10.01.2023.
- Land Acquisition of Ac.25.32 gts situated within the limits of Konaipally village of Kukunoorpally Mandal for formation of feeder channel from sri komuravelli mallanna sagar to Tapaspally Reservoir.File.No.G1/1980/2022,Dated:09.01.2023.
- Land Acquisition of Ac.59.19 gts situated within the limits of Mangole village of Kukunoorpally Mandal for formation of feeder channel from sri Komuravelli Mallanna Sagar to Tapaspally Reservoir.File.No.G1/1980/2022, Dated:09.01.2023.
- Land Acquisition of Ac.30.09 gts situated at siddipet Municipality-siddipet Urban mandal for construction of recreation zone Tourism spot like Shilparamam facilities near at Komaticheruvu.File.No.G1/5025/2022,Dated:06.01.2023.
- Land Acquisition of Ac.2.32¾ gts situated in Ramancha (V) of Chinnakodur Mandal and siddipet urban mandal of Imambad village for Widening and strengthening to four lane in km 26/8 to 32/9 Sricilla-siddipet Road in siddipet District(from Ramancha to siddipet town).File.No.G1/365/2022,Dated:05.01.2023.
- Land Acquisition of Ac.7.02 gts situated within the limits of Gurralagondhi village Narayanraopet Mandal for construction of RD3-LM3-LSM1 sub minor canal of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.Lr.No.G1/6341/2021,Dated:05.01.2023.
- Land Acquisition of Ac.30.16 gts situated within the limits of Bandarupally Village of Thoguta Mandal for Excavation of 1R & 1L minor of 1R Distributor canal of dubbaka main canal under Kaleshwaram Project.File.No:G1/1190/2019,Dated:05.01.2023.
- Land Acquisition of Ac.56.20 gts situated at Peddakodur Village of Chinnakodur mandal for formation of new BG Railway Line between Manoharabad to Kothapally. File.No.G3/1523/2016,Dated:05.01.2023
- Land Acquisiton of Ac.9.30 gts situated within the limits of Chowdaram (V) of chinnakodur (M) for Excavation of RD3-RM2-LSM5 Sub-minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3721/2022,Dated:04.01.2023.
- Land Aquisition of Ac.0.14 Gts situated within the limits of Duddeda village of Kondapak mandal for construction new BG Railway line between Manoharabad and Kothapalli villages. File.No.Lr.No.G2/2549/2019,Dated:04.01.01.2023.
- Land Acquisition of 60.3350 gts situated at Inapur and Tapaspally villages of Komuravelli Mandal for construction of Tapaspally Reservoir under JCRDLIS, phase-II,Tapaspally Distributory system.File.No.G2/4937/2022,Dated:04.01.2023.
- Land Acquisition of Ac.8.38 gts situated with in the limits of Khanapur (V) of Nangnoor (M) for excavation of LD10-RM3 Minor of RMC of Sri Ranganayaka sagar Reservoir under Kaleshwaram project Lr.No.G1/5067/2022, Dated:04.01.2023.
- Land Acquisition of Ac.22.31 gts situated within the limits of Medinipur (V) of Kukunoorpally (M) for formation of feeder channel from Sri Komuravelli Mallannasagar to Tapaspally Reservoir.File.No.G1/1980/2022,Dated:04.01.2023.
- Land Acquisition of Ac.20.06 gts situated within the limits of Tadkapally Village of Siddipet Urban Mandal for Excavation of 1L minor of 1R Distributor in Dubbak Main canal under Kaleshwaram Project.File.NoG1/5066/2022,Dated:04.01.2023.
- Land Aquisition of Ac.0.10 Gts situated at Thimmareddypally village of Kondapak mandal for formation of new BG Railway lane between Manoharabad to Kothapalli villages. File.No.G3/1523/2016,Dated:04.01.01.2023.
- Land Acquisition of Ac.0.23 gts Situated at Ankshapur(v) of Nangnoor (M) for excavation of LD10-RM3 Minor of RMC of RanganayakaSagar Reservoir under Kaleshwaram Project .Lr.No:G1/5023/2022,Dated:23.12.2022.
- Land Acquisition of Ac.1.10 gts situated with in the limits of Khanapur (V) of Nangnoor (M) for excavation of LD10 Minor of RMC of Ranganayaka sagar Reservoir under Kaleshwaram project Lr.No.G1/5024/2022, Dated:23.12.2022.
- Land Acquisition of Ac.1.23 gts situated within the limits of Narayanraopet village and Mandal for Construction of RD8-LM1 sub-minor canal under LMC of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.Lr.No.G1/6346/2021,Dated:22.12.2022.
- Land Acquisition of Ac.22.07 gts situated at Chinnakodur Village of Chinnakodur mandal for formation of new BG Railway Line from Manoharabad to Kothapally. File.No.G3/1523/2016,Dated:20.12.2022
- Land Acquisition of Ac.19.23 gts situated at Gouravelli, Ramavaram,Nandaram villages of Akkannapet mandal for Construction of Gouravelli Reservoir bund,submergence and Diversion road.File.No.G3/1062/2022,Dated:19.12.2022.
- Land Acquisition of Ac.26.19 gts situated at Ramavaram village of Akkannapet mandal for establishment of R&R Colony to the PDFs of Gouravelli Reservoir.File.No.G3/2632/2022,Dated:16.12.2022.
- Land Acquisition of Ac.1.00 gts gts situated within the limits of Mittapally (V) of Siddipet (U) Mandal for construction of Sewerage Treatment Plant(STP).File.No.G1/4864/2022,Dated:15.12.2022.
- Land Acquisiton of Ac.7.33½ gts situated within the limits of Jakkapur(V) of Narayanaraopet(M) for Construction of RD3-LM3 sub minor canal of Sri Ranganayaka sagar Reservoir under Kaleshwaram Project.File.No:G1/1684/2022,Dated:07.12.2022.
- Land Acquisition of 0.12 gts situated at Thimmareddypally (V) of Kondapak (M) for excavation of D-4 Distributory of LMC of Tapaspally Reservoir under JCRDLIS Phase-II.File.No.G2/547/2017,Dated:07.12.2022.
- Land Acquisition of Ac. 3.00 gts situated within the limits of Chinnakodur Village of Chinnakodur Mandal for construction of RD3-RM2-RSM6 sub minor canal of sri Ranganayaka sagar reservoir under Kaleshwaram Project .File.No:G1/3218/2021,Dated:05.12.2022.
- Land Acquisition of Ac. 3.06 gts situated within the limits of Chinnakodur Village of Chinnakodur Mandal for construction canal of RD3-RM2-RSM2 sub minors of LMC of sri Ranganayaka sagar reservoir under Kaleshwaram Project .File.No:G1/3267/2021,Dated:05.12.2022.
- Land Acquisition of Ac. 6.33 gts situated within the limits of Chinnakodur Village of Chinnakodur Mandal for construction canal of RD3-RM2-RSM5 sub minor canal of sri Ranganayaka sagar reservoir under Kaleshwaram Project .File.No:G1/3270/2021,Dated:05.12.2022.
- Land Acquisition of Ac. 1.08 gts situated within the limits of Medipally Village of Chinnakodur Mandal for construction canal of RD3-RM2-LSM8 sub minor canal of LMC of sri Ranganayaka sagar reservoir under Kaleshwaram Project .File.No:G1/3109/2021,Dated:05.12.2022.
- Land acquisition of Ac.2.13 gts & 0.1050 gts situated at Thimmareddypalli & Lakudaram villages of Kondapak (m) for construction of new BG Line from Manoharabad and Kothapally. Lr. No. G2/2549/2019, Dated: 30.11.2022.
- Land Acquisition of Ac.3.31¾ gts situated at Lakudaram village of Kondapak mandal for construction of New BG line between manoharabad to kothapally Project approach road work of ROB 101 & ROB 102.File.No.G2/2549/2019,Dated:29.11.2022.
- Land Acquisition of Ac.15.16 gts situated within the limits of Duddeda (V) of Kondapak (M) for Excavation of 1R distributor canal in package-12 main canal under Kaleshwaram Project.File.No:G1/4635/2022,Dated:29.11.2022.
- Land Acquisition of Ac.2.19 gts situated within the limits of Baddipadaga(V) Nangnoor(M) for Excavation of LD6-LM1 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/4461/2022,Dated:22.11.2022.
- Land Acquisition of Ac.4.14 gts situated at Hasanmeerapur village of Dubbak (M) for Excavation of 6-R Distributor of 2-R minor of sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.File.No.G1/4463/2022,Dated:22.11.2022.
- Land Acquisition of Ac.0.29 gts situated within the limits of Nangnoor(M)Maqdumpur(V) for Excavation of LD6-LM1 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/4462/2022,Dated:22.11.2022.
- Land Acquisition of Ac.0.11 gts situated at Palamakula(V) of Nanganoor(M) for Excavation of LD6-LM1 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/4460/2022,Dated:22.11.2022.
- Land Acquisition of Ac.21.11 gts situated within the limits of Marpadaga Village of Kondapak Mandal for Excavation of 1L minor of 1R Distributory in package-12 main canal of Sri Komuravelli Mallanna sagar reservoir .File.No:G1/3895/2022,Dated:18.11.2022.
- Land Acquisition of Ac.0.34 gts situated at Komuravelly village & mandal for construction of Road over Bridge (ROB) for purpose of New BG Line Between manoharabad to kothapally File.No.G2/2549/2019,Dated:08.11.2022.
- Land Acquisition of Ac.25.03 gts situated within the limits of Lakudaram (V) of Kondapak (M) for construction of Earth work Excavation of feeder canal and tunnel of for Sri Komuravelli Mallannasagar Reservoir to Tapaspally Reservoir.File.No.G1/4021/2021,Dated:03.11.2022.
- Land Acquisiton of Ac.6.15¼ gts situated within the limits of Ankampet (V) siddipet rural mandal for construction of 6R-Distributor of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/4166/2022,Dated:31.10.2022.
- Land Acquisition of Ac.5.28 gts situated at Jangapally (V) of Mirdoddi (M) for excavation of 1-R Distributor of Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/3082/2020,Dated:28.10.2022.
- Land Acquisiton of Ac.2.27½ gts situated within the limits of Machapur (V) siddipet rural mandal for construction of 6R-Distributor of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/4150/2022,Dated:28.10.2022.
- Land Acquisition of Ac.25.03 gts situated within the limits of Lakudaram (V) of Kondapak (M) for Excavation of feeder canal and tunnel of for Sri Komuravelli Mallannasagar Reservoir to Tapaspally Reservoir.File.No.G1/4021/2021,Dated:21.10.2022.
- Land Acquisition of Ac.3.39½ gts & Ac.0.26½ gts situated at Mittapally & Narsapur villages of Siddipet (U) Mandal for embankment for formation of new BG Railway between Manoharabad and Kothapalli.File.No.G3/1523/2016,Dated:21.10.2022.
- Land Acquisition of Ac.0.20 gts situated within the limits of Yellareddypet (V) of Thoguta (M) for Excavation of Pumphouse of Dubbaka main canal of Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project.File.No.G1/4020/2022,Dated:21.10.2022.
- Land Acquisition of Ac.0.11 gts situated at Ramachandrapur village of Jagadevpur mandal for construction of Approaches of ROB at km 73+770 near Ramchandrapur Village manoharabad-kothapally new BG Line crossing for formation of approaches along with the service Road.File.No.G2/2549/2019,Dated:18.10.2022.
- Land Acquisition of Ac.30.16 gts situated within the limits of Bandarupally Village of Thoguta Mandal for Excavation of 1R & 1L minor of 1R Distributor canal of dubbaka main canal of sri Komuravelli Mallanna sagar reservoir .File.No:G1/1190/2019,Dated:17.10.2022.
- Land Acquisition of Ac. 6.33 gts situated within the limits of Chinnakodur Village of Chinnakodur Mandal for construction of RD3-RM2-RSM4 sub minor canal under LMC of sri Komuravelli Mallanna sagar reservoir .File.No:G1/4000/2022,Dated:17.10.2022.
- Land Acquisition of Ac.0.34 gts situated within the limits of Marpadaga Village of Kondapak Mandal for Excavation of 1L minor of 1R Distributory in package-12 main canal of Sri Komuravelli Mallanna sagar reservoir .File.No:G1/3894/2022,Dated:13.10.2022.
- Land Acquisition of Ac.5.02 gts situated at mulugu Village & Mandal headquarters for alienation to TSIIC for establishment of Industrial Park .File.No.E1/5473/2021,Dated:13.10.2022.
- Land Acquisition of Ac.3.10 gts situated within the limits of Gonepally Village of Chinnakodur Mandal for Excavation of LD4-LM5 of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram project.File.No.G1/3842/2022,Dated:10.10.2022.
- Land Acquisiton of Ac.1.12 gts situated at Narayanaraopet(M) Jakkapur(V) for Excavation of RD8-LM3 minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/6347/2021,Dated:10.10.2022.
- Land Acquisition of Ac.3.01 gts situated within the limits of Konaipally village of Nangnoor Mandal for Excavation of LD4(1)-LM1 Minors of right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/3843/2022,Dated:10.10.2022.
- Land Acquisiton of Ac.4.24 gts situated at Narayanaraopet(M) Narayanaraopet(V) for Excavation of RD9-LM2 minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/6342/2021,Dated:10.10.2022.
- Land Acquisition of Ac.0.15 gts situated within the limits of Nangnoor(M)Rampur(V) for Excavation of LD6-RM4 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3812/2022,Dated:01.10.2022.
- Land Acquisition of Ac.6.24 gts situated within the limits of Nangnoor(M)Nangnoor(V) for Excavation of LD6-RM3 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3816/2022,Dated:01.10.2022.
- Land Acquisition of Ac.4.05 gts situated within the limits of Nangnoor(M)Maqdumpur(V) for Excavation of LD6-RM4 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3811/2022,Dated:01.10.2022.
- Land Acquisition of Ac.3.25½ gts situated within the limits of Nangnoor(M)Baddipadaga(V) for Excavation of LD6-LM5 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3812/2022,Dated:01.10.2022.
- Land Acquisition of Ac.3.28 gts situated within the limits of Nangnoor(M)Baddipadaga(V) for Excavation of LD6-LM4 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3814/2022,Dated:01.10.2022.
- Land Acquisition of Ac.1.18 gts situated within the limits of Nangnoor(M)Baddipadaga(V) for Excavation of LD6-LM6 minor of RMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/3815/2022,Dated:01.10.2022.
- Land Acquisition of Ac.371.21 gts in Sy.No.845,1209 and 1266 situated at wargal village and mandal headquaters for establishment of Industrial Park.Proc.No.E1/4105/2021,Dated:30.09.2022.
- Land Acquisition of Ac. 9.38 gts situated within the limits of Chinnakodur Village of Chinnakodur Mandal for Excavation of RD3-RM2-LSM5 sub minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.no.G1/3720/2022,Dated:28.09.2022.
- Land Acquisiton of Ac.2.08gts situated within the limits of Chowdaram (V) of chinnakodur (M) for Excavation of RD3-RM2-LSM5 Sub-minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3721/2022,Dated:28.09.2022.
- Land Acquisition of Ac.1.01 gts situated at Chinnakodur Mandal Ibrahimnagar village for construction of RD3-Distributor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3576/2022,Dated:19.09.2022.
- Land Acquisition of Ac.2.32¾ gts situated in Ramancha (V) of Chinnakodur Mandal and siddipet urban mandal of Imambad village for Widening and strengthening to four lane in km 26/8 to 32/9 Sricilla-siddipet Road in siddipet District(from Ramancha to siddipet town).File.No.G1/365/2022,Dated:19.09.2022.
- Land Acquisition of Ac.0.08 gts situated at within the limits of Komuravelly village & mandal for construction of Primary Health Center.File.No.G1/3566/2022,Dated:14.09.2022.
- Land Acquisition of Ac.89.25 Gts situated at Gudikandula Village of Thoguta mandal for construction of 2-L distributor canal of main canal of Sri kommurvelli Mallannasagar Reserviour under Kaleshwaram Project.File.No.G1/1372/2019,Dated:14.09.2022.
- Land Acquisition of Ac.21.01 gts situated within the limits of Bandarupally (V) of Thoguta (M) for excavation of 1R Distributory to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/3554/2022,Dated:14.09.2022.
- Land Acquisition of Ac.24.29 gts situated at Baswapur Village of Koheda mandal for construction of LD6 Right Main Canal of RMC for Ranganayakasagar under Kaleshwaram Project.File.No:G1/877/2020,Dated:02.09.2022.
- Land Acquisition of Ac.2.30½ gts situated at Chinthamadaka Village of Siddipet mandal for excavation of public purpose,namely,2R Minor of 6R Distributor under main canal of Sri Komuravelli Mallanna sagar Reservoir under kaleshwaram Project. File.No.G1/3104/20222,Dated:23.08.2022.
- Land Acquisition of Ac.56.20 gts situated at Peddakodur Village of Chinnakodur mandal for formation of new BG Railway Lane from Manoharabad to Kothapally. File.No.G3/1523/2016,Dated:22.08.2022
- Land Acquisition of Ac.22.07 gts situated at Chinnakodur Village & mandal for formation of new BG Railway Lane from Manoharabad to Kothapally. File.No.G3/1523/2016,Dated:22.08.2022
- Land Acquisition of Ac.102.13½ gts situated at Mutrajpally village of Gajwel Mandal for construction of Rehabilitation & Resettlement colony for the project Displaced families of sri Komuravelli Mallannasagar Reservoir.Proc.No.G1/521/2018,Dated:13.08.2022.
- Land Acquisition of Ac.10.30 gts situated at Mutrajpally village of Gajwel Mandal for construction of Rehabilitation & Resettlement colony for the project Displaced families of sri Komuravelli Mallannasagar Reservoir.Proc.No.G1/521/2018,Dated:13.08.2022.
- Land Acquisition of Ac.421.23 gts in Sy.No.1495,1510 situated at Wargal village and mandal headquaters for establishment of Industrial Park under TSIIC.Proc.No.E1/4105/2021,Dated:06.08.2022.
- Land Acquisition of Ac.1.03½ Gts situated at Singannaguda (V) of Mulugu (M) for construction of sangaressy Distributory Canal (D-10R) undr Kaleshwaram Project.File.No.G2/1712/2020,Dated:30.07.2022.
- Land Acquisition of Ac.60.07 gts situated within limits of Tapaspally Village Komuravelli Mandal for excavation of public purpose, namely, open canal, Tunnel CC ling and CD & CM works of feeder canal from Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project.File.No.G1/445/2022,Dated:27.07.2022.
- Land Acquisition of Ac.0.34 gts situated at Komuravelly village & mandal for construction of New BG line from manoharabad to kothapally Project of Road Over Bridge (ROB).File.No.G2/2549/2019,Dated:23.07.2022.
- Land Acquisition of Ac.4.14 ½gts situated within the limits of Raghavapur (V) Siddipet Rural (M) for Excavation of 2R Minor Canal of 6R distributory canal in package-12 of Sri Ranganayaka Sagar Reservoir under Kaleshwaram Project.File.No.G1/2912/2022,Dated:22.07.2022.
- Land Acquisition of Ac.6.08 gts situated within the limits of Baddipadaga Village Nangnoor (M) for Excavation of LD6-LM1 distributory of RMC of Sri Ranganayaka Sagar Reservoir under Kaleshwaram Project.File.No.G1/6006/2021,Dated:19.07.2022.
- Land Acquisition of Ac.0.30 gts situated at Bayyaram Village of Gajwel Mandal for construction of Ramayampet Distributory Canal (D-1R).File.No.G2/1957/2019,Dated:08.07.2022.
- Land Acquisition of Ac.7.02 gts situated within the limits of Gurralagondhi village Narayanraopet Mandal for Excavation of RD3-LM3-LSM1 sub minor canal under LMC of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.Lr.No.G1/6341/2021,Dated:07.07.2022.
- Land Acquisition of Ac.8.17 gts situated within the limits of Gurralagondhi village Narayanraopet Mandal for Excavation of RD8-LM3 minor canal under LMC of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.Lr.No.G1/6345/2021,Dated:07.07.2022.
- Land Acquisition of Ac.1.23 gts situated within the limits of Narayanraopet village and Mandal for Excavation of RD8-LM1 minor canal under LMC of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.Lr.No.G1/6346/2021,Dated:07.07.2022.
- Land Acquisition of Ac.4.35 gts situated within the limits of Narayanraopet village and Mandal for Excavation of RD8-LM3 minor canal under LMC of Sri Ranganakayaka sagar Reservoir under Kaleshwaram Project.Lr.No.G1/6344/2021,Dated:07.07.2022.
- Land Acquisition of Ac.82.38 gts situated at Gouravelli Village of Akkannapet Mandal for formation of Gouravelli Reservoir.Proc.No.B/314/2021,Dated:01.07.2022.
- Land Acquisition of Ac.0.11 gts situated at Janagama Village of Akkannapet Mandal for formation of Gouravelli Reservoir.Proc.No.B/314/2021,Dated:01.07.2022.
- Land Aquisition of Ac.0.03 gts situated within the limits of Gurralagondi village of Narayanraopet Mandal for Excavation of RD3-LM4 minor of Sri Ranganayakasagar Reservoir under Kaleshwaram project.File.No.G1/2415/2022,Dated:28.06.2022
- Land Aquisition of Ac.1.02 gts situated within the limits of jakkapur village Narayanaraopet Mandal for excavation canal of RD3-LM3-LSM2 subminor of LMC of sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No.G1/6343/2021,Dated:28.06.2022.
- Land Acquisition of Ac.4.11 gts situated in Danampally (V) Cheriyal (M) for Excavation of LD9-Lm1&RM1 Distributor of RMC of Ranganayakasagar Resevoir under Kaleshwaram Project.File.No.G1/3080/2020,Dated:18.06.2022.
- Land Acquisition of Ac.3.06 gts situated at Chinnakodur village and mandal for excavation of RD3-RM2-RSM2 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3267/2021,Dated:06.06.2022.
- Land Acquisition of Ac.6.33 gts situated at Chinnakodur village and mandal for excavation of RD3-RM2-RSM5 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3270/2021,Dated:06.06.2022.
- Land Acquisition of Ac.6.27 gts situated at Chowdaram village of Chinnakodur mandal for excavation of RD3-RM2-RSM6 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3268/2021,Dated:06.06.2022.
- Land Acquisition of Ac.7.03½ gts situated at Vittalapur village of Chinnakodur mandal for excavation of RD3-RM2-LSM2 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3271/2021,Dated:06.06.2022.
- Land Acquisition of Ac.3.19 gts situated at Ibrahimnagar village of chinnakodur for excavation of RD3-RM2-RSM7 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3269/2021,Dated:06.06.2022.
- Land Acquisition of Ac.6.27 gts situated at Ibrahimnagar village of chinnakodur for excavation of RD3-RM2-LSM9 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3321/2021,Dated:06.06.2022.
- Land Acquisition of Ac.15.25 gts situated at Allipur Village of Chinnakodur mandal for excavation of RD3-RM2-LSM2 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3217/2021,Dated:01.06.2022.
- Land Acquisition of Ac. 3.00 gts situated within the limits of Chinnakodur Village of Chinnakodur Mandal for Excavation of RD3-RM2-RSM6 sub minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project Preliminary Notification-Extension Letter.Proc.No.G1/3218/2021,Dated:30.05.2022.
- Land Aquisition of Ac.4.02 gts situated within the limits of Ramunipatla (V) of chinnakodur mandal for Exacavation of RD1-LM4 canal of Ranganayaka sagar reservoir under Kaleshwaram Project.File.No:G1/1685/2022,Dated:29.05.2022.
- Land Acquisition of Ac.6.26 gts situated at Sangapur village of Gajwel Mandal for construction of 2BHK houses to the Displaced families under sri Komuravelli Mallannasagar Reservoir.Proc.No.G1/250/2019,Dated:29.05.2022
- Land Acquisition of Ac.7.27 gts situated at Kasturipally village of chinnakodur mandal for excavation of RD3-RM2-LSM14 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3146/2021,Dated:25.05.2022.
- Land Acquisition of Ac.2.33 gts situated at Sikindlapur village of chinnakodur mandal for excavation of RD3-RM2-LSM11 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3142/2021,Dated:25.05.2022.
- Land Acquisition of Ac.8.17½ gts situated at Sikindlapur village of chinnakodur mandal for excavation of RD3-RM2-LSM14 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3140/2021,Dated:25.05.2022.
- Land Acquisition of Ac.1.27 gts situated at Ibrahimnagar Village of Chinnakodur mandal for excavation of RD3-RM2-LSM10 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3144/2021,Dated:23.05.2022.
- Land Acquisition of Ac.3.24 gts situated at Ibrahimnagar Village of Chinnakodur mandal for excavation of RD3-RM2-LSM8 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3115/2021,Dated:23.05.2022.
- Land Acquisition of Ac.1.08 gts situated at Medipally Village of Chinnakodur mandal for excavation of RD3-RM2-LSM8 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3109/2021,Dated:23.05.2022.
- Land Acquisition of Ac.7.39 gts situated at Machapur Village of Chinnakodur mandal for excavation of RD3-RM2-LSM2 sub minor left main canal of Sri Ranganayakasagar reservoir under Kaleshwaram Project-Preliminary Notification Extension letter.Proc.No.G1/3106/2021,Dated:23.05.2022.
- Land Aquisition of Ac.0.27 gts situated within the limits of Ramunipatla (V) of chinnakodur mandal for Exacavation of RD1-RM1-LSM1 sub minor canal under LMC of Ranganayaka sagar reservoir under Kaleshwaram Project.File.No:G1/3138/2021,Dated:21.05.2022.
- Acquisition of land to an extent of Ac.28.04 gts, Ac.47.16 and Ac.33.04 gts situated within the limits of Konaipally, Mangle and Medhinipur villages of kondapak mandal for Earth Work excavation of open canal, tunnel CC lining and construction of CD & CM works of feeder canal from Sri Komuravelli Mallanna sagar Reservoir to Tapaspally Reservoir under Kaleshwaram project.File.No.G1/1980/2021,Dated:09.05.2022.
- Land Acquisition of Ac.2.12 gts situated within the limits of Ramancha village of chinnakodur mandal for excavation canal of RD4-LM1-LSM1 Sub-minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No.G1/4043/2021,Dated:02.05.2022.
- Land Acquisition of Ac.5.28 gts situated at Jangapally (V) of Mirdoddi (M) for excavation of 1-R Distributor of Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/3082/2020,Dated:02.05.2022.
- Land Acquisition of Ac.12.275 gts situated at Laxmakkapally and Ac.12.145 gts at srirampur villages ,Mulugu Mandal for construction of Sangareddy main canal.File.No:G2/1210/2021,Dated:30.04.2022.
- Land Acquisition of Ac.88.11 gts situated at Gouravelli and Janagama villages of Akkannapet Mandal for Formation of Gouravelli Reservoir,File.No:G3/1062/2017,Dated:29.04.2022.
- Land Acquisiton of Ac.19.25 gts situated at Chinnakodur(M) Yellaipally H/O Allipur(V) for Excavation of Public purpose namely package-II,link VI Pressure main pipeline for Dumping Yard under Kaleshwaram Project.File.No:G1/1686/2022,Dated:26.04.2022.
- Land Acquisiton of Ac.3.26 gts situated at Chinnakodur(M) Yellaipally H/O Allipur(V) for Excavation of Public purpose namely package-II,link VI for Ananthagiri Reservoir Kaleshwaram Project.File.No:G1/1687/2022,Dated:26.04.2022.
- Land Acquisiton of Ac.4.24 gts situated at Narayanaraopet(M) Narayanaraopet(V) for Excavation of RD9-LM2 minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/6342/2021,Dated:26.04.2022.
- Land Acquisiton of Ac.7.3350 gts situated at Narayanaraopet(M) Jakkapur(V) for Excavation of RD3-LM3 minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/1684/2021,Dated:26.04.2022.
- Land Acquisiton of Ac.1.12 gts situated at Narayanaraopet(M) Jakkapur(V) for Excavation of RD8-LM3 minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/6347/2021,Dated:26.04.2022.
- Land Acquisition of Ac.38.20 gts situated at Gajwel (V) & (M) Headquarters for establishment of Rehabilitation & Resettlement Colony for the Project Displaced Families of Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No:G1/1125/2019,Dated:16.04.2022.
- Land Acquisiton of Ac.1.02 gts situated within the limits of Jakkapur Village of Narayanaraopet(M) for Excavation of RD3-LM3-LSM2 sub minor canal under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/6343/2021,Dated:16.04.2022.
- Land Acquisiton of Ac.4.02 gts situated within the limits of Malyala Village of Narayanaraopet(M) for Excavation of RD4-LM1 minor canal of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3459/2021,Dated:16.04.2022.
- Land Acquisiton of Ac.1.05 gts situated at Narayanaraopet(M) Gurralagondi(V) for Excavation Canal of RD4-RM2 minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3460/2021,Dated:12.04.2022.
- Land Acquisiton of Ac.3.33 gts situated at Chinnakodur(M) Machapur(V) for Excavation Canal of RD3-RM2-LSM3 Sub-minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3108/2021,Dated:12.04.2022.
- Land Acquisiton of Ac.0.20 gts situated at Narayanaraopet(M) Malyala(V) for Excavation Canal of RD5-LM2 minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3462/2021,Dated:12.04.2022.
- Land Acquisiton of Ac.1.19 gts situated at Narayanaraopet(M) Malyala(V) for Excavation Canal of RD4-LM1-LSM1 minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3461/2021,Dated:12.04.2022.
- Land Acquisiton of Ac.2.02 gts situated at Narayanaraopet(M) Malyala(V) for Excavation Canal of RD4-RM2 minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3465/2021,Dated:12.04.2022.
- Land Acquisiton of Ac.3.14 gts situated at Siddipet(U) Mandal Velkatur(V) for Excavation Canal of LD4-1 distrributary of Right main Canal of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/2744/2020,Dated:28.03.2022.
- Land Acquisiton of Ac.3.13 gts situated at Chinnakodur(M) Machapur(V) for Excavation Canal of RD3-RM2-LSM1 Sub-minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3114/2021,Dated:28.03.2022.
- Land Acquisiton of Ac.3.07 gts situated at Chinnakodur(M) Gangapur(V) for Excavation Canal of RD4-RM1 minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3322/2021,Dated:28.03.2022.
- Land Acquisiton of Ac.2.08gts situateed at Chinnakodur (M) Chowdaram (V) for Excavation of RD3-RM2-LSM8 Sub-minor of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3113/2021,Dated:28.03.2022.
- Land Acquisition of Ac.40.26 gts situated at Gajwel (V) & (M) Headquarters for establishment of Rehabilitation & Resettlement Colony for the Project Displaced Families of Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No:G1/1125/2019,Dated:11.03.2022.
- Land Acquisition of Ac.1.12 Gts situated at Siddipet (M) Pullur village for Excavation of RD5-l-M2distributor of left main canal of Ranganayaka sagar Reservoir Kaleshwaram Project.File.No:Gl / 3464 / 2027, Dated:15.02.2022
- Land Acquisition of Ac.6.26 gts situated at Sangapur village of Gajwel Mandal for establishment of Rehabilitation & Resettlement colony for the project Displaced families of sri Komuravelli Mallannasagar Reservoir.Proc.No.G1/250/2019,Dated:28.01.2022.
- Land Acquisition of Ac.102.13½ gts situated at Mutrajpally village of Gajwel Mandal for establishment of Rehabilitation & Resettlement colony for the project Displaced families of sri Komuravelli Mallannasagar Reservoir.Proc.No.G1/521/2018,Dated:28.01.2022.
- Land Acquisition of Ac.10.12 Gts situated at Gajwel(M),Jaligama(V) Acquisition of land for Construction of Gravity canal &Tunnel Audit-5 system under Kaleshwaram Project.File.No:Gl /2857/2020,Dated:12.01.2022
- Land Acquistion of Ac.3.12 Gts situtated at Thoguta mandal for Excavation of f Presesurized piped irrigation system of Package – 12 of Main canals of Sri Komuravelli Mallanna Sagar Reserviour under Kaleshwaram Project.File.No:G1/6339/2021,Dated:19.01.2021
- Land Acquisition of Ac.36.04 Gts situated at Cheelasagar village of Mulugu Mandal for formation Turkapally Distributory canal under Kaleshwaram Project.File.No.G2/1641/2019,Dated:12.01.2022.
- Land Acquisition of Ac.3.36 gts situated at Ananthagiripally village of wargal mandal for construction of Sangareddy Distributory (11R) Canal under Kaleshwaram Project.Proc.no:G2/1710/2020,Dated:04.01.2022.
- Land Acquistion of Ac.18.22½ Gts situated at Chinnakodur Mandal for Excavation of , RD3-RM 2-LSM14,RD3-RM2-RSM6,RDS-LMI,RD5-LM2, RD5-LM1, RD3-RM2-RSM1,RD3-RM2-RSM3,RD3-RM2-RSM1,RD3-RM2-LSM4,RD3-RM2-LSM1 minor and sub.minor canals under LMC of Sri Ranganayakasagar Reserviour under Kaleshwaram Project.File.No:G1/3143/2021,Dated:30.12.2021
- Land Acquisition of Ac.12.30½ gts situated at Veluru village of wargal mandal for construction of Sangareddy Distributory (11R) Canal under Kaleshwaram Project.Proc.No:G2/1710/2020,Dated:17.12.2021.
- Land Acquisition of Ac.6.32 gts situated at wargal village & mandal for construction of Sangareddy Distributory (3R) Canal under Kaleshwaram Project.Proc.no:G2/1710/2020,Dated:17.12.2021.
- Land Acquisition of Ac.0.33 gts situated at Gouraram village of Wargal mandal for construction of Sangareddy Distributory (3R) Canal under Kaleshwaram Project.Proc.no:G2/1710/2020,Dated:17.12.2021.
- Land Acquisition of Ac.10.32 gts situated at Minajipet village of Wargal mandal for construction of Sangareddy Distributory (11R) Canal under Kaleshwaram Project.Proc.no:G2/1710/2020,Dated:17.12.2021.
- Land Acquisition of Ac.0.36½ gts situated at Mulugu village & mandal for construction of Sangareddy Distributory (D-5R,D-6R) Canal under Kaleshwaram Project.Proc.no:G2/1653/2020,Dated:17.12.2021.
- Land Acquisition of Ac.4.14 gts situated at Ramachandrapur village of Wargal mandal for construction of Sangareddy Distributory (11R) Canal under Kaleshwaram Project.Proc.no:G2/1654/2020,Dated:17.12.2021.
- Land Acquisition of Ac.18.15½ gts situated at ThunikiKhalsa village of Wargal Mandal for construction of Sangareddy Distributory (11R) Canal under Kaleshwaram Project.Proc.No.G2/1654/2020-II,Dated:17.12.2021.
- Land Acquisition of Ac.0.14½ gts situated at Thuniki Maqtha Village of Wargal mandal for construction of Sangareddy Distributory (11R) Canal under Kaleshwaram Project.Proc.No.G2/1654/2020-I,Dated:17.12.2021.
- Land Acquisition of Ac.6.32 gts situated at Wargal village & Mandal for construction of Sangareddy Distributory(3R) Canal under Kaleshwaram project.Proc.No.G2/1710/2020,Dated:17.12.2021.
- Land Acquisition of Ac.13.02½ gts situated at Wargal village & Mandal for construction of Sangareddy Distributory(4R) Canal under Kaleshwaram project.Proc.No.G2/1710/2020,Dated:17.12.2021.
- Land Acquisition of Ac.12.30½ gts situated at veluru village of wargal Mandal for construction of Sangareddy Distributory(11R) Canal under Kaleshwaram project.Proc.No.G2/1710/2020,Dated:7.12.2021.
- Land Acquisition of Ac.2.37 Gts situtated at Raghav11Rapur village of Siddipet(R) Mandal for Excavation of RD7-LM1 Minor of RMC of Sri Ranganayakasagar Reserviour under Kaleshwaram Project.File.No.G1/6056/2021,Dated:09.12.2021
- Land Acquisition of Ac.6.08 gts situated within the limits of Baddipadaga village of Nangnoor Mandal for Excavation of LD6-LM1-minor of SAri Ranganayakasagar Reservoir under Kaleshwaram project. File.No.G1/6006/2021,Dated:09.12.2021.
- Land Acquisition of Ac.20.24 gts situated within the limits of Bhumpally village of Mirdoddi Mandal for Excavation of 1-R Distributor of Mallannasgara Reservoir under Kaleshwaram project.File.No.G1/3082/2020,Dated:09.12.2021.
- Land Acquisition of Ac.22.24½ gts situated within the limits of Khazipur village of Mirdoddi Mandal for Excavation of 1-R Distributor of Mallannasgara Reservoir under Kaleshwaram project.File.No.G1/3082/2020,Dated:09.12.2021.
- Land Acquisition of Ac.11.25½ gts situated within the limits of Gundareddypally Village of Koheda Mandal for formation of canals under Anthagiri Reservoir under Kaleshwaram Project. File.No.G1/4643/2021,Dated:09.12.2021.
- Land Acquisition of Ac.3.33 gts situated within the limits of Pullur Village of Siddipet (Rural) Mandal for Excavation of RD5-LM1 of Ranganayakasagar Reservoir under Kaleshwaram project. File.No.G1/3463/2021,Dated:09.12.2021.
- Land Acquisition of Ac.4.02 gts situated within the limits of Rajgopalpet Village of Nangnoor Mandal for Excavation of LD4-RM3 minor of RMC of Ranganayakasagar Reservoir under Kaleshwaram project. File.No.G1/15876/2020, Dated:09.12.2021.
- Land Acquisition of 3.08 gts situated within the limits of Thimmareddypally (V) of Kondapak (M) for excavation of 1R of D4 LMC of Tapaspally Tank under Devadula Lift Irrigation Project.File.No.G2/1097/2019,Dated:26.11.2021.
- Land Acquisition of 14.02½ gts situated at vishwnathpally (V) of Kondapak (M) for excavation of 2LA of D3 LMC of Tapaspally Tank under Devadula Lift Irrigation Project.Proc.No.G2/1096/2019,Dated:26.11.2021.
- Land Acquisition of Ac.89.25 Gts situated at Gudikandula Village of Thoguta mandal for construction of 2L distributor of Sri kommurvelli Mallannasagar Reserviour under Kaleshwaram Project.File.No.G1/1372/2019,Dated:11.10.2021
- Land Acquisition of Ac.18.24½ Gts situated at Kokkonda village of Mulugu mandal for excavation of Sangareddy Main Canal under Kaleshwaram project.File.No.G2/2343/2020,Dated:11.10.2021.
- Land Acquisition of Ac.5.07 gts situated at Gajwel, Dharmareddipally and Jaligama villages of Gajwel Mandal for construction of service road both sides of Gajwel Ring Road.File.No.G2/335/2017,Dated:07.10.2021.
- Land Acquisition of Ac.5.20 gts situated within the limits of Chinnakodur(M)Obulapur(V) for Excavation of LD4-LM5 minor of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/1290/2019,Dated:05.10.2021.
- Land Acquisition of Ac.4.18 gts situated within the limits of Chinnakodur(M)Obulapur(V) for Excavation of LD4-RM5 minor of Sri Ranganayakasagar Reservoir under Kaleshwaram Project .File.No.G1/1290/2020,Dated:05.10.2021.
- Land Acquisition of Ac.5.20 gts. situated in Obulapur Village of Chinnakodur Mandal, Siddipet District for Excavation of LD4-LMS minor canal of Ranganayakasagar Reservoir, under Kaleshwaram Proiect.File.No.G1/1290/2019,Dated:05.10.2021
- Land Acquisition of Ac.4.33 gts situated at Dhoolmitta (V) and Mandal for excavation of Distributaries,Minors and sub-minors (16L-D3-LMC(extension) and D3-LMC) of Tapaspally Phase-II Left Main Canl under Sri.J.Chokka Rao Devadula Lift Irrigation Scheme.File.No.G3/1310/2020,Dated:27.09.2021.
- Land Acquisition of Ac.4.03½ gts situated at Karkapatla and Dhamarakunta villages of Markook (M) for construction of Thurkapally Main canal under Kaleshwaram project.File.No.G2/756/2019,Dated:18.09.2021.
- Land Acquisition of Ac.1.31½ gts situated within the limits of Manogle (V) of Kondapak (M) for Acquisition for execution of lined Garvity canal for Mallannasagar Reservoir under Kaleshwaram project.File.No.G1/4815/2021,Dated:14.09.2021.
- Land Aquisition of Ac.4.02 gts situated Rajgopalpet Village of Nangnoor Mandal for Construction of LD4-RM3-Minor of Ranganayakasagar Reservoir under Kaleshwaram Project.File.No.G1/1876/2020,Dated:06.09.2021
- Land Acquisition of Ac.11.25½ gts situated within the limits of Gundareddypally (V) of Koheda Mandal for Excavation of LD6-LM1/LMS8,LD6-LM1/LMS9,RMC/LD6-LM1 canals of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No.G1/4643/2021,Dated:01.09.2021.
- Land Acquisition of Ac.23.18 gts situated within the limits of Chinnakodur Village of Chinnakodur Mandal for Excavation of RD3-RM2-LSM1 sub minor canal under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.no.G1/4041/2021,Dated:01.09.2021.
- Land Acquisition of Ac.1.07 Gts and Ac.1.20¾ gts Sangareddy canal and to an extent of Ac.1.20¾ gts Ravalkole canal total extent of Ac.2.27¾ situated at Kothur (V) of Mulugu (M) for exvacation of Sangareddy main canal and Ravalkole canal of Kondapochamma sagar reservoir under Kaleshwaram project.File.No.G2/1430/2019,Dated:07.08.2021
- Land Acquisition of Ac.4.07 gts situated at Banglavenkatapur (V) of Gajwel (M) for construction of Ramayampet Distributory canal (D-8L) under Kaleshwaram project.File.No.G2/1966/2019,Dated:07.08.2021.
- Land Acquisition of Ac.421.23 gts for establishment of Industrial park at Wargal Village and Mandal.File.No:E1/4105/2021,Dated:07.08.2021.
- Land Acquisition of Ac.8.07 gts situated at Kamalayapally Village of Maddur Mandal for Excavation of LD-10 distributor of Ranganayakasagar Reserviour under kaleshwaram Project.File.No.G1/782/2020,Dated:06.08.2021
- Land Acquisition of Ac.0.20 gts situated at mulugu Village & Mandal for improvements to mulugu to Karkapatla road from Km 0/0 to 13/0. File.No.G2/1717/2021,Dated:27.07.2021.
- Land Acquisition of Ac.2.12 gts situated at Ramancha (V) of Chinnakodur (M) for Excavation of RD4-LM1-LSM1 sub minor canal under LMC of sri Ranganayakasagar Reservoir under Kaleshwaram project.FAile.No.G1/4043/2021,Dated:26.07.2021.
- Land Acquisition of Ac.1.31 gts situated within the limits of chinnakodur (V) & (M) for Excavation of RD4-RM1 minor canal under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No.G1/4042/2021,Dated:26.07.2021.
- Land Acquisition of Ac.10.06 gts for Excavation of RD3-RM2-LSM7 sub minor canal under LMC of LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No.G1/4044/2021,Dated:26.07.2021.
- Land Acquisition of Ac.0.08 gts situated at Mulugu (V)&(M) for construction of sangareddy main canal under kaleshwaram project.File.No.G2/2091/2019,Dated:17.07.2021.
- Land Acquisition of Ac.07.3925 gts situated at chinna thimmapur (V) of Mulugu (M) for establishment of vegetable hub with cold chain facilities for the welfare of farming community.File.No.G2/1790/2021,Dated:14.07.2021.
- Land Acquisition of Ac.4.33 gts situated at Dhoolmitta (V) & (M) for Excavation of Distributaries,Minors of Tapaspally left Main Canal Distributaries under J.Chokka Rao Devadula Lift Irrigation Scheme.File.No:G3/1310/2010,Dated:12.07.2021.
- Land Acquisition of Ac.1.07 gts & Ac.0.19 gts situated at Singannaguda & Achaipally villages & Mulugu mandal for formation of Snagareddy Main canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1971/2019,Dated:12.07.2021.
- Land Acquisition of Ac.1.12, Ac.3.33 gts situated at Siddipet(Rural) Mandal of Pullur village for Excavation of RD5-LM2,RD5-LM1 minor canals under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3464/2021,G1/3463/2021,Dated:29.06.2021.
- Land Acquisition of Ac.2.02, 4.03,1.05,0.20,2.27,2.14,1.19 gts situated at Narayanraopet Mandal of Malyala,Malyala,Gurralagondi,Malyala, Malyala,narayanraopet,narayanraopet,Malyala,Malyala,villages for Excavation of RD4-RM2,RD4-LM1,RD4-RM2,RD5-LM2,RD6-RM1,RD7-LM1,RD9-RM1,RD4-LM2 minor and RD4-LM1-LSM1 sub minor canals under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3465/2021,G1/3459/2021,G1/3460/2021,G1/3462/2021,G1/3457/2021,G1/3456/2021,G1/3466/2021,G1/3458/2021,G1/3461/2021,Dated:29.06.2021.
- Land Acquisition of Ac.21.15 gts situated within the limits of Duddeda (V) of Kondapak (M) for formation of 1R distributary on Sri Komuravelli Mallannasagar canal under Kaleshwaram Project.File.No:G1/2332/2019,Dated:22.06.2021.
- Land Acquisition of Ac.4.11 gts situated within the limits of Danampally Village of Cheriyal Mandal for Excavation of LD9-LM1 & RM1 distributaries and minor under RMC of Ranganayakasagar Reservior under Kaleshwaram Project.File.No:G1/3080/2020,Dated:22.06.2021.
- Land Acquisition of Ac.6.27 gts situated at Chinnakodur Mandal Ibrahimnagar village for Excavation of RD3-RM2-LSM9 Sub minor canals under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3321/2021,Dated:11.06.2021.
- Land Acquisition of Ac.3.07 gts situated at Chinnakodur Mandal Gangapuram village for Excavation of RD4-RM1 Sub minor canals under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3322/2021,Dated:11.05.2021.
- Land Acquisition of Ac.37.00½ gts situated at Chinnakoduir,Vittalapur,Peddakodur,Ibrahimnagar & Chowdaram Villages of Chinnakodur Mandal for Excavation of RD3-RM2-RSM2-RSM5-LSM2-LSM1-RSM7-LSM6 Sub minor canals under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3267/2021,Dated:9.05.2021.
- Land Acquisition of Ac.24.08 Gts situated at Baswapur Village of Koheda mandal for Excavation of LD6 distributor Canal of RMC for Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/877/2020,Dated:5.06.2021.
- Land Acquisition of Ac.3.00 gts situated within the limits of chinnakodur Mandal of chinnakodur (V) for excavation of RD3-RM2- RSM6 sub minor Canal under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3218/2021,Dated:5.06.2021.
- Land Acquisition of Ac.15.25 gts situated within the limits of Allipur Village of chinnakodur Mandal for excavation of RD3-RM2-LSM2 sub minor Canal under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3217/2021,Dated:5.06.2021.
- Land Acquisition of Ac.272.02½ gts situated within the limits of Gouravelly,Janagoan,Regonda,Gandipally and Nandaram Villages of Akkannapaet Mandal for construction of Gouravelli Reservoir.File.No:G3/1062/2017,Dated:1.06.2021.
- Land Acquisition of Ac.24.29½ gts situated at Chinnakodur Mandal for Excavation of RD3-RM2-LSM11,LSM14, LSM10, RSM1,RSM3, RSM6, RM1-LSM1 Sub minor canals under LMC of Sri Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/3139/2021,Dated:29.05.2021.
- Land Acquisition of Ac.26.23 gts situated within the limits of Koheda (M) baswapur village for Excavation of LD6 Right Canal of sri Ranganayaka Sagar Reservoir under kaleshwaram Project.File.No:G1/877/2021,Dated:27.05.2021.
- Land Acquisition of Ac.27.17½ gts situated at Chinnakodur Mandal (Machapur,Ramancha,Ibrahimnagar,Medipally,Chinnakodur,Chowdaram villages)for Excavation of RD4-LM1,RD5-LM1,LM2,RD3-RM2-LSM1-LSM2,LSM3,LSM4,LSM8 sub minor Canals under LMC of Ranganayaka sagar Reservoir under Kaleshwaram Project.File.No:G1/3106/2021,Dated:26.05.2021.
- Land Acquisition of Ac.22.37 Gts situated at Baswapur Village of Koheda mandal for Excavation of LD6 distributor Canal of RMC for Ranganayakasagar Reservoir under Kaleshwaram Project.File.No:G1/877/2020,Dated:13.05.2021.
- Land Acquisition of Ac.36.12 gts situated at Bandathimmapur(V) of Mulugu Mandal for excavation of Sangareddy Main Canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No:G2/1139/2020,Dated:7.05.2021.
- Land Acquisition of Ac.5.28,22.24½&20.24 gts situated within the limits of Jangapalli,Khazipur & Bhoompally Village of Siddipet (U) Mandal for construction of 1-R distributory Canal of Sri Komuravelli Mallannasagar Reservoir under kaleshwaram project.File.No:G1/3082/2020,Dated:06.05.2021.
- Land Acquisition of Ac.0.20 gts situated at Mulugu (v) & (M) for improvements to mulugu to Karakapatla road from km 0/0 to 13/0. file.No G2/1717/2021,Dated:30.04.2021.
- Land Acquisition of Ac.0.35 gts situated at Pamulaparthy (V) & Markook (M) for construction of Distributory-2R Gajwel canal of Kondapochamma sagar Reservoir under Kaleshwaram sagar Reservoir under Kaleshwaram Project.File.No:G2/1817/2021,Dated:30.04.2021.
- Land Acquisition of Ac.4.03½ gts situated at Darmarakunta (V) and Ac.1.20 gts at Karakapatla (V) of Markook (M) for excavation of Turkapally canal.File.No.G2/756/2018,Dated:30.04.2021.
- Land Acquisition of Ac.5.07 gts situated within the limits of Dharmareddipally, Jaligama (V) for formation of Gajwel Outer Ring Road.File.No:G2/335/2017,Dated:30.4.2021.
- Land Acquisition of Ac.3.12 gts situated at Zapthisingaipally (V) of Mulugu(M) for Excavation of Turkapally distributory canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.no:G2/772/2020,Dated:30.4.2021.
- Land Acquisition of Ac.2.10 gts Situated at Kukunoorpally(V) of Kondapak (M) for construction of ROB at KM 73/770 near Kukunoorpally (V) to Manoharabad -Kothapally.File.No:G2/2549/2019,Dated:30.04.2021.
- Land Acquisition of Ac.8.14½ gts situated within the Limits of Singannaguda(V) of Mulugu(M) for formation of Sangareddy Main canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.no:G2/1971/2019,Dated:30.4.2021.
- Land Acquisition of Ac.18.39 gts situated within the Limits of Kokkonda(V) of Mulugu (M) for formation of Sangareddy Distributory canal (D-11R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.no:G2/2116/2020,Dated:30.4.2021.
- Land Acquisition of Ac.41.06½ gts situated at Sirsanagandla Village of Kondapak Mandal for Excavation of Tapaspally Tank left Main Canal Distributaries under J.Chokka Rao Devadula Lift Irrigation Scheme.File.No:G2/1093/2019,Dated:30.04.2021.
- Land Acquisition of Ac.45.37 gts situated within the limits of kondapak Village & Mandal for Excavation of Tapaspally Tank under Devadula Lift Irrigation Project.File.No:G2/1095/2019,Dated:30.04.2021.
- Land Acquisition of Ac.55.08 gts situated within the limits of Marpadaga Village of Kondapak Mandal for formation of Distributory on left Main Canal of Tapaspally Tank under Devadula Lift Irrigation project.File.No:G2/1092/2019,Dated:30.04.2021.
- Land Acquisition of Ac.87.18 gts situated at Kothur (V) of Mulugu (M) for excavation Sangareddy main canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.G2/1430/2019,Dated:22.04.2021.
- Land Acquisition of Ac.18.28½ gts situated within the limits of Velikatta (V) of Kondapak (M) for famation of Distributory on Left Main canal of Tapaspally Tank under Devadula Lift Irrigation Project phase II.File.No.G2/1097/2019,Dated:22.04.2021.
- Land Acquisition of Ac.40.26 gts situated Gajwel Village and Mandal for construction of Rehabilitation & Resettlement colony for the project displaced families of Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/1125/2019,Dated:15.03.2021.
- Land Acquisition of Ac.63.29½ gts situated within the limits of Bejjanki (V) & (M) for Excavation of Sub minors MDC7-5R,MDC7-6L,(MDC7-3R),(MDC7-2R),(MDC7-6R),(MDC7-4R),(MDC7-8L),(MDC7-8R),MDC7-3L,MDC7-9L,MDC7-7R,MDC7-4L,MDC7-1R of Annapoorna (Anthagiri) Reservoir under Kaleshwaram Project.File.No.G1/1350/2020,Dated:04.03.2021.
- Land Acquisition of Ac.4.04 gts situated at Banglavenkatapur (V) of Gajwel (M) for excavation Kistapur Distributory canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.Lr.No.G2/1273/2020,Dated:04.03.2021.
- Land Acquisition of Ac.16.05 gts situated at chinnathimmapur village of mulugu mandal for construction of sangareddy main canal under kaleshwaram project.G2/1790/2019,Dated:27.02.2021.
- Land Acquisition of Ac.6.26 gts situated within the limits of Sangapur (V) of Gajwel (M) for Construction of 2BHK houses to the displaced families under Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/250/2019,Dated:01.02.2021.
- Land Acquisition of Ac.102.13½ gts situated at Mutrajpalli (V) of Gajwel (M) for construction of Rehabilitation & Resettlement colony for the project displaced families of sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.File.No.G1/521/2018,Dated:30.01.2021.
- Land Acquisition of Ac.1.18 gts situated at Achaiapally (V) of Mulugu (M) for excavation of sangareddy distributory canal (D-9R) of Kondapochamma Sagar Reservoir under Kaleshwaram.File.No.G2/1711/2020,Dated:29.01.2021
- Land Acquisition of Ac.1416.71 sq.yards and (16) structures situated Laddabanda H/o Dacharam (V) of Bejjanki (M) for improvements to the existing Thotapally Tank by making online reservoir.File.No.G3/1517/2017,Dated:28.01.2021
- Land Acquisition of Ac.11.32½ gts situated within the of Mulugu mandal of Tunikibollaram (V) for excavation of Sangareddy Distributory (D-7R,D-8R) canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/2116/2020,Dated:21.01.2021.
- Land Acquisition of Ac.10.12 gts situated within the limits of Jaligama(V) of Gajwel Mandal for Construction of Gravity Canal & Tunnel Audit-5 system under Kaleshwaram Project.File.No.G1/2851/2020,Dated:15.01.2021.
- Land Acquisition of Ac.25.12 gts situated at Peddakodur (V) of Chinnakodur (M) for formation of New BG Railway lane from Manoharabad to Kothapally.File.No.G3/1523/2016,Dated:12.01.2021.
- Land Acquisition of Ac.0.38½ gts situated at Markook (V) & (M) for construction of M-3R on D-5L on Jagadevpur Canal under Kondapochamma sagar Reservoir.File.No.G2/463/2020,Dated:12.01.2021.
- Land Acquisition of Ac.9.14 gts situated within the limits of pregnapur Village of Gajwel Mandal for formation of Gajwel Distributary Canal (D-2R,D-4R) of Kondapochamma Reservoir under Kaleshwaram Project.File.No.G2/2301/2019,Dated:05.01.2021
- Land Acquisition of Ac.3.36 gts situated within the limits of Ananthagiripally (V) Wargal Mandal for formation of Sangareddy Distributory Canal (D-11R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1710/2020,Dated:05.01.2021.
- Land Acquisition of Ac.37.06½ gts situated within the limits of Thunikibollaram Village of Mulugu Mandal for establishment of industrial Park by TSIIC.File.No.E2/1848/2019,Dated:30.12.2020.
- Land Acquisition of Ac.5.29½ gts situated within the limits of Bejjanki Mandal- Muthannapet Village for Excavation of Sub minors (MDC7-2R) of Annapoorna(Anthagiri) Reservoir under Kaleshwaram Project.File.No.G1/1351/2020,Dated:28.12.2020.
- Land Acquisition of Ac.0.33 gts situated within the limits of Gouraram (V) of Wargal (M) for Formation of Sangareddy Distributary canal (D-1R) of Kondapochamma reservoir under Kaleshwaram project.File.No.G2/1710/2020,Dated:22.12.2020.
- Land Acquisition of Ac.48.17½ gts situated within the limits of Dholmitta,Gagillapur,Kamalaipally,Lingapur,Narsaipally and Arjunapatla villages of Maddur Mandal for formation of Distributary Canals of Tappaspally Left Maon canal under Sri J.Chokka Rao,Devadula Lift Irrigation Scheme Project.File.No.G2/1310/2020,Dated:22.12.2020.
- Land Acquisition of Ac.33.24 gts situated within the limits of Tuniki Bollaram (V) Mulugu Mandal for formation of Sangareddy Main Canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/2185/2020,Dated:22.12.2020.
- Land Acquisition of Ac.5.32½ gts situated within the limits of Narsapur (V) Mulugu Mandal for formation of Sangareddy Distributary Canal (D=9R,D-11R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1711/2020,Dated:22.12.2020.
- Land Acquisition of Ac.18.15½ gts situated within the limits of Tunikikalsa (V) Wargal Mandal for formation of Sangareddy Distributary Canal (D-11R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1654/2020,Dated:22.12.2020.
- Land Acquisition of Ac.4.14 gts situated within the limits of Ramchandrapur (V) Wargal Mandal for formation of Sangareddy Distributary Canal (D-11R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1654/2020,Dated:22.12.2020.
- Land Acquisition of Ac.0.36½ gts situated within the limits of Mulugu(V) Mulugu Mandal for formation of Sangareddy Distributary Canal (D-5R,D-6R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1653/2020,Dated:22.12.2020.
- Land Acquisition of Ac.4.37 gts situated within the limits of Bandathimmapur(V) Mulugu Mandal for formation of Sangareddy Distributary Canal (D-11R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1712/2020,Dated:22.12.2020.
- Land Acquisition of Ac.0.14½ gts situated within the limits of Tuniki Maktha(V) Wargal Mandal for formation of Sangareddy Distributary Canal (D-11R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1654/2020,Dated:22.12.2020.
- Land Acquisition of Ac.6.32 gts situated within the limits of Wargal (V) Wargal Mandal for formation of Sangareddy Distributary Canal (D-3R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1710/2020,Dated:22.12.2020.
- Land Acquisition of Ac.12.30½ gts situated within the limits of Veluru(V) Wargal Mandal for formation of Sangareddy Distributary Canal (D-11R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1710/2020,Dated:22.12.2020.
- Land Acquisition of Ac.10.32 gts situated within the limits of Meenajipet(V) Wargal Mandal for formation of Sangareddy Distributary Canal (D-11R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1710/2020,Dated:22.12.2020.
- Land Acquisition of Ac.0.33 gts situated within the limits of Wargal (M) Gouraram (V) for Excavation of Sangareddy main canal of Kondapochamma reservoir under Kaleshwaram project.File.No.G2/1710/2020,Dated:22.12.2020.
- Land Acquisition of Ac.13.02½ gts situated within the limits of Wargal Village and Mandal for formation of Sangareddy Distributary Canal (D-4R) of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1710/2020,Dated:22.12.2020.
- Land Acquisition of Ac.4.11 gts situated within the limits of Danampally Village of Cherial Mandal for Excavation of LD9,LM1&RM1 distributary of Right main canal of Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/3080/2020,Dated:21.12.2020.
- Land Acquisition of Ac.7.23 gts situated within the limits of Gouraram (V) of Wargal (M) for Excavation of Sangareddy main canal of Kondapochamma reservoir under Kaleshwaram project.File.No.G2/2595/2018,Dated:15.12.2020.
- Land Acquisition of Ac.33.30 gts situated within the limits of Bejjanki Mandal – Kallepally (V) for Excavation of Sub minors (MDC7-5L),(MDC5-3R),(MDC4-4R),(MDC5-3R),(MDC7-4L),(MDC4-3R),(MDC4-2L),(MDC7-7L) of Annapoorna (Anthagiri) Reservoir under Kaleshwaram Project.File.No.G1/1341/2020,Dated:15.12.2020.
- Land Acquisition of Ac.2.03 ¾ gts situated within the limits of Kukunoorpally Village of Kondapak Mandal for construction of approaches of Rob at Km 73/770 near Kukunoorpally(V) to Manoharabad-Kothapally new BG Railway Line crossing for formation of appproaches along with service Road.File.No.D4/1537/2020,Dated:15.12.2020.
- Land Acquisition of Ac.50.18½ gts situated within limits of Mulugu Village & Mandal for excavation of Sangareddy Main Canal of Kondapochamma Sagar reservoir under Kaleshwaram Project.File.No.G2/2091/2019,Dated:28.11.2020.
- Land Acquisition of Ac.8.01 gts situated within the limits of duddeda (V) of Kondapak (M) for excavation of 7R of D4 of LMC of Tapaspally Tank under Devadula lift Irrigation Project phase-II.File.No.G2/1095/2019,Dated:27.11.2020.
- Land Acquisition of 3.08 gts situated within the limits of Thimmareddypally (V) of Kondapak (M) for excavation of 1R of D4 LMC of Tapaspally Tank under J.Chokka Rao Devadula Lift Irrigation Project phase-II.File.No.G2/1097/2019,Dated:27.11.2020.
- Land Acquisition of Ac.14.02½ gts situated at Vishwanathpally (V) of Kondapak (M) for excavation of 2LA of D3 of LMC of Tapaspally Tank. File.No.G2/1096/2019,Dated:27.11.2020.
- Land Acquisition of Ac.4.25 gts situated at Zapthinacharam (V) of Kondapak (M) for excavation of 4R of D4 of LMC of Tapaspally Tank.File.No.G2/1094/2019,Dated:27.11.2020.
- Land Acquisition of Ac.18.08 gts situated at Kokkonda (V), Ac.2.09 gts situated at Sigannaguda (V), Ac.0.19 Gts situated at Achaipally (V) & Ac.7.07 gts situated at Srirampur (V) of Mulugu Mandal totaling to an extent of Ac.28.03 gts for Excavation of Sangareddy Canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/2343/2020,Dated:24.11.2020.
- Land Acquisition of Ac.2.34 gts situated within the limits of Laxmakkapally (V) of Mulugu (M) for Excavation of 6-R on Sangareddy Distributory canal of Kondapochamma sagar Reservoir under Kaleshwaram Project.File.No.G2/1653/2020,Dated:23.11.2020.
- Land Acquisition of Ac.1.18 gts situated within the limits of Srirampur (V) of Mulugu (M) for Excavation of D-9R on Sangareddy Distributory canal of Kondapochamma sagar Reservoir under Kaleshwaram Project.File.No.G2/1711/2020,Dated:23.11.2020.
- Land Acquisition of Ac.10.12 gts situated within the limits of Achaipally (V) of Mulugu (M) for Excavation of Sangareddy Main canal of Kondapochamma sagar Reservoir under Kaleshwaram project.File.No.G2/1849/2019,Dated:23.11.2020.
- Land Acquisition of Ac.8.07½ gts situated within the limits of Wargal (V) & (M) for excavation of Ramayampet Distributory Canal of Kondapochamma sagar Reservoir under Kaleshwaram Project.File.No.G2/2184/2019,Dated:23.11.2020.
- Land Acquisition of Ac.13.06 gts situated within the limits of Veerapur (V) of Bejjanki (M) for Excavation of Sub minors(MDC7-7R,MDC7-6R) of Annapoorna (Ananthagiri) Reservoir under Kaleshwaram Project.File.No.G1/1339/2020,Dated:19.11.2020.
- Land Acquisition of Ac.7.11 gts situated within the limits of Gundaram (V) of Bejjanki (M) for Excavation of Sub minors (MDC7-2L,MDC7-3L,MDC7-1L) of Annapoorna (Ananthagiri) Reservoir under Kaleshwaram Project.File.No.G1/1340/2020,Dated:19.11.2020.
- Land Acquisition of Ac.56.12 gts situated within the limits of Ramancha (V) of Chinnakodur (M) for construction of Excavation parallel conveyor system from Ananthagiri Reservoir under Kaleshwaram Project.File.No.G1/1385/2019,Dated:19.11.2020.
- Land Acquisition of Ac.0.30 gts situated within the limits of Thotapally (V) of Bejjanki (M) for Excavation of Sub minors(MDC7-8R) of Annapoorna (Ananthagiri) Reservoir under kaleshwaram Project.File.No.G1/1232/2020,Dated:19.11.2020.
- Land Acquisition of Ac.10.10 gts situated within the limits of Vadlur Begumpet (V) of Bejjanki (M) for Excavation of package-10, sub minors (MDC7-9L,MDC7-8L,MDC4-5R) of Sri Annapoorna (Sri Ananhagiri) reservoir under Kaleshwaram project.File.No.G1/1233/2020,Dated:19.11.2020.
- Land Acquisition of Ac.3.29 gts situated within the limits of veerapur (V) of Bejjanki (M) for excavation of sub minors(MDC7-7R,MDC7-8R) of Annapoorna (Ananthagiri) Reservoir under Kaleshwaram Project.File.No.G1/1231/2020,Dated:19.11.2020.
- Land Acquisition of Ac.3.14 gts situated within the limits of Velkatur (V) of Siddipet (Urban) Mandal for construction of LD-4 Distributor of Right Main canal of Sri Ranganayaka Sagar under Kaleshwaram Project.File.No.G1/2744/2020,Dated:19.11.2020.
- Land Acquisition of Ac.26.21 gts situated within the limits of Vittalapur (V) of Chinnakodur (M) for construction of Excavation parallel conveyor system from Ananthagiri Reservoir under Kaleshwaram Project.File.No.G1/2481/2019,Dated:19.11.2020.
- Land Acquisition of Ac.15.03 gts situated within the limits of Yellaipalli (V) of Chinnakodur (M) for construction of Excavation parallel conveyor system from Ananthagiri Reservoir under Kaleshwaram Project.File.No.G1/1352/2019,Dated:19.11.2020.
- Land Acquisition of Ac.60.01 gts situated within the limits of Yellaipally H/o. Allipur Village of Chinnakodur Mandal for construction of substation and pump House for parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project.File.No.G1/1815/2020,Dated:12.11.2020.
- Land Acquisition of Ac.7.17 gts situated within the limits of Thunikibollaram (V) of Mulugu (M) for construction of R&R colony to the PDFs of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/4626/2017,Dated:14.10.2020.
- Land Acquisition of Ac.1.37½ gts in the limits Janagaon & Ramavaram villages for formation of Diversion Road pertaining to Gouravelli Reservoir.Proc.No.G3/935/2019,Dated:14.10.2020.
- Land Acquisition of Ac.4.18 gts situated within the limits of Obulapur Village of Chinnakodur Mandal for Excavation of LD4-RM3 minor of RMC of Ranganayakasagar Reservoir under Kaleshwaram project.File.No.G1/1290/2020,Dated:13.10.2020.
- Land Acquisition of Ac.5.20 gts situated within the limits of Obulapur Village of Chinnakodur Mandal for Excavation of LD4-LM5 minor of RMC of Ranganayakasagar Reservoir under Kaleshwaram project.File.No.G1/1290/2020,Dated:13.10.2020.
- Land Acquisition of Ac.30.34 gts situated within the limits of Thadkapally (V) of Siddipet (U) Mandal for Excavation of 1-R Distributor of Right main canal of Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project.Lr.No.G1/1649/2019,Dated:13.10.2020.
- Land Acquisition of Ac.13.28 gts, Ac.5.18 gts, and Ac.42.33 gts totaling to Ac.61.39 gts. situated Devakkapally, Vadloor-Begumpet and Thotapally villages of Bejjanki Mandal for Distributaries,Minors & Sub-minors of DC&CM of Mid Maner Right Main canal.File.No.G3/2007/2020,Dated:05.10.2020.
- Land Aquisition of Ac.0.21 gts situated within the limits of Wargal Village & Mandal for Stabilization of Nizamsagar Project by feeding the Reservoir through Haldi River from Sangareddy Canal under Klaeshwaram project.File.No.Lr.No.G2/3055/2019,Dated:05.10.2020.
- Land Aquisition of Ac.6.27½ gts on D-3L & D-5L situated within the limits of Wargal mandal-Mylaram Village for excavation of Ramayampet Distributory Canal of Kondapochamma Sagar Reservoir under Kaleshwaram project. File.No.Lr.No.G2/1969/2019,Dated:05.10.2020.
- Land Acquisition of Ac.37.31gts situated within the limits of Thadkapally Village of Siddipet(U) Mandal for Construction of Parallel cannel from Ananthagiri reservoir to Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project.File.No.Lr.No.G1/1358/2019,Dated:03.10.2020.
- Land Acquisition of Ac.13.12 gts situated within the limits of Bakrichepyala (V) of Siddipet (U) Mandal for Excavation of 1-R distributor of main canal for Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No.Lr.No.G1/2357/2019,Dated:01.10.2020.
- Land Acquisition of Ac.3.08 gts situated within the limits of Nancharpally (V) of Siddipet (U) Mandal for Excavation of 1-R distributor of main canal for sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project.File.No.Lr.No.G1/2359/2019,Dated:01.10.2020.
- Land Acquisition of Ac.18.38 gts situated within the limits of Kokkonda(V) of Mulugu(M) for excavation of Sangareddy Distributory canal.File.No. Lr.No.G2/2116/2020,Dated:30.09.2020.
- Land Acquisition of Ac.3.17 gts situated within the limits of Nancharpally(V) for Construction of 1-R Distributor of Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/2359/2019,Date:26.09.2020.
- Land Acquisition of Ac.13.13 gts situated in Ganapur (V) of Chinnakodur Mandal for excavation of Parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1249/2019,Dated:23.09.2020.
- Land Acquisition of Ac.26.21 gts situated in Vittalapur (V) of Chinnakodur Mandal for construction of Parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/2481/2019,Dated:23.09.2020.
- Land Acquisition of Ac.7.38gts. & Ac.1.38gts. totaling to 9.36 gts situated at Tipparam and Muddapur Village of Kondapak Mandal for excavation of D-1R on parallel Canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1229/2020,Dated:23.09.2020.
- Land Acquisition of Ac.3.02gts situated at Damarakunta Village of Markook Mandal for Excavation of D-1L on M.Turkapally Canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.No.G2/1670/2019,Dated:23.09.2020.
- Land Acquisition of Ac.56.19 gts situated in Ramancha (V) of Chinnakodur Mandal for construction of Parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1385/2019,Dated:23.09.2020.
- Land Acquisition of Ac.111.13 gts situated in Thadkapally (V) of Siddipet urban(M) Excavation of Gravity canal of Parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1358/2019,Dated:23.09.2020.
- Land Acquisition of Ac.14.23 gts situated in Vittalapur (V) of Chinnakodur Mandal for Excavation of Gravity canal of Parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1247/2019,Dated:20.09.2020.
- Acquisition of (86) Residential Houses situated in Etigaddakistapur, Thirumalagiri & Thanda villages of Thoguta Mandal for construction of sri Komurvelli Mallannasagar Reservoir under Kaleshwaram project. Proc.No.G1/1195/2017,Dated:18.09.2020.
- Acquisition of (75) Houses situated in Vemulaghat & Thurkabanjerupalli villages of Thoguta (M) for construction of Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project. Proc.No.G1/681/2017,Dated:18.09.2020.
- Land Acquisition of Ac.13.33 gts situated within the limits of Wargal Village and Mandal Construction of Nizam Sagar Feeder Channel from Bandam Cheruvu to Pedda Cheruvu under Kaleshwaram Project.File.No.G2/2038/2020,Date:18.09.2020.
- Land Acquisition of Ac.136.28 gts situated within the limits of Chinnagundavelly Village of Siddipet (Rural) Mandal, Siddipet District for excavation of Gravity canal of parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/1250/2019,Dated:17.09.2020.
- Land Acquisition of Ac.9.22 gts situated within the limits of Irkode (V) of siddipet (Rural) Mandal for Excavation of 4-R distributor of sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.File.No.G1/1811/2019,Dated:07.09.2020.
- Land Acquisition of Ac.12.37 gts situated within the limits of Irkode (V) of Siddipet (Rural) Mandal for Excavation of 3-R Distributor of sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project.File.No.G1/2354/2019,Dated:07.09.2020.
- Land Acquisition of Ac.6.27 gts situated within the limits of Lingapur (V) of Thoguta (M) for Excavation of D-10 Distributor canal for Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.File.No.G1/1373/2019,Dated:07.09.2020.
- Land Acquisition of Ac.4.04 gts situated within the limits of Mundrai (V) of Nangnoor (M) for excavation of LD5 Distributor of Ranganayakasagar Reservoir under Kaleshwaram project.File.No.G1/1875/2020,Dated:07.09.2020.
- Land Acquisition of Ac.3.31 gts situated within the limits of Rajgopalpet (V) of Nangnoor (M) for excavation of LD5 Distributor of Ranganayakasagar Reservoir under Kaleshwaram project.File.No.G1/1874/2020,Dated:07.09.2020.
- Land Acquisition of Ac.4.02 gts situated within the limits of Rajgopalpet (V) of Nangnoor (M) for excavation of LD4-Rm3-Minor of Ranganayakasagar Reservoir under Kaleshwaram project.File.No.G1/1876/2020,Dated:07.09.2020.
- Land Acquisition of Ac.10.32 gts for D-11R in the limits of Minajipet (V) & Ac.6.32 gts for D-3R in the limits of Wargal (V) of Wargal (M) totaling to an extent of Ac. 17.24 gts for excavation of Sangareddy Distributory canal of Kondapochamma Sagar Reservoir under Kaleshwaram Project.File.no.G2/1710/2020,dated:05.09.2020.
- Land Acquisition of Ac.18.04 gts situated at Venkatraopet (V) of Thoguta (M) for excavation of Package-13, D-9, Distributory canal of sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project.File.No.G1/1816/2020,Dated:02.09.2020.
- Land Acquisition of Ac.60.01 gts situated in within limits of Yellaipally H/o Allipur (V) of Chinnakodur (M) for excavation of pressure mains of parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallanna Sagar for Sub station and Pump House.File.No.G1/1815/2020,Dated:02.09.2020.
- Land Acquisition of Ac.169.23¾ gts situated in Bandarupally (V) of Thoguta (M) for excavation of Gravity canal of parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1353/2019,Dated:01.09.2020.
- Land Acquisition of Ac.7.26 gts situated in Ensanpally (V) of Siddipet Urban (M) for excavation of Gravity canal of parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1356/2019,Dated:01.09.2020.
- Land Acquisition of Ac.33.36 gts situated in Burugupally (V) of Siddipet (Urban) Mandal for excavation of Gravity canal of Parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1357/2017,Dated:01.09.2020.
- Land Acquisition of Ac.13.31¼ gts situated within the limits of Mittapally (V) of Siddipet (U) Mandal for formation of new BG Railway between Manoharabad and Kothapalli villages.File.No.G3/1523/2016,Dated:31.08.2020.
- Land Acquisition of Ac. 9.00 gts situated within the limits of mittapally village of siddipet (U) Mandal for Excavation of LD-4 distributor of Ranganayakasagar Reservoir under Kaleshwaram project. File.No.G1/787/2020,Date:28.08.2020.
- Land Acquisition of Ac. 25.19 gts situated within the of limits of Ponnala Village of Siddipet (U) Mandal for Excavation of 1-R distributor of main canal of Sri Komuravelli Mallannasagar Resevoir under Kaleshwaram project. File.No.G1/2309/2019.Date:28.08.2020.
- Land Acquisition of Ac. 7.27 gts situated within the limits of Chandapur Village of Thoguta Mandal for Excavation of D-8 Distributor canal for Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project. File.No.G1/1347/2019, Date:28.08.2020.
- Land Acquisition of Ac.12.01 gts situated within the limits of Chinnakodur (V) & (M) for formation of new BG Railway between Manoharabad and Kothapalli villages. File.No.G3/1523/2016,Dated:26.08.2020.
- Land Acquisition of Ac.74.38 gts situated in Ghanapur (V) of Thoguta Mandal for excavation of Gravity canal of Parallel conveyor system from Ananthagiri Reservoir to Sri Komurvelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1647/2019,Dated:25.08.2020.
- Land Acquisition of Ac.50.01 gts situated in Irkode (V) of Siddipet Rural Mandal for excavation of Gravity canal of Parallel conveyor system from Ananthagiri Reservoir to Sri Komurvelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1495/2019,Dated:25.08.2020.
- Land Acquisition of Ac.11.07 gts situated within the limits of Banglavenkatapur (V) of Gajwel (M) for formation of dumping yard under Kaleshwaram project.File.No.G1/3770/2017,Dated:24.08.2020.
- Land Acquisition of Ac.8.08 gts situated at Chepyala(V) of Mirdoddi(M) for excavation of D-11 Distributor of Right main canal for sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project.File.No.G1/1895/2019,Dated:24.08.2020.
- Land Acquisition of Ac.40.19½ gts situated at Dubbak village of Dubbak (M) for Excavation of 4-L Distributor main canal for sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.File.No.G1/1899/2019,Dated:24.08.2020.
- Land Acquisition of Ac.11.37 gts situated within the limits of Lingapur (V) of Thoguta (M) for Excavation of D-11 Distributor canal for Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project.File.No.G1/1894/2019,Dated:24.08.2020.
- Land Acquisition of Ac.276.31½ gts situated in Yellareddypet (V) of Thoguta Mandal for excavation of Gravity canal of Parallel conveyor system from Ananthagiri Reservoir to Sri Komurvelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1355/2019,Dated:20.08.2020.
- Land Acquisition of Ac.8.28½ gts situated at Achaipally, Srirampur & Narsapur villages of Mulugu (M) for excavation of D-9R & D-11R on Sangareddy Distributory canal of Kondapochamma sagar under Kaleshwaram project.File.No.G2/1711/2020,Dated:20.08.2020.
- Land Acquisition of Ac.38.21 gts situated in Venkatapur (V) of Siddipet (Rural) Mandal for excavation of Gravity canal of Parallel conveyor system from Ananthagiri Reservoir to Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1494/2019,Dated:20.08.2020.
- Land Acquisition of Ac.49.21 gts situated in Thukkapur (V) of Thoguta Mandal for excavation of Gravity canal of Parallel conveyor system from Ananthagiri Reservoir to Sri Komurvelli Mallannasagar Reservoir under Kaleshwaram Project.Proc.No.G1/1251/2019,Dated:19.08.2020.
- Land Acquisition of Ac.30.22 gts situated at Wargal,Gouraram,Ananthagiripally, Veluru villages of Wargal (M) for excavation of Sangareddy Distributory canal of Kondapochamma sagar Reservoir under Kaleshwaram project.File.No.G2/1710/2020,Dated:19.08.2020.
- Land Acquisition of Ac.1.03½ gts(D-10R), Ac.4.37 gts(D-11R) situated at Singannaguda,Bandathimmapur villages of mulugu mandal totaling to an extent of Ac.6.00½ gts for excavation of Sangareddy Distributory canal of Kondapochamma sagar Reservoir under Kaleshwaram project.File.No.G2/1712/2020,Dated:19.08.2020.
- Land Acquisition of Ac.8.07 gts situated at Kamalaipally (V) of Maddur (M) for Excavation of LD-10 right side canal for sri Ranganayakasagar Reservoir under Kaleshwaram project.File.No.G1/782/2020,Dated:19.08.2020.
- Land Acquisition of Ac.3.30½ gts situated at Laxmakkapally & Mulugu Villages for excavation of D-6R & D-5R, D-6R on Sangareddy Distributory Canal of Kondapochamma Sagar Reservoir under Kaleshwaram project File.No.G2/1653/2020,Dated:18.08.2020.
- Land Acquisition of Ac.23.04 gts situated at Thunikikalsa, Thuniki Maqtha & Ramchandrapur villages of Wargal (M) for excavation of D-11R on Sangareddy Distributory canal of Kondapochamma sagar Reservoir File.No.G2/1654/2020,Dated:18.08.2020.
- Land Acquisition of Ac.3.37¼ gts situated at Mittapalli (V) of Siddipet (U) Mandal for construction of new BG Railway line between Manoharabad & Kothapalli villages File.No.G3/1523/2016,Dated:10.08.2020.
- Land Acquisition of Ac.3.3350 gts situated at Adavimajeed (V) of Mulugu (M) for excavation of (D-8L) on Thurkapally Distributory canal under kondapochamma sagar Reservoir. Lr.No.G2/772/2020,Dated:10.08.2020.
- Land Acquisition of Ac.8.13 gts situated at Gangadarpally (V) of Mulugu (M) for excavation of (D-13TE) on Thurkapally Distributory canal under Kondapochamma sagar Reservoir under Klaeshwaram project.File.No.G2/813/2020,Dated:07.08.2020.
- Land Acquisition of Ac.8.17 gts situated at Kotyal (V) of Mulugu (M) for excavation of (D-6L & D-7L) on Thurkapally Distributory canal under Kondapochamma Sagar Reservoir under Kaleshwaram project.File.No.G2/773/2020,Dated:07.08.2020.
- Land Acquisition of Ac.10.14 gts situated at Pamulaparthy (V) of Markook (M) for excavation of D-1R on Gajwel canal of Kondapochamma sagar Reservoir under Kaleshwaram project File.No.G2/2635/2019,Dated:04.08.2020.
- Land Acquisition of Ac.23.11 gts situated at Ramancha (V) of chinnakodur (M) for Excavation of 3-R Distributor Main canal for Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project.File.No.G1/2482/2019,Dated:31.07.2020.
- Land Acquisition of Ac.29.11 gts situated at Danampally (V) of Cheriyal (M) for Excavation of LD-10 Distributor of Ranganayakasagar Reservoir under Kaleshwaram project.File.No.G1/778/2020,Dated:31.07.2020.
- Land Acquisition of Ac.2.02 gts situated at Komuravelli (V)& (M) for formation of new BG Railway line between Manoharabad and Kothapalli Villages.File.No.G3/1523/2016, Dated:25.07.2020.
- Land Acquisition of Ac.11.30 gts situated within the limits of Appanapally (V) of Dubbak (M) for Excavation of 5R Distributor main canal for Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project.File.No.G1/2180/2019, Dated:22.07.2020.
- Land Acquisition of Ac.57.31½ gts situated with in the limits of Thimmapur (V) of Dubbak (M) for excavation of 2-L Distributor main canal for sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project.File.No.G1/2181/2019,Dated:22.07.2020.
- Land Acquisition of Ac.0.37 gts situated within the limits of Thoguta (V) & (M) for Excavation of 1-L Distributor for Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram project.File.No.G1/2303/2019,Dated:22.07.2020.
- Land Acquisition of Ac.18.02 gts situated within the limits of Yellareddypet (V) of Thoguta (M) for Excavation of 1-L Distributor canal for Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project.File.No.G1/2310/2019,Dated:22.07.2020.
- Land Acquisition of Ac.6.38 gts, Ac.25.05¼ gts, Ac.10.21¾ gts, Ac.1.20 gts, Ac.0.23 gts, Ac.2.19½ gts, Ac.9.11½ gts, Ac.1.27½ gts, Ac.4.38 gts totaling to an extent of Ac.63.04½ gts situated at Akunur, Cherial, kadavergu, Chunchanakota, Danampally, chityala, mustiyala, thadur, Nagapuri Villages of cherial (M) for excavation of Tapaspally canal File.No.G2/1988/2018, Dated:21.07.2020.
- Land Acquisition of Ac.42.14 gts, Ac.6.00 gts, Ac.1.00 gts totaling to an extent of 49.14 gts situated at Akunur, Nagapuri, chityala villages of cherial (M) for excavation of Tapaspally canal File.No.G2/2207/2018, Dated:21.07.2020.
- Land Acquisition of Ac.7.23 gts situated at gouraram village of Wargal (M) for construction of Sangareddy main canal under Kaleshwaram project File.No.G2/2595/2018, Dated:21.07.2020.
- Land Acquisition of Ac.0.19 gts, Ac.4.28 gts situated at Gourayapally and komuravelli villages of Komuravelli (M) for Construction of BG Railway line Between Manoharabad and Kothapally.Lr.No:G3/1523/2016.Dated:18.07.2020.
- Land Acquisition of Ac.14.35 gts, Ac.8.05 gts situated at Govindapur, upparipally villages of Doulthabad (M) for excavation of Mallanna sagar Reservoir Distributory canal package-13 under Kaleshwaram project File.No.G2/386/2020, Dated:15.07.2020.
- Land Acquisition of Ac.2.38 gts situated within the limits of Venkatraopet (V) of Thoguta (M) for construction of Right main canal Distributory of Kaleshwaram Project.File.No.G1/1349/2019,Dated:08.07.2019..
- Land Acquisition of Ac.71.16½ gts situated within the limits of Bejjanki Village of Bejjanki (M) for excavation of Sub minors, MDC7-5R, MDC7-6L, MDC7-5L, MDC7-3R, MDC7-2R, MDC7-6R, MDC7-4R, MDC7-8L, MDC7-8R, MDC7-3L, MDC7-9L, MDC7-7R, MDC7-4L,MDC7-1R of Annapoorna (Ananthagiri) Reservoir under Kaleshwaram project File.No.G1/1350/2020,Dated:07.07.2020.
- Land Acquisition of Ac.7.11 gts situated within the limits of Gundaram (V) of Bejjanki (M) for excavation of sub minors (MDC7-2L, MDC7-3L, MDC7-1L) of Annapoorna (Ananthagiri) Reservoir under Kaleshwaram project.File.No.G1/1340/2020, Dated:07.07.2020.
- Land Acquisition of Ac.14.05½ gts situated within the limits of Machapur (V) of Chinnakodur (M) for excavation of R3-RM2 Minor canal for sri Ranganayaka sagar Reservoir under Kaleshwaram project File.No.G1/88/2020, Dated:07.07.2020.
- Land Acquisition of Ac.5.22 gts situated within the limits of Muthannapet (V) of Bejjanki (M) for excavation of sub minors (MDC7-2R) of Annapoorna (Ananthagiri) Reservoir under Kaleshwaram project. File.No.G1/1351/2020, Dated:07.07.2020
- Land Acquisition of Ac.9.33 gts situated within the limits of Vadlur Begampet (V) of Bejjanki (M) for excavation of sub minors (MDC7-9L),(MDC7-8L),(MDC4-5R) of Annapoorna (Ananthgiri) Reservoir under Kaleshwaram project.File.No.G1/1233/2020,Dated:07.07.2020.
- Land Acquisition of Ac.7.32 gts situated at Chandapur (V) of Thoguta (M) for excavation of D-8 Distributor canal of Sri Komuravelli Mallannasagar under Kaleshwaram project.Proc.No.G1/1347/2019,Dated:04.07.2020.3
- Land Acquisition of Ac.6.13 gts situated within the limits of Appanapally (V) of Dubbak (M) for Excavation of 5R/A Distributor main canal for sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project file.No.G1/2361/2019,Dated:04.07.2020.
- Land Acquisition of Ac.2.28½ gts situated within the limits of chinnakodur (V) & (M) for Excavation of RM2 Minor canal for Sri Ranganayaka sagar Reservoir under Kaleshwaram project.File.No.G1/786/2020, Dated:04.07.2020.
- Land Acquisition of Ac.12.33½ gts situated within the limits of Dacharam (V) of Bajjanki (M) for excavation of Sub minors (MDC7-7R),(MDC7-6R) of Annapoorna (Ananthagiri) Reservoir under Kaleshwaram project File.No.G1/1339/2020, Dated:04.07.2020.
- Land Acquisition of Ac.7.03 gts situated within the limits of Japthilingareddypally (V) of Thoguta (M) for excavation of Distributor D11 of RMC canal for Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project File.No.G1/1893/2019, Dated:04.07.2020.
- Land Acquisition of Ac.32.32½ gts situated within the limits of Kallepally (V) of Bejjanki (M) for excavation of sub minors (MDC7-5L),(MDC5-3R),(MDC4-4R),(MDC4-2R),(MDC5-3R),(MDC7-4L),(MDC4-3R),(MDC4-2L),(MDC7-7L) of Annapoorna (Ananthagiri) Reservoir under Kaleshwaram project File.No.G1/1341/2020,Dated:04.07.2020.
- Land Acquisition of Ac.0.06 gts situated within the limits of Lingapur (V) of Thoguta (M) for excavation of D-9 Distributor canal for sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project. File.No.G1/1373/2019,Dated:04.07.2020.
- Land Acquisition of Ac.5.39 gts situated withinn the limits of Nangnoor (V) & (M) for excavtion of RMC of Ranganayaka sagar Reservoir under Kaleshwaram project File.No.G1/620/2019,Dated:04.07.2020.
- Land Acquisition of Ac.0.33 gts situated withinn the limits of Rampur (V) of Nangnoor (M) for excavtion of (LD6-LM4,LD6-LM1 & LD6-LM2) minors of Right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project File.No.G1/624/2019,Dated:04.07.2020.
- Land Acquisition of Ac.2.21 gts situated withinn the limits of Rampur (V) of Nangnoor (M) for excavtion of (LD6-LM4,LD6-LM1 & LD6-LM2) minors of Right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project File.No.G1/624/2019,Dated:04.07.2020.
- Land Acquisition of Ac.5.02 gts situated withinn the limits of Rampur (V) of Nangnoor (M) for excavtion of (LD6-LM4,LD6-LM1 & LD6-LM2) minors of Right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project File.No.G1/624/2019,Dated:04.07.2020.
- Land Acquisition of Ac.8.19 gts situated withinn the limits of Rampur (V) of Nangnoor (M) for excavtion of (LD6-LM4,LD6-LM1 & LD6-LM2) minors of Right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project File.No.G1/624/2019,Dated:04.07.2020.
- Land Acquisition of Ac.7.24½ gts situated within the limits of Yellareddypet (V) of Thoguta (M) for excavation of 1L/A Distributor canal for Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram project.G1/2358/2019,Dated:04.07.2020.
- Land Acquisition of Ac.15.25½ gts, Ac.76.22½ gts situated at Kothur (V) of Mulugu (M) for construction of Sangareddy Main Canal and Raval coal canal File.No.G2/1430/2019, Dated:03.07.2020.
- Land Acquisition of Ac.48.35½ gts situated at with in the limits of Maddur (M) for excavation of JCR-DLIS,Tapaspally Distributory systems, Arjunpatla, kamalayapally, narsayapally, Gagillapur,lingapur, dulmitta village canals File.No.G3/1310/2020, Dated:03.07.2020.
- Land Acquisition of Ac.28.12¼ gts situated at Ainapur, Posanpally, Ramsagar, and Marrimuchala villages of Komuravelli (M) for construction of Right and Left main canals of J.Chokkarao Devadula project. File.No.G2/1624/2018, Dated:29.06.2020.
- Land Acquisition of Ac.39.22 gts situated at Ahmadipur (V) of Gajwel (M) for excavation of Package-13 Distributory canal under Kaleshwaram project. File No.G2/1855/2019, Dated:29.06.2020.
- Land Acquisition of Ac.10.37 gts situated at Arepally (SJ) (V) of Raipole (M) for excavation of D-1R on Ramayampet Distributory canal under Kaleshwaram project.File.No.G2/2443/2019, Dated:29.06.2020.
- Land Acquisition of Ac.1.38 gts, Ac.8.02 gts situated at Muddapur, Thipparam villages of Kondapak (M) for construction of Parallel canal-Distributory D-1R canal under Kaleshwaram project -13. File.No.G2/1229/2020, Dated:29.06.2020.
- Land Acquisition of Ac.11.35 gts situated at Singatam (V) of Gajwel (M) for construction of Distributory canal of package-13 under kaleshwaram project.File.No.G2/1748/2019, Dated:29.06.2020.
- Land Acquisition of Ac.37.09 gts situated within the limits of Bandathimmapur (V) of Mulugu (M) for Excavation of Sangareddy Main canal under Kaleshwaram project File.No.G2/1139/2020, Dated:27.06.2020.
- Land Acquisition of Ac.4.04 gts situated within the limits of Banglavenkatapur (V) of Gajwel (M) for Excavation of Kistapur Distributory canal under Kaleshwaram project File.No.G2/1273/2020,Dated:27.06.2020.
- Land Acquisition of Ac.36.04 gts situated within the limits of Cheelasagar (V) of Mulugu (M) for Excavation of Thurkapalli Distributory canal of Kondapochamma sagar Reservoir under Kaleshwaram project File.No.G2/1641/2019, Dated:27.06.2020.
- Land Acquisition of Ac.16.29 gts situated within the limits of Pidched (V) of Gajwel (M) for excavation of Package-13 Distributory canal under Kaleshwaram project File.No.G2/1772/2019, Dated:27.06.2020.
- Land Acquisition of Ac.1.13½ gts for D-3R, Ac.3.36 gts for D-4R & Ac.9.29½ gts for D-5R totalling to an extent of Ac.14.39 gts situated within the limits of Ramaram (V) of raipole (M) for excavation of Ramayampet Distributory canal of Kondapochamma sagar Reservoir under Kaleshwaram project File.No.G2/1973/2019,Dated:27.06.2020
- Land Acquisition of Ac.9.25½ gts on D-1R, Ac.11.30½ gts on D-2R & Ac.4.16 gts on D-3R situated at Ramsagar (V) of Raipole (M) for excavation of Ramayampet Distributory canal under Kaleshwaram project File.No.G2/1963/2019, Dated:27.06.2020.
- Land Acquisition of Ac.13.25gts situated at Mysampalli(V) of Nanganoor(M) for excavation of LD10-Distributor right main canal of Ranganayaka sagar Reservoir under Kaleshwaram Project.Lr.No:G1/281/2020.Dated:26.06.2020.
- Land Acquisition of Ac.4.18 gts and Ac.5.20gts situated at Obulapur(V) of Chinnakodur(M) for excavation of Ld4-RM3 package-11 right main canal of mynars canal and LD4-LM5 package -11 left canal of mynars canal of Ranganayaka Sagar Reservoir under Kaleshwaram Project.Lr.No:G1/1290/2020.Dated:26.06.2020.
- Land Acquisition of Ac.7.29½ gts situated at Palamakula(V) of Nanganoor(M) for Construction of right main canal of mynars canal of Ranga nayaka Sagar Reservoir Under Kaleshwaram Project.Lr.No:G1/2916.2019.Dated:26.06.2020.
- Land Acquisition of Ac.2.38 Gts situated at venktravpet(V) of Thoguta(M) for Construction of Package -13 of Mallanna Sagar Reservoir canal Under Construction of Kaleshwaram Project.Lr.No:G1/1349/2019.Dated:26.06.2020
- Land Acquisition of Ac.8.06 gts situated with in the limits of Khanapur (V) of Nangnoor (M) for excavation of LD10-Distributor Right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project Lr.No.G1/282/2020, Dated:25.06.2020.
- Land Acquisition of Ac.3.05 gts situated within the limits of Palamakula (V) of Nangnoor (M) for Excavation of LD6-RM3 minor of right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/1286/2019, Dated:25.06.2020.
- Land Acquisition of Ac.5.00 gts situated within the limits of Palamakula (V) of Nangnoor (M) for Excavation of minors of right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/1287/2019, Dated:25.06.2020.
- Land Acquisition of Ac.5.22 gts situated within the limits of Palamakula (V) of Nangnoor (M) for Excavation of minors of right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/621/2019, Dated:25.06.2020.
- Land Acquisition of Ac.2.24 gts situated within the limits of Baddipadaga (V) of Nangnoor (M) for excavation of Right main canal of Ranganayaka sagar reservoir under Kaleshwaram project. File.No.G1/1554/2019,Dated:24.06.2020.
- Land Acquisition of Ac.2.39 gts Situated at Khanapur (V) of Nanganoor (M) for Excavation of Minor of Right main canal of Ranga nayaka Sagar Reservoir under Kaleshwaram Project .Lr.No:G1/1280/2019.Dated:24.06.2020.
- Land Acquisition of Ac.1.13 gts Situated at Nanganoor (M)(V) for Excavation of Minor of Right main canal of Ranga nayaka Sagar Reservoir under Kaleshwaram Project .Lr.No:G1/1284/2019.Dated:24.06.2020.
- Land Acquisition of Ac.3.12½ gts Situated at Nanganoor (M)(V) for Excavation of Right main canal of Ranga nayaka Sagar Reservoir under Kaleshwaram Project .Lr.No:G1/1555/2019.Dated:24.06.2020.
- Land Acquisition of Ac.4.17 gts Situated at Rajagopal pet (V) of Nanganoor (M) for Excavation of Right main canal of Ranganayaka Sagar Reservoir under Kaleshwaram Project .Lr.No:G1/1283/2019.Dated:24.06.2020.
- Land Acquisition of Ac.1.04 gts Situated at Venkatapur (V) of Nanganoor (M) for Excavation of Minor of Right main canal of Ranga nayaka Sagar Reservoir under Kaleshwaram Project .Lr.No:G1/622/2019.Dated:24.06.2020.
- Land Acquisition of Ac.3.33 gts, Ac.0.30 gts situated at veerapur, Thotapally villages of Bejjanki (M) for excavation of Sub minors of Annapoorna (Ananthagiri) Reservoir under Kaleshwaram project.Lr.No.G1/1231/2020, G1/1232/2020, Dated:23.06.2020.
- Land Acquisition of Ac.26.04½ gts situated at Baswapur (V) of Koheda (M) for excavation of LD-6 Distributor canal of RMC for Ranganayaka sagar Reservoir under Kaleshwaram project. Lr.No.G1/877/2020, Dated:23.06.2020.
- Land Acquisition of Ac.7.05 gts Situated within the limits of Baddipadaga (V) of Nanganoor (M) for Excavation of Right main canal of Ranganayaka Sagar Reservoir under Kaleshwaram Project.Lr.No:G1/1559/2019.Dated:23.06.2020.
- Land Acquisition of Ac.2.07 gts Situated at Maqdhumpur (V) of Nanganoor (M) for Excavation of RM3-LM2 Minar of Right main canal of Ranganayaka Sagar Reservoir under Kaleshwaram Project .Lr.No:G1/619/2019.Dated:23.06.2020.
- Land Acquisition of Ac.1.35gts Situated at Mundrai(V) of Nanganoor (M) for Excavation of right main canal of Ranganayaka Sagar Reservoir under Kaleshwaram Project .Lr.No:G1/1550/2019.Dated:23.06.2020.
- Land Acquisition of Ac.3.06.gts Situated at Narmetta (V) of Nanganoor(M) for Excavation of Minars of Right main canal of Ranganayaka Sagar Reservoir under Kaleshwaram Project.Lr.No:G1/1279/2019.Dated:23.06.2020.
- Land Acquisition of Ac.0.12 gts Situated at Rajagopalpet (V) of Nanganoor (M) for Excavation of Right main canal of Ranganayaka Sagar Reservoir under Kaleshwaram Project Lr.No:G1/2915/2019.Dated:23.06.2020.
- Land Acquisition of Ac.0.07gts Situated at Rampur (V) of Nanganoor (M) for Excavation of Minors of Right main canal Of Ranganayka Sagar Reservoir under Kaleshwaram Project .Lr.No:G1/1282/2019.Dated:23.06.2020.
- Land Acquisition of Ac.1.19 gts Situated at Thimmaipally (V) of Nanganoor (M) for Excavation of LD8-LM1 Minors of Right main canal of Ranganayaka Sagar Reservoir under Kaleshwaram Project .Lr.No:G1/623/2019.Dated:23.06.2020.
- Land Acquisition of Ac.12.09 gts, Ac.8.33 gts totalling to an extent of Ac.21.02 gts situated within the limits of Manthoor (V) of Raipole (M) for excavation of D-8 & D-9 Distributory of right main canal under Klaeshwaram project File.No.G2/1750/2019, Dated:17.06.2020.
- Land Acquisition of Ac.1.26 gts situated at Dhamarakunta (V) of Markook (M) for excavation of D-2L on M.Thurkapalli Distributory canal under Kaleshwaram project.Lr.No.G2/462/2020, Dated:15.06.2020.
- Land Acquisition of 0.26 gts situated within the limits of Velkatoor village of siddipet (U) Mandal for Laying of road from Husnabad to Mandapally for connecting to TSIIC. Lr.No.G1/2542/2019, Dated:11.06.2020.
- Land Acquisition of Ac.18.19 gts situated within the limits of Chinthamadaka village of siddipet (R) Mandal for excavation of (6R) Distribution of Main canal of Sri Komuravelli Mallanna sagar under Kaleshwaram project.Lr.No.G1/1735/2019,Dated:11.06.2020.
- Land Acquisition of Ac.102.21½ gts situated within the limits of cherial,Dommata, Veerannapet H/o Musthyala & Musthyala villages of Distributaries, Minors & sub-Minors of Tapaspally Reservoir under J.chokkarao Devadula Lift Irrigation Project phase-II Lr.No.G3/1561/2018,Dated:11.06.2020.
- Land Aquisition of Ac.0.21 gts situated within the limits of Maqdumpur Village of Nangnoor Mandal for excavation of LD6 Distributory of Right Main canal of Sri Ranganayakula Sagar under Kaleshwaram project.Lr.No.G1/1453/2018, Dated:09.06.2020.
- Land Acquisition of Ac.1.15 gts situated within the limits of Palamakula village of Nangnoor Mandal for excavation of right Main canal LD-6 of Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/1289/2019, Dated:09.06.2020.
- Land Acquisition of Ac.2.21 gts situated within the limits of Rampur village of Nangnoor Mandal for Excavation of LD6-LM1-LsM5 Minors of Right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/1549/2019,Dated:09.06.2020.
- Land Acquisition of Ac.1.23 gts situated within the limits of Palamakula village of Nangnoor Mandal for Excavation of Ld-4 Minor of Right main canal of Ranganayakula sagar Reservoir under Kaleshwaram project. Lr.No.G1/1288/2019,Dated:09.06.2020.
- Land Acquisition of Ac.1.3650 gts situated within the limits of Konaipally village of Nangnoor Mandal for Excavation of LD4-RM1 Minors of right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/1552/2019,Dated:09.06.2020.
- Land Acquisition of Ac.9.26 gts situated within the limits of Machapur (V) of Chinnakodur (M) for Excavation of Parallel conveyor system from Ananthagiri Reservoir under Kaleshwaram project. Lr.No.G1/1350/2020, Dated:09.06.2020.
- Land Acquisition of Ac.9.14½ gts situated within the limits of Allipur (V) of Chinnakodur (M) for Excavation of Minor canal of Ananthagiri Reservoir under Kaleshwaram project.Lr.No.G1/90/2020,Dated:09.06.2020.
- Land Acquisition of Ac.1.09 Gts situated at Shivarvenkatapur (V) Markook (M) for excavation of Jagadevpur Distributory Canal under Kaleshwaram Project.Lr.No:G2/1850/2019.Dated:08.06.2020.
- Land Acquisition of Ac.0.27 gts situated at Markook (V) & (M) for construction of Jagadevpur OT Canal on D-5L under Kaleshwaram Project.Lr.No.G2/1381/2018,Dated:06.06.2020.
- Land Acquisition of Ac.6.32 gts for D-5L situated at Karkapatla (V) of Markook (M) for excavation of Thurkapalli Distributory canal under Kaleshwaram project.Lr.No.G2/2409/2019,Dated:06.06.2020.
- Land Acquisition of Ac.5.05 gts situated at Pidched (V) of Gajwel (M) for excavation of D-1R on Ramayampet Distributory canal under Kaleshwaram project.Lr.No.G2/2059/2019,Dated:06.06.2020.
- Land Acquisition of Ac.2.24 gts for (D-9R), Ac.3.27 Gts for (D-11R) & Ac.3.31 Gts for (D-10R) totalling to an extent of Ac.10.02 Gts situated at Dharmareddypally (V) of Gajwel (M) for construction of Gajwel Distributory canal under Kaleshwaram project.Lr.No.G2/1915/2019,Dated:06.06.2020.
- Land Acquisition of Ac.3.12 Gts on D-10L,Ac.5.08 Gts on D-7L,Ac.2.24 Gts on D-6R&Ac.8.28½ Gts on D-5R totaling Ac.19.32½ situated at itikyala (V) of Jagadevpur (M) for excavation of Jagadevpur Distributory Canal under Kaleshwaram Project.Lr.No:G2/2385/2019.Dated:03.06.2020.
- Land Acquisition of Ac.4.00 Gts situated at Dharmaram (V) of jagadevpur(M) for excavation of D-1L on M.Thurkapalli Distributory Canal under Kaleshwaram Project.Lr.No:G2/1670/2019.Dated:03.06.2020.
- Land Acquisition of Ac.3.12 Gts on D-13TE &Ac.3.36 ½ on D-8L totaling of Ac.7.08½ situated at Zapthisingaipalli &Adavimajeed (V) of Mulugu Mandal For excavation of Thurkapalli Distributory Canal .Lr.No:G2/772/2020.Dated:03.06.2020.
- Land Acquisition of Ac.12.26 Gts situated at Ramachandrapur(V) of Jagadevpur (M) for Construction of new BG Railway line between Manoharabad & Kothapalli (V) .Lr.No:G3/1523/2016.Dated:03.06.2020.
- Land Acquisition of Ac.0.30½ Gts Erravalli (V) of Markook (M) for excavation of D-6L on Jagadevpur Distributory Canal under Kaleshwaram Project .Lr.No:G2/1850/2019.Dated:03.06.2020.
- Land Acquisition of Ac.2.13 Gts for M-3R on D-5L situated at Erravalli (V) of Markook(M) for excavation of Jagadevpur Distributory Canal.Lr.No:G2/1850/2019.Dated:28.05.2020.
- Land Acquisition of Ac.3.36 gts situated within the limits of Peddagundavelly (V) of Dubbak (M) for excavation of 6R Distributory main canal for Mallanna sagar Reservoir under Klaeshwaram Project. Lr.No.G1/1900/2019, Dated:27.05.2020.
- Land Acquisition of Ac.3.37 gts situated within the limits of Chandlapur (V) of Chinnakodur (M) for excavation of 3R distributory main canal of Sri Komuravelli Mallanna sagar under Kaleshwaram project. Lr.No.G1/2305/2019,Dated:15.02.2020.
- Land Acquisition of Ac.33.20 gts situated within the limits of Cheekode (V) of Dubbak (M) for excavation of 4 L Distributory main canal for Komuravelli Mallanna sagar Reservoir under Kaleshwaram project. Lr.No.G1/1898/2019, Dated:27.05.2020.
- Land Acquisition of Ac.22.37 gts situated within the limits of Baswapur (V) of Koheda (M) for excavation of LD-6 of Right Main canal of Ranganayakasagar under Kaleshwaram project.Lr.No.G1/877/2020, Dated:27.05.2020.
- Land Acquisition of Ac.9.21½ gts on D-1L situated at Markook (V) & (M) for excavation of Jagadevpur Distributory canal under Kaleshwaram project.Lr.No.G2/463/2020,Dated:22.05.2020.
- Land Acquisition of Ac.9.38 Gts situated at Gangadarpally (V) of Mulugu (M) for excavation of D-13 TE on Turkapally Distributory Canal.Lr.No:G2/813/2020.Dated:18.05.2020.
- Land Acquisition of Ac.6.04½ Gts on D-11R,Ac.1.21 Gts on D-1L&AC.3.17 Gts totaling Ac.11.02½ Gts Situated at jaligama (V) of Gajwel (M) for excavation of Gajwel Distributory Canal under Kaleshwaram Project.Lr.No:G2/2312/2019.Dated:18.05.2020
- Land Aquisition of Ac.16.03 Gts situated at Chebarthy (V) of Markook (M) for Construction of D-2R on Gajwel Distributory Canal under Kaleshwaram Project.Lr.No:G2/1917/2019.Dated:18.05.2020.
- Land Acquisition of Ac.6.33 ¾ Gts situated at Wargal (V)&(M) for stabilization of Nizam Sagar Project by feeding the Reservoir through Haldi River from Sangareddy Main Canal.Lr No.G2/3055/2019,Dated:18.05.2020.
- Land Acquisition of Ac.2.21¾ gts for M-2R on D-5L, Ac.1.18 gts for M-2R on D-5L & Ac.3.26 gts on D-4L totaling to an extent of Ac.7.25¾ gts situated at Erravalli & Markook villages of Markook Mandal for excavation of Jagadevpur Distributory canal.Lr.No.G2/1850/2019, Dated:12.05.2020.
- Land Acuisition of Ac.11.12 gts situated at Kangal (V) of Thoguta (M) & Ac.0.25 gts situated at Lingampet (V) of Thoguta (M) for excavation of distributor canals of main canal of Mallannasagar under Kaleshwaram project.Lr.No.G1/2311/2019, G1/2304/2019, Dated:07.05.2020.
- Land Acuisition of Ac 4.21 gts Situated at Raghavapur (V) of Siddipet (R) (M) for excavation of 4-R Distributory main canal of Sri komuravelli mallanna sagar Reservoir under Kaleshwaram project.Lr.No:G1/1813/2019.Dated:07.05.2020.
- Land Acquisition of Ac.15.11gts Situated at Ankshapur(v) of Nangnoor (M) for excavation of right main canal of Ranganayak Sagar Reservoir under Kaleshwaram Project .Lr.No:G1/1281/2019,Dated:07.05.2020.
- Land Acquisition of Ac 21.20gts Situated in Alwal (V) of Mirdoddi (M) for excavation of D-11 Distributory of right main canal of Sri Komuravelly Mallanna Sagar Reservoir Under Kaleshwaram Project.Lr.No:G1/1901/2019,Dated:07.05.2020.
- Land Acquisition of Ac.9.21 gts situated within the limits of Posanpally, Gouraipally & Guruvanapet Villages of Komuravelli (M) for Distributaries, Minors & Sub-Minors of Tapaspally Reservoir under JCRDLIS. Lr.No.G3/1268/2018,Dated:07.05.2020.
- Land Acquisition of Ac.27.12 gts situated at Thirmalapur, Md.Shapur, Deepayampalli, Doulthabad, Govindapur, Indupriyal, Villages of Doulthabad (M) for excavation of Ramayampet Distributory canal under Kaleshwaram project Lr.No.G2/2388/2019, Dated:28.04.2020.
- Land Acquisition of Ac.69.28¼ gts situated at Konapur, Sheripally, Bandaram, Mubaraspur, Surampally, Lingarajupally, Domata, and Upparapalli Villages of Doulthabad (M) for excavation of Upparapalli Distributory canal under Kaleshwaram project Lr.No.G2/1802/2019, Dated:28.04.2020.
- Land Acquisition of Ac.7.14 gts situated at Marpadaga (V) & Ac.0.15 gts in the limits of Ankireddypalli (V) of Kondapak (M) for excavation of canals of Mallannasagar under Kaleshwaram project Lr.No.G1/2334/2019, G1/2333/2019, Dated:27.04.2020.
- Land Acquisition of Ac.4.28 gts situated at in the limits of Komuravelli (V) & Ac.0.19 gts in the limits of Gouraipally (V) of Komuravelli (M) for construction of Railway line between Manoharabad and Kothapally Lr.No.G3/1523/2016, Dated:27.04.2020.
- Land Acquisition of Ac.20.16, 17.09, 0.31, 17.14¾, 14.24½, 4.12¼ gts situated at Dumpalapalli, Hasanmeerapur, Peddagundavelli, Gambeerpur, Potharam, Dumpalapalli Villages of Dubbak (M) & Ac.1.36 gts situated at Raghavapur (V) of Siddipet Rural (M) for excavation of distributor canals of Main canal of Mallannasagar under Kaleshwaram Project. Lr.No.G1/2176/2019,G1/1896/2019, G1/2177/2019, G1/2179/2019, G1/1897/2019, G1/2178/2019, G1/2308/2019 Dated:22.04.2020.
- Land Acquisition of Ac.9.09 gts situated at Mittapally (V) of Siddipet (U) Mandal & Ac.3.29 gts situated at Chinnakodur (V) & (M) for excavation of LD-4 RM2-R3 canals under Ranganayakasagar under Kaleshwaram project. Lr.No.G1/787/2020, Dated:22.04.2020.
- Land Acquisition of Ac.21.19½ Gts situated at Singanaguda (V) of Mulugu (M) for excavation of Sangareddy Main Canal System under Kaleshwaram Project.Lr.No:G2/1971/2019.Dated:20.04.2020.
- Land Acquisition of Ac.1.04 Gts on D-6L& Ac.8.37 Gts on D-7L totaling to an extent of Ac.10.01 Gts situated at Kotyala (V) of Mulugu Mandal for excavation of thurkapalli Distributory Canal.Lr.No:G2/773/2020.Dated:20.04.2020.
- Land Acquisition of Ac.8.07 gts situated within limits of Kamalayapalli (V) of Maddur (M) for LD-10 of Right Main canal of Ranganayakasagar under Kaleshwaram project. Lr.No.G1/782/2020, Dated:20.04.2020.
- Land Acquisition of Ac.29.11 gts situated at Danampalli (V) of Cherial (M) for excavation of LD-10 RMC of Sri Ranganayakasagar under Kaleshwaram Project. Lr.No.G1/778/2020,Dated:18.04.2020.
- Land Acquisition of Ac.1.26, 28.19, 14.19 gts situated at chellapur, Peddagundavelli, Rajakkapet villages of Dubbak (M) & Ac.38.38 gts situated at Bandarupalli (V) of Thoguta (M) & Ac.4.04, 7.19, 16.36, 2.34 gts situated at Machapur, Pullur, Raorukula, Raorukula villages of Siddipet Rural (M) for excavation of canals of Mallannasagar under Kaleshwaram Project. Lr.No.G1/2353/2019, Dated:18.04.2020.
- Land Acquisition of Ac.7.00½ & Ac.19.07 gts situated at Nangnoor & Ghanpur Villages of Nangnoor (M) for excavation of canals of Right Main canal of Ranganayakasagar Reservoir under Kaleshwaram project.Lr.No.G1/1548/2019,G1/1556/2019,Dated:18.04.2020.
- Land Acquisition of Ac.109.05 gts situated within the limits of Laddanur, Marmamula, Salakapur, Vangapally, Kootigal, Vallampatla, Rebarthy, Lakkapally, Dharmaram, Maddur Villages of Maddur Mandal for Distributaries, Minors & Sub-Minors left canal under JCRDLIS. Lr.No.G3/833/2018,Dated:17.04.2020.
- Land Acquisition of Ac.8.06 gts situated within the limits of Khanapur (V) of Nangnoor (M) for LD-10 of Right main canal of Ranganayakasagar under Kalleshwaram project.Lr.No.G1/282/2020, Dated:08.04.2020.
- Land Acquisition of Ac.9.19 gts situated within the limits of Maisamaplli (V) of Nangnoor (M) for LD-10 of Right main canal of Ranganayakasagar under Kaleshwaram project.Lr.No.G1/281/2020, Dated:08.04.2020.
- Land Acquisition of Ac.8.25 gts, 2.22 gts, Ac.5.06 gts, Ac.0.33 gts situated at Rampur (V) of Nangnoor (M) for excavation of canals under Ranganayakasagar Reservoir. Proc.No.G1/624/2019, Dated:31.03.2020.
- Land Acquisition of Ac.5.23 gts situated at Palamakula (V) of Nangnoor (M) for Excavation of Right Main Canal of Ranganayaka Sagar Reservoir under Kaleshwaram project. Proc.No.G1/621/2019, Dated:31.03.2020.
- Land Acquisition of Ac.1.19 gts situated at Thimmaipally (V) of Nangnoor (M) for Excavation of Right Main canal of Ranganayaka Sagar Reservoir under Kaleshwaram Project. Lr.No.31.03.2020
- Land Acquisition of Ac.4.13 gts situated at Venkatapur (V) of Nangnoor (M) for Excavation of Right Main canal of Ranganayaka Sagar Reservoir under Kaleshwaram project Proc.No.G1/622/2019, Dated:31.03.2020.
- Land Acquisition of Ac.6.02 gts situated at Nangnoor(V)&(M) for Excavation of Right Main canal of Ranganayaka sagar Reservoir under Kaleshwaram project Proc No.G1/620/2019, Dated:31.03.2020.
- Land Acquisition of Ac.3.37 Gts on D-9L&Ac 1.09 Gts on D7R totaling to extent of Ac.5.06 Gts situated at Itikyala (V) of Jagadevpur (M) for excavation of Jagadevpur Distributory Canal.Lr.No:G2/2385/2019.Dated:27.03.2020.
- Land Acquisition of Ac.55.17 ½Gts situated at Mulugu(V)& (M) for construction of Sangareddy Main Canal under Kaleswaram Project .Lr.No:G2/2091/2019.Dated:27.03.2020.
- Land Acquisition of Ac.35.07 Gts situated at Achaipally(V) of Mulugu (M) for construction of Sangareddy Main Canal under Kaleswaram Project .Lr.No:G2/1849/2019.Dated:27.03.2020.
- Land Acquisition of Ac.36.33½ Gts situated at srirampur (V) of Mulugu (M) for construction of Sangareddy Main Canal under Kaleswaram Project .Lr.No:G2/1822/2019.Dated:27.03.2020.
- Land Acquisition of Ac.23.19 gts for (D-2R), situated at Pamulaparthy (V) of Gajwel (M) for construction of Gajwel Distributory canal under Kaleshwaram project.Lr.No.G2/1816/2019,Dated:21.03.2020.
- Land Acquisition of Ac.0.23¾ gts situated at Rudraram (V) of Mirdoddi (M) for excavation of D-16 Distributory canal under Kaleshwaram project.Lr.No.G2/3049/2018,Dated:21.03.2020.
- Land Acquisition of Ac.14.08 gts situated at Rudraram (V) of Mirdoddi (M) for excavation of D-16 Distributory canal under Kaleshwaram project.Lr.No.G2/3049/2018,Dated:21.03.2020.
- Land Acquisition of Ac.292.05¾ gts situated at Achaipally (V) of Mulugu (M) for establishment of Industrial park.Lr.No.G2/2740/2019,Dated:21.03.2020.
- Land Acquisition of Ac.0.08Gts for D-2R&Ac.0.09Gts for D-3R totaling to an extent of AC.0.17 Gts situated at Erravalli (V) of Markook(M) for excavation of Jagadevpur Distributary Canal under Kaleshwaram Project.Lr.No:G2/1850/2019.Dated:19.03.2020.
- Land Acquisition of Ac.3.11½ Gts for D-3R situated at vardharajpur (V) of Markook (M) for excavation of jagadevpur Distributory Canal .Lr.No:G2/1850/2019.Dated:19.03.2020.
- Land Acquisition of Ac.1.25½ for D-2R situated at vardharaj (V) of Markook (M) for excavation of Jagadevpur Distributary Canal .Lr No:G2/1850/2019.Dated:19.03.2020.
- Land Acquisition of Ac.36.33½ gts situated at Srirampur village of Mulugu mandal for construction of Sangareddy Canal under Kaleshwaram Project.Proc.No.G2/1822/2019,Dated:17.03.2020.
- Land Acquisition of Ac.12.02 gts for (D-6R),Ac.18.35 gts for (D-7) & Ac.2.00 gts for (D-8) totaling to an extent of Ac.32.37 gts situated at Kolgur (V) of Gajwel (M) for excavation of Package-13 Distributory canal under Kaleshwaram project.Lr.No.G2/1778/2019,Dated:11.03.2020.
- Land Acquisition of Ac.4.01 gts for D-1L situated at Dharmaram (V) of Jagadevpur (M) for excavation of M.Thurkapally Distributory canal.Lr.No.G2/1670/2019,Dated:11.03.2020.
- Land Acquisition of Ac.3.15½ gts for D-1L situated at Dhamarakunta (V) of Markook (M) for excavation of M.Thurkapally Distributory canal.Lr.No.G2/1670/2019,Dated:11.03.2020.
- Land Acquisition of Ac.3.27 gts situated at Yelkal (V) of Raipole (M) for excavation of D-ADD on Kistapur Distributory canal under Kaleshwaram project.Lr.No.G2/1959/2019,Dated:11.03.2020.
- Land Acquisition of Ac.1.12½ gts for D-8L situated at Majeedpally (V) of Wargal (M) for excavation of Ramayampet Distributory canal under Kaleshwaram project.Lr.No.G2/1969/2019,Dated:11.03.2020.
- Land Acquisition of Ac.1.18 gts situated at Dharmarakunta (V) of Markook (M) for excavation of D-1L on Thurkapally Distributory canal under Kaleshwaram project.Lr.No.G2/2409/2019,Dated:11.03.2020.
- Land Acquisition of Ac.14.35 gts & Ac.8.05 gts situated at Govindapur & Upparipally villages of Doulthabad (M) for excavation of package-13 Distributory canal.Lr.No.G2/386/2020,Dated:11.03.2020.
- Land Acquisition of Ac.19.11 gts for (D-2R), situated at Chebarthy (V) of Gajwel (M) for construction of Gajwel Distributory canal under Kaleshwaram project.Lr.No.G2/1817/2019,Dated:11.03.2020.
- Land Acquisition of Ac.16.11 gts for (D-2R) situated at Alirajpet (V) of Jagadevpur (M) for construction of Gajwel Distributory canal under Kaleshwarm project.Lr.No.G2/1783/2019,Dated:11.03.2020.
- Land Acquisition of Ac.12.08 gts for D-1R & Ac.3.30½ gts for D-2R totaling to an extent of Ac.15.38 1/2 gts situated at Ankireddypalli (V) of Raipole (M) for excavation of Ramayampet Distributory canal under Kaleshwaram project.Lr.No.G2/2049/2019,Dated:06.03.2020.
- Land Acquisition of Ac.6.30 fts situated at Bejgoan (V) Gajwel (M) for excavation of D-5 on package -13 Distributory canal under Kaleshwaram project.Lr.No.G2/1383/2019,Dated:06.03.2020.
- Land Acquisition of Ac.5.06 1/2 gts for (D-1L) situated at Waddepally (V) of Raipole (M) for excavation of Kistapur Distributory canal under Kaleshwaram project.Lr.No.G2/2050/2019,Dated:06.03.2020.
- Land Acquisition of Ac.38.11 gts situated at Laxmakkapally (V) of Mulugu (M) for Excavation of Sangareddy Main canal system under Kaleshwaram project.Lr.No.G2/1210/2019,Dated:06.03.2020.
- Land Acquisition of Ac.25.03 gts situated at Doulapur (V) of Jagadevpur (M) for construction of (D-9R) on Jagadevpur Distributory canal under Kaleshwaram project.Lr.No.G2/1776/2019,Dated:06.03.2020.
- Land Acquisition of Ac.12.30 gts for D-1L situated at Markook (V) & (M) for excavation of Jagadevpur Distributory canal.Lr.No.G2/463/2020,Dated:06.03.2020.
- Land Acquisition of Ac.1.26 gts for D-2L situated at Dhamakunta (V) of Markook (M) for Excavation of M.Thurkapally Distributory canal.Lr.No.G2/462/2020,Dated:06.03.2020.
- Land Acquisition of Ac.03.36 gts Situated at Nacharam (V) of Wargal (M) for construction of Kondapochamma sagar Kistapur Distributory canal.Lr.No.G2/1913/2019,Dated:06.03.2020.
- Land Acquisition of Ac.11.02½ gts for D-1R situated at Arepally(S.J) village of Raipole (M) for excavation of Ramayampet Distributory canal.Lr.No.G2/2443/2019,Dated:06.03.2020.
- Land Acquisition of Ac.6.39 gts situated at Thimmapur (V) of Jagadevpur (M) for Excavation of D-TE on Jagadevpur Distributory canal under Kaleshwaram project.Lr.No.G2/1777/2019,Dated:06.03.2020.
- Land Acquisition of Ac.6.08½ gts for D-3R situated at Kothapally (V) of Raipole (M) for excavation of Ramayampet Distributory canal under Kaleshwaram project.Lr.No.G2/2058/2019,Dated:06.03.2020.
- Land Acquisition of Ac.3.22½ gts situated at Anajipur (V) of Raipole (M) for excavation of D-3R on Ramayampet Distributory canal under Kaleshwaram project.Lr.No.G2/2058/2019,Dated:06.03.2020.
- Land Acquisition of Ac.11.25¼ gts situated at Raipole (V) & (M) for excavation of D-3R on Ramayampet Distributory canal under Kaleshwaram project.Lr.No.G2/1958/2019,Dated:06.03.2020.
- Land Acuisition of Ac.7.36 gts situated at Begumpet (V) of Raipole (M) for excavation of D-4L on Kistapur Distributory canal under Kaleshwaram project.Lr.No.G2/1375/2019,Dated:06.03.2020.
- Land Acquisition of Ac.1.16½ gts for D-1L situated at Singaipally (V) of Wargal (M) for excavation of Ramayampet Distributory canal under Kaleshwaram Project.Lr.No.G2/1968/2019,Dated:04.03.2020.
- Land Acquisition of Ac.14.29 gts for D-5L & Ac.2.28 1/2 gts for D-8L situated at Nemtoor (V) of Wargal (M) for excavation of Ramayampet Distributory canal under Kaleshwaram Project.Lr.No.G2/1968/2019,Dated:04.03.2020.
- Land Acquisition of Ac.1.29 gts situated at Theegal (V) of Jagadevpur (M) for excavation of D-2R on Gajwel Distributory canal under Kaleshwaram project.Lr.No.G2/1787/2019,Dated:03.03.2020.
- Land Acquisition of Ac.0.15 gts for D-5L & Ac.1.38 gts for D-6L situated at Jabbapur (V) of Wargal (M) for excavation of Ramayampet Distributory canal under Kaleshwaram Project.Lr.No.G2/1912/2019,Dated:03.03.2020.
- Land Acquisition of Ac.6.28 gts for D-5L & Ac.0.04 gts for D-5L situated at Madaram & Chandapur villages of Wargal (M) for excavation of Ramayampet Distributory canal under Kaleshwaram Project.Lr.No.G2/1912/2019,Dated:03.03.2020.
- Land Acquisition of Ac.1.35½ gts situated at Raipole (V)& (M) for excavation of D-1R on Upparipally Distributory canal under Kaleshwaram project.Lr.No.G2/2048/2019,Dated:03.03.2020.
- Land Acquisition of Ac.16.05 gts situated at Chinnathimmapur (V) of Mulugu (M) for excavation of Sangareddy Main canal system under Kaleshwaram project.Lr.No.G2/1970/2019,Dated:03.03.2020.
- Land Acquisition of Ac.0.39 gts, Ac.0.18 gts, Ac.0.29 gts situated at Gollapally (V) of Jagadevpur (M) for excavation of D-9R, D-11L & D-12L on Jagadevpur Distributory canal.Lr.No.G2/1818/2019,Dated:03.03.2020.
- Land Acquisition of Ac.1.29 gts situated at Theegul (V) of Jagadevpur (M) for excavation of D-2R on Gajwel Distributory canal under Kaleshwaram project.Lr.No.G2/1787/2019,Dated:03.03.2020.
- Land Acquisition of Ac.0.06 gts situated within the limits of Narsapur (V) of Siddipet Urban (M) for construction of Sewerage Treatment plant(S.T.P).Lr.No.G1/650/2018,Dated:03.03.2020.
- Land Acquisition of Ac.35.23 gts situated within the limits of Pullur (V) of Siddipet Rural (M) for construction of Excavation of Pressure mains of Parallel conveyor system from Ananthagiri Reservoir under Kaleshwaram project.Lr.No.G1/1496/2017,Dated:02.03.2020.
- Land Acquisition of Ac.20.22 gts situated within the limits of Akkenapally (V) of Nangnoor (M) for construction of Distributory right main canal of Ranganayakula sagar Reservoir under Kaleshwaram project.Lr.No.G1/1557/2019,Dated:02.03.2020.
- Land Acquisition of Ac.18.11 gts situated within the limits of Nangnoor (V) of Nangnoor (M) for construction of right main canal of Ranganayakula sagar Reservoir under Kaleshwaram project.Lr.No.G1/1285/2019,Dated:02.03.2020.
- Land Acquisition of Ac.30.21 gts situated within the limits of Ghatlamalyala (V) of Nangnoor (M) for construction of Distributory right main canal of Ranganayakula sagar Reservoir under Kaleshwaram project.Lr.No.G1/1551/2019,Dated:02.03.2020.
- Land Acquisition of Ac.2.11 gts situated at Narayanapur (V) of Koheda (M) for construction of thotapally lift scheme canal Lr.No.G3/332/2019,Dated:25.02.2020.
- Land Acquisition of Ac.1.13 gts situated at shivar venkatapur & Ac.1.10 gts situated at Vardharajpur villages of Markook (M) for excavation of Jagadevpur Distributory canal under Kaleshwaram project.Lr.No.G2/1850/2019,Dated:25.02.2020.
- Land Acquisition of Ac.1.17 gts situated at Dhamarkunta (V) of Markook (M) for excavation of M-2R on D-1L on Thurkapally Distributory canal.Lr.No.G2/2409/2019,Dated:25.02.2020.
- Land Acquisition of Ac.13.02 gts situated at Karkapatla (V) of Markook (M) for excavation of Thurkapally Distributory canal.Lr.No.G2/2409/2019,Dated:25.02.2020.
- Land Acquisition of Ac.3.37 gts situated at Karkapatla (V) of Markook (M) for excavation of Thurkapally Distributory canal.Lr.No.G2/2409/2019,Dated:25.02.2020.
- Land Acquisition of Ac.1.13 gts situated at venkatapur (V) of Markook (M) for construction of Jagadevpur canal under Kaleshwaram Project.Lr.No.G2/1850/2019,Dated:25.02.2020.
- Land Acquisition of Ac.1.10 gts situated at vardarajpur (V) of Markook (M) for construction of Jagadevpur canal under Kaleshwaram project.Lr.No.G2/1850.2019,Dated:25.02.2020.
- Land Acquisition of Ac.14.10½ Gts situated at Bayyaram (V) of Gajwel(M) for excavation of D-1R on Ramayampet Distributory Canal under Kaleshwaram Project.Lr.No:G2/1957/2019.Dated:25.02.2020.
- Land Acquisition of Ac.2.21 Gts for(D-11L)and Ac.2.02 Gts for (D-12L) totaling to an extent of Ac 4.23 Gts situated at BG Venkatapur (V) of jagadevpur(M) for Constuction of Jagadevpur Distributory Canal under Kaleshwaram Project.Lr.No:G2/1819/2019.Dated:25.02.2020.
- Land Acquisition of Ac.12.12 Gts (D-1)situated at Burugupalli (v) of Gajwel(M) for excavation of package -13 Distributory Canal under Kaleshwaram Project.Lr.No:G2/1748/2019.Dated:25.02.2020.
- Land Acquisition of Ac.6.10½ Gts situated at Dacharam (V) of Gajwel(M) for excavation of (D-1R) on Ramayampet Distributory Canal under Kaleshwaram Project.Lr.No:G2/1966/2019.Dated:25.02.2020.
- Land Acquisition of Ac.0.21 Gts situated within the limits of Dhamarakunta (V) of Markook(M) for execution of Thurkapally Canal under Kondapochamma Sagar Reservoir Project.Lr.No:G2/755/2018.Dated:25.02.2020.
- Land Acquisition of Ac.4.22Gts situated at Erravelli (V) of Markook(M) for excavation of D-6L on Jagadevpur Distributory Canal.Lr.No:G2/1850/2019.Dated:25.02.2020.
- Land Acquisition of Ac.4.17 Gts situated at jagadevpur (V) &(M) for excavation of D-7R on jagadevpur Distributory Canal under kaleshwaram project.Lr.No:G2/1972/2019.Dated:25.02.2020.
- Land Acquisition of Ac.4.30 Gts for (D-9R) and Ac.2.09 Gts for(D-11L) totaling to an extent of Ac.6.39 Gts situated at jagadevpur (V)&(M) for Construction of jagadevpur Distributory canal under kaleshwaram project.Lr.No:G2/1785/2019.Dated:25.02.2020.
- Land Acquisition of Ac.3.39 Gts situated at Rimmannaguda (V) of Gajwel(M) for excavation of D-3R on Gajwel Distributory Canal under Kaleshwaram Project.Lr.No:G2/2313/2019.Dated:25.02.2020.
- Land Acquisition of Ac.2.32 Gts(D-6R) situated at Sheripalli (V) of Gajwel(M) for excavation of Package-13 Distributory Canal under Kaleshwaram Project.Lr.No:G2/1778/2019.Dated:25.02.2020.
- Land Acquisition of Ac.1.36 Gts for(D-TE),Ac.2.28 Gts for(D-14L)&Ac.2.33 Gts for(D-13L) totaling to an extent of Ac.7.17 Gts situated at Theegul (V) of jagadevpur (M) for Construction of Jagadevpur Distributory Canal under Kaleshwaram Project.Lr.No:G2/1775/2019.Dated:25.02.2020.
- Land Acquisition of Ac.10.06 Gts situated within the limits of Chinnakodur (V)&(M) for Construction of new BG Railway line Between Manoharabad and Kothapally villages.Lr.No:G3/1523/2016.Dated:19.02.2020.
- Land Acquisition of Ac.12.01 Gts situated within the limits of Chinnakodur (V)&(M) for Construction of new BG Railway line Between Manoharabad and Kothapally villages.Lr.No:G3/1523/2016.Dated:19.02.2020.
- Land Acquisition of Ac.36.10½Gts situated within the limits of Mittapally(V) Of Siddipet (U) (M) for Construction of new BG Railway line Between Manoharabad and Kothapally villages.Lr.No:G3/1523/2016.Dated:19.02.2020.
- Land Acquisition of Ac.22.00 Gts situated within the limits of Mittapally(V) Of Siddipet (U) (M) for Construction of Railway line Between Manoharabad and Kothapally villages.Lr.No:G3/1523/2016.Dated:19.02.2020.
- Land Acquisition of Ac.31.08 Gts situated within the limits of peddakodur (V) of Cinnakodur(M) for Construction of new BG Railway line Between Manoharabad and Kothapally villages.Lr.No:G3/1523/2016.Dated:19.02.2020.
- Land Acquisition of Ac.25.12 Gts situated within the limits of peddakodur (V) of Cinnakodur(M) for Construction of new BG Railway line Between Manoharabad and Kothapally villages.Lr.No:G3/1523/2016.Dated:19.02.2020.
- Land Acquisition of Ac.4.03½ gts situated within the limits of Allipur Village of Chinnakodur mandal for package-10,bund-2,Diversion channel under Kaleshwaram project.Lr.No.G1/2306/2019,Dated:15.02.2020.
- Land Acquisition of Ac.85.37 gts situated at Mutrajpalli (V) of Gajwel (M) for construction of Rehabilitation and Resettlement colony for the displaced families of sri komuravelli Mallannasagar Reservoir under Kaleshwaram project Proc.No.G1/521/2018, Dated:13.02.2020.
- Land Acquisition of Ac.7.03 Gts in the limits of Bakrichepyal (V) of Siddipet (U) (M) for Construction of Railway line between Manoharabad and Kothapally .Lr.No:G3/1523/2016,Dated:11.02.2020.
- Land Acquisition of Ac.1.34½ Gts in the limits of Nancharpalli (V) of Siddipet (U) (M) for Construction of Railway line between Manoharabad and Kothapalli .Lr.No:G3/1523/2016.Dated:11.02.2020.
- Land Acquisition of Ac.6.07 ¼ Gts in the limits of Nancharpalli (V) of Siddipet (U) (M) for Construction of Railway line between Manoharabad and Kothapalli .Lr.No:G3/1523/2016.Dated:11.02.2020.
- Extension of Preliminary Notification beyond(12) months for Land acquisition of A. 68.33 Gts., for excavation of Right and Left main canal of Tapaspally Reservoir. Proc. No. G3/2207/2018.
- Extension of Preliminary Notification beyond (12) months for Land Acquisition of 110.15½ Gts., of land for excavation of left main canal of Tapaspally Reservoir situated in the villages of Cherial (m). Proc. No. G3/1988/2018.
- Extension of time of Preliminary Notification beyond (12) months for Land acquisition of Ac. 33.33½ Gts., for the villages of Komuravelli (m). Proc No. G3/1624/2018.
- Extension of time of Preliminary Notification beyond (12) months for Land acquisition of Ac. 110.07 Gts., for the villages of Komuravelli (m). Proc No. G3/1561/2018.
- Land acquisition of Ac. 0.36 Gts., in the limits of Gouraipalli (v) of Komuravelli (m) for construction of Railway line between Manoharabad and Kothapally. Lr. No. G3/1523/2016, Dated: 25.01.2020
- Land acquisition of Ac. 5.24 Gts., in the limits of Narsapur (v) of Siddipet (u) mandal for construction of Railway line between Manoharabad and Kothapally. Lr. No. G3/1523/2016, Dated: 25.01.2020
- Land acquisition of Ac. 17.14 Gts., in the limits of Machapur (v) of Chinnakodur (m) for excavation ofR3-RM2 Minor Canal under left main canal of Sri.Ranganayaka Sagar. Lr. No. G1/88/2020, Dated: 22.01.2020
- Land Acquisition of Ac.9.26½ Gts., in the limits of Allipur (v) of Chinnakodur (m) for excavation of Minor canal under Ananthagiri Reservoir under Kaleshwaram Project. Lr.No. G1/90/2020, Dated: 22.01.2020
- Land acquisition of Ac. 3.23½ Gts., in the limits of Jakkapur (v) of Narayanraopet (m) for excavation of RD3-LM4 Minor for left main canal of Sri. Ranganayaka Sagar. Lr. No. G1/87/2020/Dated:22.01.2020
- Land acquisition of Ac. 6.39 Gts., in the limits of Sangapur (v) of Gajwel (m) for construction of houses for R&R under Kaleshwaram Project. Lr. No. G1/250/2019, Dated: 22.01.2020
- Land acquisition of Ac. 1.29 Gts., in the limits of Alipur (v) of Chinnakodur (m) for Kaleshwaram Project. Lr. No. G1/89/2020/Dated: 22.01.2020
- Land Acquisition of Ac.3.02 gts situated within the limits of Pullur (V) of siddipet (R) Mandal for construction of 4R Distributory main canal of sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project.Lr.No.G1/1814/2019,Dated:21.01.2020.
- Land Acquisition of Ac.23.31 gts situated within the limits of Chinnagundavelli(V) of siddipet (R) Mandal for excavation of main canal and its distributaries of sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project.Lr.No.G1/2940/2019,Dated:21.01.2020.
- Land Acquisition of Ac. 0.34 Gts., land in the limits of Ananthagiripally (v) of Wargal (m) for formation of Kothapally to Manoharabad Railway line. Lr. No. G3/1523/2016, Dated: 20.01.2020
- Land acquisition of Ac. 16.03 Gts., situated at Chebarthy (v) of Markook (m) for excavation of 2R Distributory system of Gajwel canal. Lr. No. G2/1817/2019, Dated: 20.01.2020
- Land acquisition of Ac. 1.20 Gts., M-1L on D-1L situated at Dhamarakunta (v) of Markook (m) for excavation of Thurkapalli Distributory canal. Lr. No. G2/2409/2019, Dated: 20.01.2020
- Land acquisition of Ac. 26.22 Gts., situated within the limits of Mandapally (v) of Siddipet (u) mandal for construction of BG Railway line between Manoharabad and Kothapally (v). Lr. No. G2/1523/2016, Dated: 20.01.2020
- Land acquisition of Ac. 8.36 Gts., in the limists of Thimmareddypalli (v) of Kondapak (m) for construction of Railway line between Manoharabad and Kothapally. Lr. No. G3/1523/2016, Dated: 17.01.2020
- Land acquisition of Ac. 16.29 Gts., in the limits of Ramchandrapur (v) of Jagdevpur (m) for construction of Railway line between Manoharabad and Kothapally. Lr. No. G3/1523/2016, Dated: 17.01.2020
- Land acquisition of Ac. 129.3550 Gts., situated at Thuniki Bollaram (v) of Mulugu (m) for establishment of Industrial Park by TSIIC. Lr. No. E2/1848/2019, Dated:02.01.2020.
- Land Acquisition of Ac.6.21 gts situated at Thoguta (V) & (M) for construction of Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.File.No.G1/2588/2019,Dated:19.12.2019.
- Land Acquisition of Ac.39.34 gts situated within the limits of Thadkapalli Village of Siddipet (U) Mandal for construction of Parallel canal from Ananthagiri to Sri Komuravelli Mallannasagar under Kaleshwaram project.Lr.No.G1/1358/2019,Dated:29.11.2019.
- Land Acquisition of Ac.16.33¼ gts situated at Doulthabad (M) Dhommata(V) for construction of Distributary Canal D-14 of sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project. Lr.No.G1/3047/18,Dated:29.10.2019.
- Land Acquisition of Ac.136.28 gts situated at chinna gundavelly village of siddipet rural mandal for for construction of Parallel canal from Ananthagiri to Sri Komuravelli Mallannasagar under Kaleshwaram project.Lr.No.G1/1250/2019,Dated:26.09.2019.
- Land Acquisition of Ac.111.13 gts situated within the limits of Thadkapally village of Siddipet Urban Mandal for construction of Parallel canal from Ananthagiri to Sri Komuravelli Mallannasagar under Kaleshwaram project.Lr.No.G1/1358/2019,Dated:24.09.2019.
- Land Acquisition of Ac.23.11 gts situated at Ramancha (V) of Chinnakodur (M) for Distributaries of sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.Lr.No.G1/2482/2019,Dated:24.09.2019.
- Land Acquisition of Ac.39.37½ gts situated within the limits of Ramancha (V) of Chinnakodur (M) for construction of Parallel canal from Ananthagiri to Sri Komuravelli Mallannasagar under Kaleshwaram project Lr.No.G1/1385/2019,Dated:24.09.2019.
- Acquisition of 86 houses situated at Etigaddakistapur, Thirumalagiri, Mogullacheruvu Thanda villages of Thoguta (M) for construction of Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project.Lr.No.G1/1195/2017,Dated:18.09.2019.
- Land Acquisition of Ac.2.08 gts situated within the limits of Gajwel village and Mandal for construction of Gajwel outer ring road.Lr.No.G2/335/2017.,Dated:17.09.2019.
- Land Acquisition of Ac.1.15 gts,Ac.0.02 gts, Ac.3.03 gts, Ac.1.20 gts, totaling to an extent of Ac.6.00 gts situated at vardarajpur, damarakunta villages of Markook (M) for construction of Kondapochamma sagar under Kaleshwaram project.File.No.G2/2409/2019,Dated:16.09.2019.
- Land Acquisition of Ac.4.23 gts situated within the limits of chepyala village of mirdoddy mandal for excavation of D-13 Distributory of right main canal of mallanna sagar.Lr.No.G2/3043/2018,Dated:16.09.2019.
- Land Acquisition of Ac.14.19 gts situated at rajakkapet (V) of dubbak (M) for excavation of mallanna sagar main canal-(5R/A) Distribbutor under kaleshwaram project.File.No.G1/2360/2019,Dated:04.09.2019.
- Land Acquisition of Ac.7.19 gts situated at pullur (V) of siddipet(Rural) mandal for excavation of mallannasagar main canal-(3R)Distributor under Kaleshwaram project.File.No.G1/2355/2019,Dated:04.09.2019.
- Land Acquisition of Ac.8.12 gts situated at Marpadaga (V) of Kondapaka (M) for excavation of Mallanna sagar main canal-1(R) Distributor under kaleshwaram project.file.No.G1/2334/2019,Dated:04.09.2019.
- Land Acquisition of Ac.9.10½ gts situated at yellareddypet (V) of Thoguta(M) for excavation of mallanna sagar main canal-(1L/A) Distributor under Kaleshwaram project.File.No.G1/2358/2019,Dated:04.09.2019.
- Land Acquisition of Ac.1.26 Gts situated at chellapur (V) of Dubbak (M) for construction of mallanna sagar main canal -(6R) Distributor under Kaleshwaram project.Lr.No.G1/2353/2019,Dated:04.09.02019.
- Land Acquisition of Ac.5.21 Gts, situated at appanapally(V) of Dubbak (M) for construction of mallanna sagar main canal-(5R/A) Distributer under Kaleshwaram project.Lr.No:G1/2361/2019,Dated:04.09.2019.
- Land Aqcuisition of Ac.0.20 Gts, situated at ankireddypalli (V) of Kondapak(M) for construction of Mallanna sagar main canal-(1R) Distributer under Kaleshwaram project.Lr.No.G1/2333/2019,Dated:04.09.2019.
- Land Acquisition of Ac.13.12 gts situated at bakrichapyal(V) of siddipet (U) mandal for construction of Mallannasagar main canal-(1R)Distributer.Lr.No.G1/2357/2019,Dated:04.09.2019.
- Land Acquisition of Ac.28.19 Gts.,Situated at Villages of Dubbak (M),Peddagundavelli (V) for construction of kaleswaram Project ,Mallanna sagar main canal-(3L)Distributer. Lr.No:G1/2356/2019.Dated:04.09.2019
- Land Acquisition of Ac.49.21Gts for Excavation of parllel canal from Ananthagiri to Sri Komuravelli Mallanna sagar Reservoir under kaleshwaram project Situated at Thukkapur(V) of Thoguta (M).Lr.No:G1/1251/2019,Dated:04.09.2019.
- LandAcquisition Of Ac.7.26 Gts for Excavation of parllel canal from Ananthagiri to Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project Situated at Ensanpally (V) of Siddipet- Urban (M).Lr.No:G1/1356/2019.Dated:04.09.2019.
- LandAcquisition of Ac.35.36 gts For Excavation of parllel canal from Ananthagiri to Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project Situated at Burugupally (V) of Siddipet urban (M).Lr.No:G1/1357/2019.Dated:04.09.2019.
- Land Acquisition of Ac.38.21 Gts for Excavation of parllel canal from Ananthagiri to sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project Situated at venkatapur (v) of Siddipet (R)(M).Lr.No:G1/1494/2019.Dated:04.09.2019.
- Land Acquisition of Ac.50.01 gts for excavation of parllel canal from Ananthagiri to Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project Situated at Irkode (v)of Siddipet (R)(M).Lr.No:G1/1495/2019.Dated:04.09.2019.
- Land Acuisition of Ac.3.17 Gts for Construction of mallanna sagar main canal-(1R)Distributery canal under kaleshwaram Project ,Situated at nanchar palli (v) of siddipet (Arban) (M) .Lr.No:G1/2359/2019.Dated:04.09.2019.
- Land Acquisition of Ac.22.08 Gts Situated at Duddeda (V) of Kondapak (M) ,for Construction of mallanna sagar main canal-(1R) Distributery canal under kaleshwaram project.Lr.No:G1/2332/2019.Dated:04.09.2019.
- Land Acuisition of Ac.74.32 Gts situated at Ganpur (V) of Thoguta (M) for Construction of Ananthagiri reservoir from Komuravelli Mallanna sagar Reservoir parller canal under Kaleshwaram Project.Lr.No:G1/1647/2019.Dated:04.09.2019.
- Land Acquisition of Ac.12.37 gts situated at Irkode (V) of siddipet Rural (M) for construction of Mallanna sagar Main canal-(3R) Distributery under Kaleshwaram project.Lr.No.G1/2354/2019,Dated:04.09.2019.
- Land Acquisition of Ac.127.20½- Dubbak, Siddipet (U),Thoguta and Kondapak (M) Acquisition of Land for excavation of main canal and its distributaries of sri Komuravelli Mallannasagar Reservoir under Kaleshwaram project. Lr.No.G1/2356/2019, G1/2361/2019,G1/2360/2019,G1/2353/2019,G1/2354/2019,G1/2355/2019,G1/2332/2019,G1/2333/2019,G1/2334/2019,G1/2358/2019,G1/2357/2019,G1/2359/2019,Dated:04.09.2019.
- Land Acquisition of Ac.3.37 gts situated at chnadlapur(V) of Chinnakodur (M) for construction of Mallanna sagar Main canal-(3R) Distributary under Kaleshwaram Project.File.No.G1/2305/2019,Dated:29.08.2019.
- Land Acquisition of Ac.30.10 gts.,Situated at Villages of Thouguta (M) for Sri Komaravelli Mallanna Sagar Reservoir,under Kaleshwaram Project. Lr.No.G1/2310/2019, Dated:29.08.2019
- Land Acquisition of Ac.126.11 gts.,Situated at Villages of Dubbak (M) for sri Komaravelli Mallanna sagar Reservoir,under Kaleshwaram project.Lr.No.G1/2181/2019, Dated:29.08.2019
- Land Aquisition of Ac.37.30 Gts situated at Achaipally (V) of Mulugu (M). for excavation of sangareddy Main canal system.Lr.No.G2/1849/2019, Dated:29.08.2019
- Land Acquisition of Ac.4.03 situated at Allipur(V) of Chinnakodur(M) for package-10,Bund-2, Diversion channel under Kaleshwaram Project.Lr.No.G1/2306/2019,Dated:29.08.2019.
- Land Acquisition of Ac.3.36 Gts situated at Nacharam(V) and Ac.1.13½ Gts situated at Majeedpally(V) of Wargal(M) totaling to an extent of Ac.5.09½ Gts for excavation of D-4L on Kistapur Canal.Lr.No:G2/1913/2019.Dated:29.08.2019.
- Land Acquisition of Ac.40.19½ Gts,Ac.33.20 Gts,Ac.3.36 Gts,Ac.17.09 Gts situated at Dubbak,cheekode,peddagundavelli,Hasanmeerpur for excavation of main canal and its distributories of sri komuravelli mallannasagar under Kaleshwaram project.Lr.No:G1/1899/2019.Dated: 29.08.2019.
- Land Acquisition of Ac.16.11 gts & Ac.1.29 gts situated at Alirajpet & Theegul villages of Jagadevpur mandal for excavation of Gajwel Distributory canal.Lr.No.G2/1783/2019,Dated:29.08.2019.
- Land Acquisition of Ac.1.29 gts situated at Irkode (V) of siddipet rural (M) for main canal of Sri Komuravelli Mallannasagar Reservoir,under Kaleshwaram project.Lr.No.G1/4353/2017,Dated:29.08.2019.
- Land Acquisition of Ac.4.23 gts,Ac.25.22 gts,Ac.2.06 gts, Ac.6.39 gts,Ac.0.03 gts, Ac.7.17 gts & Ac.6.39 gts situated at BG Venkatapur, Doulapur, Gollapally,Jagadevpur,Munigadapa, Theegul & Thimmapur Villages of Jagadevpur (M) for excavation of Jagadevpur Distributory canal.Lr.No.G2/1775/2019,Dated:29.08.2019.
- Land Acquisition of Ac.4.28½ gts situated at Kyasaram (V) of Gajwel (M) for excavation of Gajwel Distributory canal Lr.No.G2/1374/2019,Dated:29.08.2019.
- Land Acquisition of Ac.12.11 gts & Ac.9.00 gts in the limits of Manthoor (V) of Raipole (M) for excavation D-8 Distributory & D-9 Distributory of Right main canal.Lr.No.G2/1750/2019,Dated:29.08.2019.
- Land Acquisition of Ac.1.10 gts situated at Vardarajpur (V) of Jagadevpur (M) for construction of D-7L Jagadevpur canal, and an extent of Ac.0.37 gts situated at Erravelli (V) of Jagadevpur (M) for construction of D-7L Jagadevpur canal and an extent Ac.1.13 gts situated at Shivarvenkatapur (V) of Jagadevpur (M) for construction of D-1R Jagadevpur canal under kondapochamma sagar Reservoir.Lr.No.G2/1850/2019.,Dated:29.08.2019.
- Land Acquisition of Ac.12.12Gts,Ac.12.04 Gts,Ac.17.06 Gts,Ac.2.37Gts,Ac.33.27 Gts,Ac.40.01Gts and Ac.6.30 Gts Situated at Bhurugupalli, Singatam,Pched,Sherilingampalli,Kolguru, Ahmadipur and Bejugana Villeges of Gajwel (M) for Construction of kondapochamma sagar reservoir package -13 Distributory canal system.Lr.No:G2/1748/19,G2/1772/19,G2/1383/19,G2/1778/19,G2/1855/19.Dated:29.08.2019.
- Land Acquisition of Ac.3.39 gts, Ac.14.1050 gts, Ac.6.1050 gts, Ac.0.3950 gts Ac.5.05 gts situated at Banglavenkatapur, Bayyaram, Dacharam, Maktha masanpally, Pidched Villages of Gajwel (M) for construction of Kondapochammasagar Ramayanpet Distributory canal.Lr.No. G2/1966/19, G2/1957/19, G2/2059/19, Dated:29.08.2019.
- Land Acquisition of Ac.25.37 gts situated at ponnala (V) of Siddipet(U) Mandal for excavation of main canal (1R) Distributaries of Sri.Komuravelli Mallanna sagar Reservoir under Kaleshwaram project.File.No.G1/2309/2019,Dated:29.08.2019.
- Acquisition of (03) houses / plot area situated at Bahilampur Village of Mulugu Mandal for construction of Kondapochamma sagar Reservoir under Kaleshwaram Project. Lr.No.G2/2497/2018,Dated:22.08.2019
- Acquisition of (13) houses / plot area situated at Bahilampur(V) of Mulugu (M) for construction of Kondapochamma sagar Reservoir under Kaleshwaram Project. Lr.No.G2/2497/2018, Dated:22.08.2019
- Extension of Preliminary Notification of Land Acquisition of 110.15½ Gts., of land for excavation of left main canal of Tapaspally Reservoir situated in the villages of Cherial (m). Proc. No. G3/1988/2018, Dated: 08.08.2019
- Land Acquisition of Ac.4.28½ gts situated at Kyasaram (V) of Gajwel (M) for excavation of Gajwel Distributory canal.G2/1374/2019,Dated:29.07.2019.
- Land Acquisition of Ac.0.12¼ gts situated within the limits of Konapur (V) of Doulthabad (M) for construction of Upparipally canal under Kaleshwaram project.Lr.No.G2/934/2018,Dated:23.07.2019.
- Land Acquisition of Ac.11.05½ gts situated at Appayapally(V) of Doulthabad (M) for excavation of kishtapur canal.Lr.No.G2/1801/2019,Dated:16.07.2019.
- Acquisition of (935) Houses for Construction of Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project in the limits of Etigaddakishtapur,Thirumalagiri, Mogullacheruvu thanda,laxmapur Villages of Thoguta Mandal.Proc.No:G1/1195/2017.Dated:16.07.2019.
- Land Acquisition of Ac.0.06 Gts situated within the Limits of Godugupally (V) of Doulthabad (M) for excavation of Shankarampet Canal under Kaleshwaram Project.Lr.No:G2/994/2017.Dated:16.07.2019.
- Acquisition of Houses, structures and cattle sheds situated at Pallepahad (V) of Thoguta (M) for construction of sri komuravelli Mallanna sagar Reservoir under Kaleshwaram project.Proc.No.G1/1195/2017, Dated:16.07.2019.
- Extension of time of Preliminary Notification beyond (12) months for Land acquisition of Ac. 33.33½ Gts., for the villages of Komuravelli (m). Proc No. G3/1624/2018, Dated: 15.07.2019
- Land Acquisition of Ac.1.02½ Gts situated within the limits of Mutrajpally (V) of Gajwel (M) for Construction of Gajwel Outer ring road .Lr.No:G2/335/2017.Dated:12.07.2019.
- LandAcquisition Of Ac.0.13 gts Situated at Ensanpally (V) of Siddipet- Urban (M) for Excavation of main canal of Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project File.No:G1/1648/2019.Dated:08.07.2019.
- LandAcquisition Of Ac.4.04 gts Situated at Machapur (V) of Siddipet- Rural (M) for Excavation of main canal of Sri Komuravelli Mallanna sagar Reservoir under Kaleshwaram Project File.No:G1/1736/2019.Dated:08.07.2019.
- Acquiring of Land to an extent of Ac.1.19½ gts and 82.36 Sq.yards situated within the limits of Narsapur (V) of Siddipet Urban Mandal for Construction of Double Bed Room Houses.Lr.No:G1/316/2019.Dated:08.07.2019.
- Land Acquisition of Ac.29.04 gts situated within the limits of Tadkapally Village of Siddipet Urban Mandal for Excavation of Main canal of Sri Komuravelli Mallannasagar Reservoir under Kaleshwaram Project.File.No.G1/1649/2019,Dated:08.07.2019.
- Land Acquisition of Ac.1.05 gts Situated at Machapur (V) of Chinnakodur(M) for Construction of left main canal of Ranganayaka sagar Reservoir under Kaleshwaram Project.File.No:G1/2207/2017.Dated:06.07.2019.
- Land Acquisition of Ac.7.32 gts situated at chandapur (V) of Thoguta (M) for construction of Right main canal distributor of Kaleshwaram project File.No.G1/1347/2019,Dated:06.07.2019.
- Land Acquisition of an Extent of Ac.3.06gts for Construction of Right Main Canal of Ranganayakasagar Reservoir under Kaleshwaram Project Situated at Narmeta (V) of Nanganoor (M).Lr.No:G1/1279/2019.Dated:06.07.2019.
- Land Acquisition of Ac.25.07 Gts situated within the limits of Bussapur village of siddipet rural mandal for construction of left main canal of Ranganayakasagar under Kaleshwaram project.Lr.No.G1/1370/2019,Daated:06.07.2019.
- Land Acquisition of Ac.1.13 Gts Situated at Nanganoor (V) of Nangnoor (M) for Construction of Ranganayakasagar under Kaleshwaram Project .Lr.No:G1/1284/2019.Date:06.07.2019.
- Land Acquisition of Ac.18.13 Gts for Construction of Right Main Canal of Ranganayakasagar Reservoir Under Kaleshwaram Project Situated at Nanganoor (V) of Nanganoor (M).Lr.No:G1/1285/2019.Dated:06.07.2019
- Land Acquisition of Ac.3.05 gts for Construction of Right Main canal of Ranganayakasagar Reservoir under Kaleshwaram Project Situated at palamakula (V),Nangnoor Mandal.Lr.No:G1/1286/2019.Dated:06.07.2019.
- Land Acquisition of Ac.5.01½ gts for Construction of Right Main canal of Ranganayakasagar Reservoir under Kaleshwaram Project Situated at palamakula (V),Nangnoor Mandal.Lr.No:G1/1287/2019.Dated:06.07.2019.
- Land Acquisition of Ac.3.26 gts for Construction of Right Main canal of Ranganayakasagar Reservoir under Kaleshwaram Project Situated at palamakula (V),Nangnoor Mandal.Lr.No:G1/1288/2019.Dated:06.07.2019.
- Land Acquisition of Ac.2.15 gts situated within the limits of Palamakula village of Nangnoor (M) for Right main canal of Ranganayakasagar under Kaleshwaram project.Lr.No.G1/1289/2019,Dated:06.07.2019.
- Land Acquisition of Ac.5.29 Gts situated at Giripally (V) of Gajwel (M) for Construction of Kistapur Canal under Kaleshwaram Project .Lr.No:G2/2654/2018.Dated:06.07.2019.
- Land Acquisition of Ac.89.25 Gts Situated within the limits of Gudikandula (V) of Thoguta (M) for Construction of Right main canal distributor of komuravelli mallanna sagar under kaleshwaram project.Lr.No:G1/1372/2019.Dated:06.07.2019.
- Land Acquisition of Ac.6.30 and 0.06 Gts situated at Lingapur (V) of Thoguta (M) for Construction of Right Main Canal distributor of Sri Komuravelli Mallannasagar under Kaleshwaram project.Lr.No:G1/1373/2019.Dated:06.07.2019.
- Land Acquisition of Ac.18.19 gts situated within the limits of chinthamadaka village of siddipet rural mandal for construction of main canal of sri Komuravelli Mallannasagar Reservoir underKaleshwaram project.Lr.No.G1/1735/2019,Dated:04.07.2019.
- Land Acquisition of Ac.1.20 gts situated within the limits of Datarpally (V) of Gajwel mandal for construction of Gravity canal under Kondapochamma sagar reservoir.Lr.No.G2/1935/2018.,Dated:04.07.2019.
- Land Acquisition of Ac.4.15 gts situated within the limits of Jagadevpur (V)&(M) for construction of Distributary canal of Gravity main canal in package-15,Kaleshwaram project.Lr.No.G2/389/2019,Dated:04.07.2019
- Land Acquisition of Ac.1.30 gts situated within the limits of Jaligama (V) of Gajwel (M) for construction of Gajwel Canal under Kondapochamma sagar Reservoir.Lr.No.G2/793/2018.,Dated:04.07.2019.
- Land Acquisition of Ac.0.22 gts situated at Jaligama (V) of Gajwel (M) for construction of Gajwel Canal under Kondapochamma sagar Reservoir.Lr.No.G3/469/2018.,Dated:04.07.2019.
- Land Acquisition of Ac.40.37 Gts extent of land situated within the limits of pamulaparthy (V) of Markook Mandal for Construction of Sangareddy canal under Kaleshwaram Project.Lr.No:G2/2671/2018.Dated:29.06.2019.
- Land Acquisition of Ac.45.25 gts situated within the limits of Irkode (V) of Siddipet Rural (M) for construction of Parallel canal from Ananthagiri to Sri Komuravelli Mallannasagar under Kaleshwaram project.Lr.No.G1/1495/2019,Dated:22.06.2019.
- Land Acquisition of Ac.1.04 Gts situated at lingareddy palli H/O siddipet (V)siddipet (M) for Construction of Ranga nayaka sagar Reservoir of Right main canal under Kaleshwaram project.Lr.No:G1/503/2018.Dated:22.06.2019.
- Land Acquisition of Ac.2.39 gts situated within the limits of Khanapur (V) of Nangnoor (M) for Right main canal of Ranganayakasagar under Kaleshwaram project.Lr.No.G1/1280/2019,Dated:18.06.2019.
- Extension of time of Preliminary Notification beyond (12) months for Land acquisition of Ac. 110.07 Gts., for the villages of Komuravelli (m). Proc No. G3/1561/2018, Dated: 15.06.2019
- Land Acquisition of Ac.7.26 gts situated within the limits of Ensanpalli (V) of Siddipet Urban Mandal for construction of Parallel canal from Ananthagiri to sri Komuravelli Mallannasagar under Kaleshwaram project.Lr.No.G1/1356/2019,Dated:04.06.2019
- Land Acquisition of Ac.91.32 gts situated within the limits of Ramancha (V) of Chinnakodur (M) for construction of Parallel canal from Ananthagiri to Sri Komuravelli Mallannasagar under Kaleshwaram project Lr.No.G1/1385/2019,Dated:04.06.2019.
- Land Acquisition of Ac.120.21 gts situated within the limits of Thadkapally village of Siddipet Urban mandal for construction of parallel canal from Ananthagiri to sri Komuravelli Mallannasagar under Kaaleshwaram project.Lr.No.G1/1358/2019,Dated:01.06.2019.
- Land Acquisition of Ac.33.35 gts situated within the limits of Burugupally village of Siddipet Urban mandal for construction of parallel canal from Ananthagiri to sri Komuravelli Mallannasagar under Kaaleshwaram project.Lr.No.G1/1357/2019,Dated:01.06.2019.
- Land acquisition of Ac.139.30 Gts for construction of parallel canal from Ananthagiri to sri komuravelli mallannasagar under kaleshwaram project situated at Bandarupally village of thoguta mandal.Proc.No.G1/1353/2019.Dated:01.06.2019
- Land Acquisition of Ac.72.16 gts situated within the limits of Machapur (V) of Chinnakodur (M) for construction of Parallel canal from Ananthagiri to sri Komuravelli Mallannasagar under Kaleshwaram project.Lr.No.G1/1350/2019,Dated:01.06.2019.
- Land Acquisition of Ac.135.36 Gts situated at chinna gundavelli (V) of siddipet rural (M) for construction of parallel conveyar system from Ananthagiri to sri komuravelli mallanna sagar.Lr.No.G1/1250/2019, Dated:22.05.2019.
- Land Acquisition of Ac.13.13 gts situated at gangapur(V) of chinnakodur(M) for construction of parallel conveyar system from Ananthagiri reservoir to sri komuravelli mallanna sagar.Lr.No.G1/1249/2019,Dated:22.05.2019.
- Land Acuisition of Ac.74.32 Gts Situated at Ganpur (V) of Thoguta (M) for Construction of mallanna Sagar main Canal under kaleshwaram Project-Package 12.Lr.No:G1/1252/2019.Dated:22.05.2019.
- Land Aquisition of Ac.15.10¾ Gts.situated within the limits of Kondakandla (V) of Gajwel (M) for formation of new BG railway line between Manoharabad and kothapally.Lr.No.G3/1523/2016.,Dated:21.05.2019.
- Land Acquisition of Ac.3.01 Gts situated within the limits of Bandarupally village of thoguta mandal for 2L distributory of main canal of mallanna sagar reservoir under Kaleshwaram project.Lr.No.G1/1199/2019,Dated:21.05.2019.
- Land Acquisition of Ac.38.37½ gts situated at Bandarpally village of thoguta mandal for construction of distributor of main canal of mallannasagar under Kaleshwaram project.Lr.No.G1/1190/2019,Dated:21.05.2019.
- Land Acquisition of Ac.30.00 gts situated within the limits of Dharmaram (V) of Mirdoddi (M) for 2L distributory of Main canal of Mallannasagar Reservoir under Kaaleshwaram project.Lr.No.G1/1202/2019,Dated:21.05.2019.
- Land Acquisition of Ac.33.20 Gts Situated at Ghanpur (V) of Thoguta (M) for 2Ldistributery of Main Canal of Mallanna Sagar Reservoir under Kaleshwaram Project.Lr.no:G1/1201/2019.Dated:21.05.2019.
- Land Acquisition of Ac.1.03 and 6.11 gts situated at Irkode and Venkatapur village of Siddipet Rural Mandal for construction of Distributor of main canal of Mallannasagar under Kaleshwaram project.Lr.No.G1/1191/2019,Dated:21.05.2019.
- Land Acquisition of Ac.196.18½ gts in the limits of Marpadga,sirisinagandla,Zapthinacharam, Kondapak, Vishwanathpally, Velikatta and Thimmareddypally villages of Kondapak (M) for Distributory system, Minors & sub-minors of Tapaspally Reservoir LMC under J.Chokkarao Devadula lift Irrigation project.Lr.No.G2/1092/2019,Dated:21.05.2019.
- Land Acquisition of Ac.38.28 and 9.13 gts situated at Kondapur and Mirdoddi villages of Mirdoddi (M) for acquisition of land for construction of Main canal of Mallannasagar under Kaleshwaram project.Lr.No.G1/1189/2019,Dated:21.05.2019.
- Acquisition of (807) Houses/plots situated at Erravally Revenue Village of Kondapak (M) for construction of Komuravelli Mallannasagar under Kaleshwaram project.Lr.No.G1/1126/2019.,Dated:04.05.2019.
- Acquisition of (807) Houses/plots situated at Erravally (V) of Kondapak (M) for construction of Komuravelli Mallannasagar under Kaleshwaram project.Lr.No.G1/807/2019.,Dated:01.05.2019.
- Land Acquisition of Ac.0.08 Gts&Ac.3.17½Gts Situated within the limits of Markook (V) and Markook(M) for Construction of OT-2L and 5L canal under Kondapochamma Sagar Reservoir .Lr.No:G2/1381/2018.Dated:20.04.2019.
- Land Acguisition of Ac.7.33 Gts situated within the limits of Markook (V) and Markook (M) for construction of Jagadevpur Ayocut Canal under Kondapochamma Sagar Reservoir .Lr.No:G2/4689/2017.Dated:20.04.2019.
- Land Acquisition of Ac.1.09Gts,Ac.0.11Gts and Ac.0.27Gts situated at Markook(V)&(M) for Construction of Jagadevpur Canal,0T-2L and 5L Canal and an Extent of Ac.0.04½Gts,Ac.0.12.Gts situated at Shivarvenkatapur (V) of Markook (M) for Construction of jagadevpur canal and 0T-4L canal under kondapochamma Sagar Reservoir Project.Lr.No:G3/4689/2018.Dated:20.04.2019.
- Land Acquisition of Ac.1.18 gts situated within the limits of Erravally (V) of Markook (M) for construction of Jaagdevpur canal under Kondapochamma sagar Reservoir.Lr.No.G2/4690/2017.,Dated:20.04.2019.
- Land Acquisition of Ac.6.19 Gts Situated within the limits of Gouraram (V) of Wargal (M) for Construction of Ramayampet Canal under Kondapochamma Sagar Reservoir .Lr.No:G2/1158/2018.Dated:20.04.2019.
- Land Acquisition of Ac.79.32¼ Gts situated within the limits of Gouraram(V) of Wargal (M) for Construction of Sangareddy Canal under Kondapochamma Sagar Reservoir.Lr.No:G2/2595/2018.Dated:20.04.2019.
- Land Acquisition of Ac.1.09 gts, Ac.0.11 gts, and Ac.0.27 gts situated at Markook (V) & (M) for construction of Jagadevpur canal, OT-2L and 5L canals and an extent of Ac.0.04½ gts Ac.0.12 gts situated at Shivarvenkatapur (V) of Markook (M) for construction of Jagadevpur canal and OT-4L canal under kondapochamma sagar Reservoir.Lr.No.G3/4689/2018.,Dated:20.04.2019.
- Land Acquisition of Ac.32.34 Gts for formation of Shankarampet Canal in Godugupally (V) of Doulthabad (M) under Kaleshwaram Project .Lr.No:G2/994/2018.Dated:12.04.2019.
- Land Acquisition of Ac.13.29 gts situated at Konapur (V) of Doulthabad (M) for formation of Ramayampet canal under Kaleshwaram project. Proc.No.G2/930/2018,Dated:12.04.2019.
- Land Acquisition of Ac.12.17¼ gts situated at Konapur (V) of Doulthabad (M) for formation of Upparipally canal under Kaleshwaram project.Proc.No.G2/934/2018,Dated:12.04.2019.
- Land Acquisition of Ac.7.07 Gts for Formation of New BG Railwayline Between Manoharabad and Kothapally Railway Stations in the limits of Nancharupally (V) of siddipet (U) Mandal .Proc.No:G3/1523/2016.Dated:31.03.2019.
- Land Acquisation Of Ac.5.23 gts for Construction of Right Main Canal of Ranganayaka Sagar Reservoir Under Kaleshwaram Project,Situated at Palamakula (V) of Nangnoor (M).Lr.No:G1/621/2019.Dated:26.03.2019.
- Land Acquisition of Ac.5.11 gts situated within the limits of Maqdumpur (V) of Nangnoor (M) for construction of Right main canal of Ranganayaka sagar Reservoir under Kaleshwaram project,Lr.No.G1/619/2019,Dated:26.03.2019.
- Land Acquisition of Ac.6.23 Gts Situated at Mutrajpally (V) of Gajwel (M) for Construction of Gajwel Canal Under Kaleshwaram Project.Lr.No:G2/795/2017.Dated:22.03.2019.
- Land Acquisition of an Extent of Ac.6.02 gts for Construction of Right Main Canal of Ranganayakasagar Reservoir Under Kaleshwaram Project ,Situated at Nangnoor (V) of Nanganoor (M).Lr.No:G1/620/2019,Dated:18.03.2019.
- Land Acquisition of Ac.60.14 gts situated at Dhamarakunta (V) of Markook (M) for construction of Thurkapally canal proc.No.G2/755/2018, Dated:16.03.2019.
- Land Acquisition of Ac.3.10¼ gts for formation of New BG Railway line between Manhorabad and kothapally railway stations in the limits of Kodakandla village of Gajwel mandal.Proc.No.G3/1523/2016,Dated:12.03.2019.
- Land Acquisition of Ac.3.10¼ gts situated at Kodakandla (V) of Gajwel (M) for formation of New BG Railway line between Manhorabad and Kothapally Railway stations.Lr.No.G3/1523/2016,Dated:12.03.2019.
- Land Acquisition of Ac.120.05½ situated within the limits of Mamidyala (V) of Mulugu (M) for construction of Kondapochamma sagar reservoir.Lr.No.G2/460/2017,Dated:06.03.2019.
- Land Acquisition of Ac.10.11½ gts situated within the limits of Mamidyala (V) of Mulugu (M) for construction of Kondapochamma sagar Reservoir.Lr.No.G2/460/2017,Dated:06.03.2019.
- Land Acquisition of Ac 56.34 gts,Ac.50.34 Gts and Ac.83.27 gts for Formation of new BG Railway line Between Manoharabad and kothapally railway Stations in the limits of Mittapally,Narsapur &Mandapally villages of Siddipet(U) (M).Lr.No:G3/1523/2016.Dated:03.03.2019.
- Acquisition of (222) houses for the construction of Ananthagiri Reservoir under Kaleshwaram project in the limits of Chelkapalli, yellaiahpalli, Kochaguttapalli H/o Alipur village of Chinnakodur (M) Proc.No.G1/158/2017, Dated:28.02.2019.
- Land Aquisition of Ac.48.32Gts and Ac.36.24 Gts for construction of BG Railwayline between Manhorabad and kothapalli Railway Stations in the limits of Peddakodur& Chinnakodur villages of Chinnakodur (M).Proc.No:G3/1523/2016,Dated:26.02.2019.
- Land acquisition of Ac.1.39½ Gts for Construction of Right Main Canal of Ranganayaksagar Reservoir under kaleshwaram project situated at Mittapalli of siddipet urban (M).Lr.No:G1/2192/2017.Dated:25.02.2019.
- Land Acquisition of Ac.30.36 gts situated within the limits of Jagadevpur (V) & (M) for construction of Distributary canal of Gravity main canal in package-15,Kaleshwaram project.Lr.No.G2/389/2019,Dated:23.02.2019.
- Land Acquisition of Ac.5.08 gts situated within the limits of Ibrahimnagar (V) of Chinnakodur (M) for construction of distributory canal of Ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/4683/2017,Dated:21.02.2019.
- Land Acquisition Extent of Ac.7.00 gts and Ac.1.16 gts for Construction of Distributory canal of Ranganayaka Sagar Reservoir Under Kaleshwaram Project Situated at peddakodur (V)of Chinnakodur (M).Lr.No:G1/2376/2017.Dated:21.02.2019.
- Land Acquisition of Ac.1.20 Gts Situated at Machapur (V) of Chinnakodur(M) for Construction of distributory canal of Ranganayaka sagar Reservoir under Kaleshwaram Project.Lr.No:G1/2203/2017.Dated:21.02.2019.
- Land Acquisition of Ac.1.25 Gts situated within the limits of chinnakodur (V) & (M) for construction of distributory canal of ranganayaka sagar Reservoir under Kaleshwaram project.Lr.No.G1/4678/2017,Dated:16.02.2019.
- Land Acquisition of Ac.85.37 Gts Situated within the limits of Mutrajpalli (V) of Gajwel (M) for Construction of R&R Site to Displaced families of Sri Komuravelli Mallanna Sagar Reservoir Under Kaleshwaram Project .Lr.No:G1/521/2018.Dated:15.02.2019.
- Land Acquisition of An Extent of Ac.1.19½ gts Situated at Narasapur (V) of Siddipet Urban (M) for construction of Double Bed Room Houses.Lr.No:G1/316/2019.Dated:14.02.2019.
- Land Aquisition of Ac.5.29¼ Gts. situated within the limits of Gajwel (V) and (M) for construction new BG Railway line between Manoharabad and Kothapalli Villages. Lr.No.G2/1523/2016, Dated:13.02.2019.
- Land Aquisition of Ac.12.24 Gts situated within the limits of Duddeda village of Kondapak for construction new BG Railway line between Manoharabad and Kothapalli villages. Lr.No.Lr.No.G2/1523/2016,Dated:13.02.2019.
- Land acquisition.Ac.3.22½ Gts.,situated within the limits of Gajwel(V)and (M)for the construction of Gajwel Outer Ring Road.Lr.No.G2/335/2017.,Dated:13.02.2019.
- Land Acquisition of Ac.8.39 Gts situated at within the limits of Duddeda(V) of Kondapak (M)for construction of new BG Railway line between Manoharabad and Kothapalli Villages. Lr.No:G2/1523/2016.Dated:13.02.2019.
- Land Acquisition of Ac.4.30 gts situated in the limits of Vadlur and Thotapally villages of Bejjanki Mandal for Excavation & forming Embankment of D-8 canal from KM.0.000 to 1.660 in the limits of Vadloor (V) and MMR R/S canal from Km.17.750 to Km.36.125 and Improvements to the existing Thotapally MI Tank Reservoir.Proc.No.G3/1650/17,Dated:13.02.2019.
- Land Acquisition of Ac.0.09 gts situated with in the limits of Chowdaram village of chinnakodur mandal for cnstruction of distributory canal of ranganayaka sagar reservoir under kaleshwaram project.Lr.No.G1/4681/2017,Dated:08.02.2019.
- Acquisition of (531) Houses for construction of Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project in the limits of Pallepahad (V) of Thoguta (M).Lr.No:G1/1195/2017.Dated:11.01.2019.
- Acquisition of (935) Houses for Construction of Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project in the limits of Etigaddakishtapur,Thirumalagiri, Mogullacheruvu thanda,laxmapur Villages of Thoguta Mandal.Lr.No:G1/1195/2017.Dated:11.01.2019.
- Land Acquisition of Ac.2.38 gts, Ac.17.01¼ gts, Ac.9.15 gts, Ac.7.10½ situated at Doulthabad (M) Dommata(V) for construction of Distributary canal D-14,D-15,D-16 Mallanna sagar Reservoir under Kaleshwaram project File.No.G2/4579/2017,G2/3047/18,Dated:20.12.2018.
- Land Acquisition of Ac.64.20 gts situated at Dommata (V) of Doulthabad (M) for formation of Right main canal of Package-13 of Mallanna sagar Reservoir under Kaleshwaram project Proc.No.G2/4579/2017,Dated:06.12.2018.
- Aquisition of Houses/Structures existing in the Abadi coming under submergence in kondapochamma sagar Reservoir situated within the limits Bahilampur and Thanedarpally villages of Mulugu Mandal. Lr.No.G2/2497/2018.,Dated:22.11.2018.
- Land Acuisition of Ac.35.27½ Gts.situated within the limits of veerareddypalli village of Mirdoddi Mandal for construction of D-16 Distributary of right main canal of mallanna sagar. Lr.No.G2/3048/2018,Dated:05.11.2018
- Land Acquisition of Ac.5.36.Gts Situated at Giripally (V) of Gajwel (M) for Construction of Kistapur Canal under Kaleshwaram Project.Lr.No:G2/1276/2018.Dated:29.10.2018.
- Land Acquisition of An Extent of Ac 67.21 Gts Situated at pamulaparthi (V) of Markook (M) for Construction of Sangareddy Canal under Kondapochamma Sagar Reservoir Project.Lr.No:G2/2671/2018.Dated:26.10.2018.
- Land Acquisition of Ac.2.06 and 0.04 gts situated at Lingapur (V) of Thoguta (M) for Construction of Right Main Canal of Mallanna Sagar under Kaleshwaram Project.Lr.No:G1/730/2018.Dated:23/10/2018.
- Land Acquisition of Ac.79.32¼ Gts situated at Gouraram(V) of Wargal(M) for Construction of sangareddy Canal under Kondapochamma Sagar Reservoir Project.Lr.No:G3/2595/2018.Dated:29.09.2018.
- Land Acquisition of Ac.79.32¼ Gts situated at Gouraram (V) of Wargal(M) for Construction of Sangareddy Canal under Kondapochamma Sagar Reservoir Project.Lr.No:G3/2595/2018.Dated:29.09.2018.
- Land Acquisition of Ac.21.39¼ gts in the limits of Kodakandla (V) of Gajwel (M) for formation of New BG Railway line between Manhorabad and Kothapally Railway stations Proc.No.G3/1523/2016, Dated:21.09.2018.
- Acquisition of Houses/Structures existing in the Abadi/Sy.No’s coming under Submergence in Kondapochamma sagar Reservoir situated within the limits Mamidyala (V) of Mulugu (M).Lr.No..G2/2681/2018.,Dated:20.09.2018.
- Land Acquisition of Ac.28.33 gts in the limits of Duddeda (V) of Kondapak (M) and Ac.0.18 gts in the limits of Gajwel(V) &(M) for construction of Railway line between Manoharabad to Kothapally.Lr.No.G3/1523/2018.Dated:18.09.2018.
- Land Acquisition of Ac.0.11 gts & Ac.1.15 gts situated at Theegul & Peerlapally villages of Jagadevpur (M) for construction of Gravity Main canal under Kaleshwaram project.,Lr.No.G2/1746/2018,Dated:28.08.2018.
- Land Acquisition of Ac.54.34Gts situated within the limits of kotyal (V) of Mulugu(M) for Construction of Thurkapally canal under Kondapochamma sagar reservoir project.Lr.No: G2/2368/2018.Dated:27.08.2018.
- Acquisition of Houses/Structures existing in the Abadi/Sy.No’s coming under Submergence in Kondapochamma sagar Reservoir situated within the limits Bahilampur(V) of Mulugu(M).Lr.No.G2/2497/2018.,Dated:25.08.2018.
- Land Acquisition of Ac.68.33 Gts in the limits of Akunoor, Nagapuri,and chityala villages of cheriyal (M) for excavation of Distributaries of right main canal of Tapaspally reservoir.Lr.No.G3/2207/2018.,Dated:18.08.2018.
- Land Acquisition of Ac.4.05 Gts Situated at Musthafaguda (V) of Mulugu (M) for Construction of Turkapally Canal Under Kaleshwaram Project.Lr.No:G2/2253/2018.Dated:18.08.2018
- Land Acquisition of total extent of Ac.3.09 Gts in the limits of Marpadaga,Kondapak and Giraipally villages of kondapak(M) for Construction of D4 Distributary of left Main Canal of Tapaspally tank under J.Chokkarao Devadula Lift Irrigation Project.Lr.No:G2/547/2017.Dated:18.08.2018.
- Land Acquisition of Ac.5.12¼ gts situated within the limits of Bejjanki (V) and (M) for construction of distributory canal of Ananthagiri reservoir under Kaleshwaram project.Lr.NoG1/2931/2017,Dated:13.08.2018.
- Land acquisition of Ac.0.16 Gts situated at Gundaram(V) of Bejjanki(M) for Construction of Kaleshwaram Project ,package-10 in distributery network system .Lr.No:G1/2938/2017.Dated:13.08.2018.
- Land Acquisition of Ac.0.16 Gts Situated within the limits of Gundaram (V) of Bejjanki(M) for Construction of distributory Canal of Ananthagiri Reservoir under Kaleshwaram Project.Lr.No:G1/2938/2017.Dated:13.08.2018.
- Land Acquisition of Ac.1.15 gts situated within the limits of Kallepally (V) of Bejjanki (M) for construction of Distributory canal of Ananthagiri Reservoir under Kaleshwaram project.Lr.No.G1/2933/2017,Dated:13.08.2018.
- Land Acquisition of Ac.49.19½ situated within the limits of Regonda (V) of Akkannapet (M) for excavation of Distributory D-1 and D-2 canals on Gouravelly left side main canal.Lr.No.G3/1057/2017,Dated:04.08.2018.
- Land Acquisition of Ac.21.17 gts situated at Appannapally village of Dubbak(M) for construction of Mallannasagar main canal under Kaleshwaram project.Lr.No.G1/2649/2017,Dated:28.07.2017.
- Land Acquisition of Ac.110.15½ Gts. for the villages of Cheriyal (M) for excavation of Distributaries of Right and Left main canals of Tapaspally Reservoir under J.Chokkarao Devadula Lift Irrigation project.Lr.No.G3/1988/2018., Dated:25.07.2018.
- Land Acquisition of Ac.1656.08¾ gts situated at Thoguta Mandal – Vemulaghat Village for Construction of Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project Proc.No.G1/681/2017,Dated:23.07.2018.
- Land Acquisition of Ac.5.05 gts situated at Bangla Venkatapur(V) of Gajwel (M) for construction of Kistapur canal and Ramyampet canal under Kondapochamma sagar Reservoir project.Lr.No.G2/2154/2018.,Dated:23.07.2018.
- Land Acquisition of Ac.4.22 Gts. situated at Dharmareddypally (V) of Gajwel(M) for formation of new BG railway line between Manoharabad and Kothapally. Lr.No.G3/1523/2016.,Dated:23.07.2018 .
- Land Acquisition of Ac.217.00 gts situated at Mamidyala (V) of Mulugu (M) for construction of Kondapochamma sagar Reservoir under Kaleshwaram project. Proc.No.G2/460/2017, Dated:18.07.2018.
- Land Acquisition of Ac.3.02½ gts and Ac.1.12 gts situated at Erravalli and Singaam village of Kondapak (M) for Acquisition of construction of Mallanna sagar under Kaleshwaram project.Lr.No.G1/1212/2017,Dated:17.07.2018.
- Land Acuquisition of Ac.0.13Gts Situated at Lingupalli (V) of mirdoddi (M) for Construction of high level Bridge (Dharmaram -Venkatrao pet).Lr.No:G1/2023/2018.Dated:17.07.2018.
- Land Acquisition of Ac.2.24½ Gts Situated at Marpadaga(V) of Kondapak (M) for Formation of Bypass road from Thimmareddypally to ponnal.Lr.No:G3/884/2017.Dated:09.07.2018
- Land Acquisition of Ac.0.22 gts situated at Mallupally (V) of Mirdoddi (M) for construction of High level bridge.Lr.No.G1/350/2018.,Dated:05.07.2018.
- Land Acquisition of An Extent Ac.20.18 Gts for Construction of Ranganayakasagar Reservoir under kaleshwaram project in the limits of peddakodur (V) of Chinnakodur(M).Proc.No:G1/2376/2017.Dated:03.07.2018.
- Land Acuisition of Ac.79.08 Gts for excavation of Main Canal of Sri Komurvelli Mallannasagar Reservoir under Kaleswaram Project in the limits of Narayanaraopet (V) of Siddipet (Rural) (M).Lr.No:G1/1212/2017.Dated:02.07.2018.
- Land Acquisition of Ac.2.06 gts situated at Machapur (V) of Chinnakodur (M) for construction of Ranganayakasagar Reservoir under Kaleshwaram project Proc.No.G1/2207/2017,Dated:29.06.2018.
- Land Acquisition of Ac.2.04 Gts Situated at Gundaram (V) of Bejjanki (M) for acquisition of land for construction of minor distributory of Kaleshwaram project .Lr.No:G1/2938/2017.Dated:18.06.2018.
- Land Acquisition of Ac.6.04 Gts situated within the limits of dacharam and veerapur villages of Bejjanki mandal for thotapally MI tank under MMR R/S Main Canal.Lr.No:G3/1517/2017.Dated:15.06.2018.
- Land Acquisition of Ac.6.04 Gts for excavation of Right Main Canal of Ranganayakasagar Reservoir Under Kaleshwaram Project in the limits of Narasapur (V) of siddipet (Urban)(M).Proc.N0:G1/2206/2017.Dated:14.06.2018.
- Land Acquisition of Ac.56.10½ Gts for excavation of Right Main Canal of Ranganayakasagar Reservoir under Kaleshwaram Project in the limits of Mittapally (V) of Siddipet (Urban) (M).Proc.No:G1/2192/2017.Dated:14.06.2018.
- Land Acquisition of Ac.26.34 gts situated at Machapur (V) of Chinnakodur (M) for construction of Ranganayakasagar Reservoir under Kaleshwaram project Proc.No.G1/2203/2017,Dated:14.06.2018.
- Land Acquisition of Ac.0.16 gts in the limits of Begumpet Village of Raipole mandal for formation of Kothapally to Manoharabad Railway line.Lr.No.G3/1523/2016.,Dated:07.06.2018.
- Land Acquisition of Ac.70.25½ gts situated at cheriyal(V)& (M) and Ac.21.30 gts situated at Dommata(V) and Ac.17.31 1/2 gts situated at mustyala(V) for construction of Thapaspally canal.Lr.No.G3/1561/2018,Dated:07.06.2018.
- Land Acuisition of Ac.19.14Gts,Ac.4.01 Gts,Ac.0.08 Gts and Ac.0.21 Gts situated at Thirmalapur,Indupriyal,Deepayampally,Doulthabad and Govindapur villages of Doulthabad(M) respectively for Construction of Ramayampet Canal under Kondapochamma sagarReservoir project.Lr.No:G2/1510/2018.Dated:07.06.2018.
- Land Acquisition of Ac.19.34 Gts.situated within the limits of samudrala and kachapur villages of Koheda (M) for formation of Gouravelly Reservoir. Lr.No.G3/1057/2017.,Dated:06.06.2018.
- Land acquisition of Ac.1.24 Gts,Ac.0.13 Gts,Ac.0.04Gts,Ac.2.20Gts,Ac0.01Gts,Ac.2.17 Gts and Ac.4.36 Gts situated at Thirmalapur,Kondapur,Mubaraspur,Upparipally,Lingarajupally,Doulthabad,Mohammad Shapur And Godugupally villages of Doulthabad (M)respectively for Construction ofUpparipally Canal under Kondapochamma sagar Reservoir Project.Lr.No:G2/1511/2018.Dated:31.05.2018.
- Land Acquisition of Ac.195.23¾ gts situated at Gouravelli (V) of Akkannapet (M) for formation of Gouravelli Reservoir Submergence.Proc.No.G3/1062/2017,Dated:31.05.2018.
- Land Acquisition of Ac.0.35½ Gts situated at Inapur of Komuravelly (M for excavation of D4 of left main canal of Tapaspally Tank under j.Chokkarao Devadula lift Irrigation Project.Lr.No:G3/2669/2017.Dated:31.05.2018.
- Land Acquisition of Ac.8.02½ gts, Ac.4.22 gts, Ac.18.21 gts totaling to an extent of Ac.31.05½ situated at Muddapur, Tipparam & Mangole villages of Kondapak Mandal for formation of parallel canals system under Kaleshwaram project.Lr.No.G2/3015/17, G2/3483/17, G2/3017/17, Dated:23.05.2018.
- Land Acquisition of Ac.8.18 gts,Ac.19.01 gts,Ac.9.20 gts situated within the limits of Erravally, Markook and Shivar venkatapur villages of Markook (M) for execution of OT-2L,3L,4L & 5L on Jagadevpur canal under Kondapochamma sagar Reservoir project.Lr.No.G2/1380/2018.,Dated:21.05.2018.
- Land Acquisition of Ac.167.30 Gts Situated within the limits of Gouravelli (V) of Akkannapet (M) for Formation of Gouravelly Reservoir Submergence.Lr.No:G3/1062/2017.Dated:21.05.2018.
- Land Acquisition of Ac.8.18 gts, Ac.19.01 gts and Ac.9.20 gts situated within the limits of Erravally, Markook and Shivar Venkatapur Villages of Markook (M) Respectively for excution of OT-2L,3L,4L & 5L on Jagadevpur canal under Kondapochamma sagar Reservoir project.Lr.No.G2/1380/18, G2/1381/18,G2/1382/18, Dated:21.05.2018.
- Land Acquisition of Ac.11.35 Gts situated at baddipadaga (V) of Nangnoor (M) for construction of ranganayakasagar project right canal.Lr.No.G1/1452/2018.Dated:19.05.2018.
- Land Acquisition of Ac.19.15 gts situated at Maqdumpur (V) of Nanganur (M) for construction of Ranganayakasagar Right Canal of Left Distributer Canal under Kaleshwaram Project.Lr.No.G1/1453/2018.,Dated:19.05.2018.
- Land Acquisition of Ac.77.32 gts situated within the limits of Manthur (V) of Raipole (M) for construction of Right main canal of Mallanna sagar Reservoir.Lr.No.G2/4610/2017,Dated:18.05.2018.
- Land Acquisition of Ac.43.36½ gts situated within the limits of Komuravelly, Posanpally, Gouraipally, Inapur and Guruvannapet villages of Komuravelly (M) for Distributory system,Minors & sub-minors of Tapaspally reservoir under J.Chokkarao Devadula lift irrigation project.Lr.No.G3/1268/2018.,Dated:15.05.2018.
- Land Acquisition of Ac.13.38 Gts Situated within the limits of Gouraipally of Komuravelly(M) for formation of New BG Railway Line between Manoharabad and Kothapally .Lr.No:G3/1523/2016.Dated:11.05.2018.
- Land Acquisition of Ac.5.07½ Gts situated at Gangapur& Vitalapur Villages of Chinnakodur (M) for Construction of Kaleshwaram Prorest,Ranganayaka Sagar reservoir .Lr.No:G1/1286/2018.Dated:09.05.2018.
- Land Acquisition of Ac.4.11 gts situated within the limits of Dacharam and Thotapally villages of Bejjanki mandal for excavation of outlet channel and surplus course of ThotapalliMi Tank.Lr.No.G3/1062/2017.,Dated:08.05.2018.
- Land Acquisition of Ac.12.33½ Gts of Excavation of Distibutory D-2 on left main canal Situated at pandilla (V) of Husnabad (M) for Formation of Gouravelly Reservoir Submergence.Lr.No:G3/1057/2017.Dated:08.05.2018.
- Land Acquisition of Ac.1356.01 gts situated at Mamidyala (V) of Mulugu (M) for construction of Kondapochamma sagar Reservoir under Kaleshwaram project.Proc.No.G2/460/2017, Dated:05.05.2018.
- Land Acquisition of Ac.20.27 Gts For Construction of Ranganayakasagar Right Canal of Left Distributer Canal under Kaleshwaram Project ,Situated at mundrai (V) of Nanganoor (M).Lr.No:G1/1458/2018.Dated:01.05.2018.
- Land Acquisition of Ac.28.25 gts situated at Kasturipally (V) of Chinnakodur (M) for construction of Ranganayaka sagar Reservoir canal.Lr.No.G1/4680/2017,Dated:01.05.2018.
- Land Acquisition of Ac.3.36 gts situated at Konayepally (V) of Nanganoor (M) for construction of Ranganayaka sagar Project Right Canal of left Distributer canal under kaleshwaram project.Lr.No.G1/99 4/2017,Dated:01.05.2018.
- Land Acquisition of Ac.30.35 gts for Construction of Ranganayaka sagar Project Right Canal of left Distributer canal under kaleshwaram project Situated at Narmetta (v) of Nanganoor (M).Lr.No:G1/1251/18.Dated:30.04.2018.
- Land Acquisition of Ac.40.01 gts situated at Jakkapur (V) of Siddipet Rural (M) for construction of Left canal of Ranganayakasagar.Lr.No.G1/4685/2017,Dated:27.04.2018.
- Land Acquisition of Ac.32.04 gts situated at Ibrahimnagar (V) of chinnakodur (M) for construction of Ranganayakasagar reservoir canal.Lr.No.G1/4683/17,Dated:26.04.2018.
- Land Acquisition of AC.8.07 gts for Construction of Ranganayakasagar Project Right canal of left distributery canal situated at nanganoor (v) of nanganoor(M).Lr.N0:G1/1226/2018.Dated:26.04.2018.
- Land Acquisition of Ac.3.10 gts situated at chowdaram(V) of chinnakodur (M) for construction of ranganayaka sagar reservoir canal.Lr.No.G1/4681/2017,Dated:24.04.2018.
- Land Acquisition of Ac.211.08 gts situated at Laddnur, marmamula, salakhapur, vangavalli, khutigal, vallampatla, rebharthi, lakkapalli, dharmaram, and maddur villages of Maddur (M) for construction of left Main canal of Laddnur Distributory system,Minors & sub-minor canals under JCR-DLIS, Phase-III, Package-VIII, Lr.No.G3/833/18, G3/834/18, G3/835/18, G3/836/18, G3/837/18,G3/838/18, G3/839/18, G3/839/18, G3/840/18, Dated:24.04.2018.
- Land Acquisition of Ac.8.27 gts situated at danampally(V) of cheriyal for construction of Right main canal of Ranganayakasagar project.Lr.No.G1/2685/2018,Dated:23.04.2018.
- Land Acquisition of Ac.10.10 Gts for Construction of ranganayakasagar left canal under kaleshwaram project situated at peddakodur (v) of Chinnakodur (M).Proc.No:G1/2376/2018.Dated:23.04.2018.
- Land Acquisition of Ac.21.03 gts situated at Machapur (V) of chinnakodur (M) for construction of Ranganayaka sagar reservoir canal under Kaleshwaram project.Lr.No.G1/2203/2017.,Dated:20.04.2018.
- Land Acquisition of Ac.5.01 gts situated at gurralagondhi (V) of siddipet rural (M) for construction of left canal of Ranganayakasagar.Lr.No.G1/1347/2017.,Dated:17.04.2018.
- Land Acquition of Ac.04.05 gts for Construction of right main Canal under Kaleshwaram Project Situated at palamakula (V) of Nanganoor (M).Lr.No:G1/1132/2018.Dated:17.04.2018.
- Land Acquisition of Ac.4.11 gts situated within the limits of Dommata village of Doulthabad Mandal for construction of Gravity canal/Right main canal of package-13 under Kaleshwaram project.Lr.No.G2/4579/2017,Dated:16.04.2018.
- Land Acquisition of Ac.14.33 Gts for construction of komuravelli mallanna sagar right main canal under kaleshwaram project situated at peddamasanpalli (V) of Thoguta (M).Proc.No:G1/2334/2017.Dated:13.04.2018.
- Land Acquisition of Ac.52.27½ Gts situated at irkode(v) of Siddipet (Rural)(M) for Construction of kaleshwaram project package-12-mallanna sagar main canal.Lr.No: G1/4353/2018.Dated:11.04.18.
- Land Acquisition of Ac.01.01 gts situated at Konayepally (V) of Nanganoor (M) for Right Main canal of Kaleshwaram project.Lr.No.G1/994/2018,Dated:11.04.2018.
- Land Acquisition of Ac.64.07 Gts situated at bandarupally (V) of thoguta(M) for construction of sri komuravelli mallanna sagar main canal under Kaleshwaram project.Lr.No.G1/2359/2017.Dated:10.04.2018.
- Land Acquisition of Ac.48.22 gts situated at Dacharam (V) of Bejjanki (M) for Summergence under Thotapally MI Tank, Proc.No.G3/825/17,Dated:17.03.2018
- Land Acquisition of Ac.49.00 gts situated within the limits of Gouravelly,Jangoan,Gandipalli villages of Akkannapet (M) for formation of Gouravelly Reservoir Bund portion.Lr.No.G3/715/2017.,Dated:16.03.2018
- Land Acquisition of Ac.83.27 gts situated at Mandapally (V) of siddipet urban (M) for construction of Manoharabad-Kothapalli B.G. railway line.Lr.No.G3/1523/2016,Dated:16.03.2018.
- Land acquisition of Ac.43.36 Gts,Ac.35.32¼ Gts,Ac.27.06 Gts,Ac.14.31 Gts, totalling to an extent of Ac.121.25¼ gts situated at Cheelasagar, narsampally, Adavimasid villages of Mulugu (M) for Construction of Thurkapally canal under Kaleshwaram project .Lr.No:G2/758/18,G2/761/18,G2/760/18,G2/758/18, Dated:16.03.2018.
- Land Acquisition of Ac.50.34 Gts for Construction of Manoharabad-Kothapalli B.G. railway line Situated at Narsapur (V) of Siddipet (Arban) (M).Lr.No:G3/1523/2016.Dated:15.03.2018.
- Land Acquisition of Ac.56.36 gts situated at Mittapalli (V) of Siddipet urban (M) for construction of Manoharabad-Kothapalli B.G. railway line.Lr.No.G3/1523/2016.,Dated:15.03.2018.
- Land Acquisition of Ac.3.10 ¼ gts situated within the limits of Kodakandla (V) of Gajwel (M) for construction of new BG Railway line between Manoharabad & Kothapally Lr.No.G3/1523/2016,Dated:14.03.2018.
- Land Acquisition of Ac.34.13.Gts situated at Lingapur (V) of Thoguta (M) for Construction of Right Main Canal of Mallanna Sagar under Kaleshwaram project .Lr.No:G1/730/2018.Dated:13.03.2018.
- Land Acquisition of Ac.168.15 gts situated at Mutrajpalli (V) of Gajwel (M) for construction of houses for R&R under Kaleshwaram project. Lr.No.G1/521/2018,Dated:06.03.2018.
- Land Procurement to an extent of Ac.3.25 gts situated at Narsapur (V) of Siddipet Urban (M) for Construction of Sewerage Treatment Plant for the Municipal Council is sent herewith for publication.Lr.No:G1/650/2018.Dated:06.03.2018.
- Land Acquisition of Ac.95.12 Gts situated at Duddeda village ,Ac.3.30 gts of land situated at Kukunoorpally village of Kondapak Mandal for Consruction of Railway line between Manoharabad to Kothapally .Lr.No:G3/1563/2016.Dated:03.03.2018.
- Land Acquisition of Ac.23.15 gts situated at within the limits of Vadloor and Thotapally villages of Bejjanki (M) for excavation & forming embankment of D-8 canal.Lr.No.G3/1650/2017,Dated:23.02.2018.
- Land Acquisition of Ac.1.16 gts situated at chellapur (V) of Dubbak (M) for construction of sri komuravelli mallanna sagar reservoir main canal under Kaleshwaram project.Lr.No.G1/2650/2017,Dated:20.02.2018.
- Land Acquisition of Ac.0.28 Gts situated at Dumpalapalli (V) of Dubbaka (M) For Construction of Sri komuravelli Mallanna sagar reservoir Main canal under Kaleshwaram Project .Lr.No:G1/ 2761/2017.Dated:20.02.2018.
- Land Acquisition of Ac(14.22,20.09,5.33,7.16¾) gts situated at Jangapally, Almaspur, Lingareddypally and Chandlapur village of Mirdoddi and siddipet urban and chinnakodur mandal for construction of Right main canal of Mallanna sagar reservoir under Kaleshwaram project.Lr.No.G1/503/2018,Dated:20.02.2018.
- Land Acquisition of Ac.0.28 gts and 1.16 gts situated within the limits of Dumpalapalli and Chellapur village of Dubbak (M) for construction of main canal of Mallanna sagar reservoir under Kaleshwaram project.Lr.No.G1/2761/2017,Dated:20.02.2018.
- Land Acquisition of Ac.14.22 gts, Ac.20.09 gts situated at Jangapally, Almaspur villages of Mirdoddi (M) & Ac.5.33 gts situated at Lingareddypally (V) of Siddipet (U) Mandal & Ac.7.16¾ gts situated at chandlapur (V) of Chinnakodur (M) for construction of Right main canal of Kaleshwaram project.Lr.No.G1/503/2018, Dated:19.02.2018.
- Land Acquisition of Ac.16.36 gts, Ac.34.04 1/4 gts, Ac.3.37 gts for construction of Mallannasagar under Kaleshwaram project in the limits of Erravally, Singaram, Thipparam villages of Kondapak(M).Lr.No.G1/1212/2017,Dated:23.01.2018.
- Land Acquisition of Ac.0.30½ gts situated within the limits of Gajwel (V)&(M) for construction of Gajwel outer Ring Road.Lr.No.G2/335/2017.,Dated:23.01.2018.
- Acquisition of (935) Houses for Construction of Sri Komuravelli Mallanna Sagar Reservoir under Kaleshwaram Project in the limits of Etigaddakishtapur,Thirumalagiri, Mogullacheruvu thanda,laxmapur Villages of Thoguta Mandal.Lr.No:G1/1195/2017.Dated:20.01.2018.
- Acquisition of (531) Houses situated at pallepahad (V) of Thoguta (M) for construction of sri Komuravelli Mallanna sagar reservoir under Kaleshwaram project. Lr.No.G1/1195/2017,Dated:20.01.2018.
- Land Acquisition of Ac.47.33¼ Gts situated at Gajwel (V)&(M) for construction of New BG RailWay Linein between Manoharabad-Kothapalli.Lr.No:G3/1523/2016.Dated:17.01.2018.
- Land Acquisition of Ac.0.19 GTs for under Construction of kaleshwaram project canal situated at Muddapur (V) of kondapaka(M.Lr.No:G2/3015/2017.Dated:17.01.2018.
- Land Acquisition of Ac.46.35 gts situated at Siddipet Town of Siddipet Urban Mandal of Siddipet District for Development for Recreation Zone specially for development of multiple activities.Lr.No.G1/3888/2017,Dated:23.12.2017.
- Acquisition of (168) Houses situated at chelkalapally, kochhaguttapally madhira chekalapally,allipur revenue village, Allipur villages of Chinnakodur (M) for construction of Ananthagiri sagar under Kaleshwaram project.Lr.No.G1/158/2017,Dated:20.12.2017.
- Acquisition of Structures existing in the Abadi/Sy.No’s coming under Submergence in improvement to existing Thotapally MI Tank Online Reservoir situated within the limits of Laddabanda (V) H/o Dacharam (V).Lr.No.G3/4709/2017,Dated:13.12.2017.
- Land Acquisition of Ac.20.08 gts situated at Jaligama (V) of Gajwel (M) for package-17,audit-1,Dumping yard under Kaleshwaram project.Lr.No.G1/3762/2017,Dated:01.12.2017.
- Land Acquisition of Ac.57.28 Gts situated within the limits of surampally village of Mirdoddi Mandal for execution of Gravity Canal from Mallanna Sagar.Lr.No.G2/4563/2017., Dated:25.11.2017.
- Land Acquisition of Ac.1641.24 gts situated at Vemulaghat (V) of Thoguta (M) for construction of Sri Komuravelli mallannasagar Reservoir Lr.No.G1/681/2017, Dated:23.11.2017.
- Land Acquisition of Ac.38.11 gts situated at dacharam (V) of Gajwel(M) for construction of Tunnel/Gravity canal under Kaleshwaram project.Lr.No.G1/3776/2017,Dated:31.10.2017.
- Land Acquisition of Ac.38.03 gts situated at Jaligama (V) of Gajwel (M) for construction of Tunnel/Gravity canal under Kaleshwaram project.Lr.No.G1/3670/2017,Dated:31.10.2017
- Land Acquisition of Ac.52.25 gts situated at Kyasaram (V) of Gajwel (M) for construction of Tunnel under Kaleshwaram project.Lr.No.G1/3571/2017,Dated:30.10.2017.
- Land Acquisition of Ac.124.18 Gts. Ac. 136.29 Gts, Ac.133.10 Gts, and Ac.122.24 Gts situated at Akkaram village of Gajwel Mandal, Markook (V)& (M) and Muddapur and Mangole village of Kondapak Mandal of siddipet District respectively for construction of Gravity/ Parallel canal under Kaleshwaram project.Lr.No.G2/3058/2017,Dated:16.09.2017.
- Land Acquisition of Ac.12.14 gts and Ac.8.35 gts situated at chandlapur (V) and Ramncha (V) of Chinnakodur (M) for construction of Ranganayakula sagar and bund under Kaleshwaram project.Lr.No.G1/1031/2017,Dated:29.08.2017.
- Land Acquisition of Ac.1.01 Gts For construction of ranganayakulasagar reservoir under Dr|| B.R. Ambedkar Pranahitha chevella sujala sravanthi project,Situated at Narayanaravpeta (v) of Siddipet (Rural) (M).Lr.No:G1/1212/2017.Dated:22.08.2017.
- Land Acquisition of Ac.35.35 1/4 gts situated at Erravalli (V) of Kondapak (M) for construction of Komuravelli Mallannasagar reservoir under Kaleshwaram project.Lr.No.G1/1212/2017, Dated:22.08.2017.
- Land Acuisition of Ac.0.27 Gts,Ac.6.23 Gts & Ac.6.25 3/4 Gts, situated at allipur, chandlapur, peddakudur villages of Chinnakodur mandal for construction of Anthagiri and ranganayakasagar reservoir and bund under Kaleshwaram project.Lr.No.G1/2917/2017.Dated:16.08.2017
- Land Acquisition of Ac.60.17 gts situated at Mamidyal (V) of Mulugu (M) for the construction of Kondapochamma reservoir and bund under Kaleshwaram project.Lr.No.G2/460/17,Dated:01.08.2017.
- Land Acquisition of Ac.71.07 gts situated at Bahilampur (V) of Mulugu (M) for construction of Kondapochamma reservoir and bund under Kaleshwaram project.Lr.No.G1/363/2016,Dated:01.08.2017.
- Land Acquisition of Ac.21.17 Gts.situated at appannapally village of dubbaka (M) for construction of mallanna sagar main canal under Kaleshwaram project.Lr.No.G1/2649/2017,Dated:28.07.2017.
- Land Acquisition of Ac.919.22 gts situated at Lingareddypally (V) of Siddipet (M) for construction of Ranganayaka sagar Reservoir and band.Lr.No.G1/2333/2017,Dated:15.07.2017.
- Land Acquisition of Ac.63.19 gts situated at bandarupally village of thoguta mandal for sri komuravelli mallanna sagar main canal under Kaleshwaram project.File.No.G1/2359/2017.Dated:14.07.2017.
- Land Aquisition of Ac.4.05 gts situated within the limits of chinnakodur mandal Ramunipatla (V) for construction of Ranganayaka sagar reservoir under Kaleshwaram Project.File.No:G1/2335/2017,Dated:14.07.2017.
- Land Acquisition of Ac.2.01 gts situated at Dharmareddypalli (V) of Gajwel (M) for BG Railway line File No. G3/1523/2016, Dated:01.07.2017.
- Land Acquisition of Ac.367.20 gts. for excavation of gravity main canal under package No 15 in the limits of Jagadevpur village of mandal. Proc.no.G2/1765/2017 Dated:24.06.2017.
- Land Acquisition of Ac 14.31 Gts of land for construction of Right Main Canal of Ranganayakula Sagar Reservoir under kaleshwaram project situated at velkatoor (V)of Siddipet Urban (M).Proc.No:G1/1029/2017.Dated:24.06.2017.
- Land Acquisition of Ac.1.29 Gts of land for Construction of left main canal of Ranganayakula Sagar Reservoir under kaleswaram project Situated at Jakkapur (V) of Siddipet Rural (M).Proc.No:G1/1373/2017.Dated:23.06.2017.
- Land Acquisition of Ac.2.24½ Gts.under construction of Bypass road situated at Kondapak (M) in Marpadaga (V).Proc.No:G3/884/2017.Dated:23.06.2017 .
- Land Acquisition of an Extant Ac.14.33 gts situated at peddamasanpally (V) of Thoguta (M) for Construction main canal of Mallanna sagar under kaleshwaram Project .Lr.No:G1/2334/2017.Dated:23.06.2017.
- Land Acquisition Of Ac.17.35 gts For construction of dr||B.R. Ambedkar Pranahitha chevella sujala sravanthi Project package 11,Situated at Mundrai (V) of Nanganoor (M).Lr.No:G1/1458/2017.Dated:23.06.2017.
- Land Acquisition of Ac.6.30 Gts for Construction of Ranganayaka sagar Canal under Kaleshwaaram Project situated at malyal (V) of Siddipet (Rural) (M).Lr.No:G1/2281/2017.Dated:23.06.2017.
- Land Acquisition of Ac.1.29 gts situated at Jakkapur (V) of Siddipet Rural (M) for construction of dr||B.R. Ambedkar Pranahitha chevella sujala sravanthi Project,Left canal of Ranganayakula sagar.Lr.No.G1/1373/2017,Dated:23.06.2017.
- Land Acquisition of Ac.10.22Gts of land for construction of main canal of mallanna sagar reservoir under kaleshwaram project situated at Thadkapalli(V) of Siddipet (U)(M).Proc.No:G1/2193/17.Dated:16.06.2017.
- Land Acquisition of Ac.26.34 gts situated at Machapur (V) of Chinnakodur (M) for construction of dr||B.R. Ambedkar Pranahitha chevella sujala sravanthi Project, package-11 canal of Ranganayakula sagar Reservoir. Lr.No. G1/2203/2017,Dated:16.06.2017.
- Land Acquisition of Ac.2.06 gts situated at Machapur (V) of Chinnakodur (M) for construction of dr||B.R. Ambedkar Pranahitha chevella sujala sravanthi Project, package-11 canal of Ranganayakula sagar Reservoir. Lr.No. G1/2207/2017,Dated:16.06.2017.
- Land Acquisition of Ac.56.10½ gts situated at Mittapally (V) of Siddipet (U) mandal for construction of Right Main canal of Ranganayaka sagar Lr.No.G1/2192/17,Dated:16.06.2017
- Land Acquisition of Ac.3.08 gts situated at Ramancha (V) of Chinnakodur (M) for construction of dr||B.R. Ambedkar Pranahitha chevella sujala sravanthi Project, package-11 canal of Ranganayakula sagar Reservoir.Lr.No.G1/2207/17,Dated:16.06.2017.
- Land Acquisition of Ac.56.39½ gts situated in the limits of Dacharam and Veerapur villages of Bejjanki (M) for Thotapalli Tank Summergence under Thotapally MI Tank under MMR R/S Main canal.Proc.No.G3/1517/17, Dated:13.06.2017.
- Land Acquisition of Ac.79.08 Gts situated at siddipet rural(M) in Narayanaravpeta(V) under the construction of kaleswaram ranganayakula sagar project canal.Lr.No:G1/1212/17.Dated:08.06.2017.
- Land Acquisition of Ac.3.33 Gts for Construction Of Ranganayaka sagar Project Right Canal Under Kaleshwaram Project,Situated at Muradabad H/0 venkatapur (V) of Nanganoor (M). Proc.No:G1/1458/2017.Dated:08.06.2017.
- Land Acquisition of Ac.52.26 gts situated at Thimmaipally (V) of Nangnoor (M) for construction of Ranganayakula sagar canals under Kaleshwaram project File.No.G1/1427/2017, Dated:08.06.2017.
- Land Acquisition of Ac.70.15 gts situated at Ummapur (V) of Husnabad (M) for construction of percolation tank at Mahasamundram Proc.No.G3/740/2017, Dated:08.06.2017.
- Land Acquisition of Ac.3.33 gts situated at muradhabad H/o venkatapur (V) of Nangnoor (M) for construction of Right canal of Ranganayakula sagar project File.No.G1/1458/2017, Dated:08.06.2017.
- Land Acquisition of Ac.617.36 gts situated at Gouravelli (V) of Akkannapet (M) for construction of Gouravelli project.Lr.No.G3/1062/17.,Dated:03.06.2017.
- Land Acquisition of Ac.233.06 gts situated at Markook (V) & (M) for construction of Konda pochamma Reservoir under Kaleshwaram project.Lr.No.G1/343/2016,Dated:27.05.2017.
- Land Acquisition of Ac 7.08 Gts Situated at Gajwel division of Gajwel (M) in Dharmareddipalli (V) for construction of B G Railway line kotthapalli Manoharabad.Lr.No:G3/1523/2016.Dated:22.05.2017.
- Land Acquisition of Ac.650.07 gts situated at Pamulaparthy (V) of Markook (M) for construction of Kondapochamma sagar Reservoir under Kaleshwaram project Proc.No.G1/362/2016, Dated:19.05.2017.
- Land Acquisition of Ac.5.13.Gts situated at Gajwel division ,Wargal (M) in Gowraram (V) for construction of kondapochamma sagar reservoir under kaleswaram project.Proc.No:G2/459/2017.Dated:16.05.2017.
- Land Acquisition of Ac.3.16 1/2 gts, Ac.2.05 gts, Ac.4.14 1/4 gts for construction of Mallannasagar under Kaleshwaram project in the limits of Erravally,singaram, Thipparam villages of Kondapak (M).Lr.No.G1/1212/2017,Dated:16.05.2017
- Land Acquisition of Ac.14.07½ gts situated in the limits of pandilla (V) of Husnabad (M) for excavation of D-2 on left side main canal from KM 4,450 to 7,755 & Ayacut Development Proc.No.G3/1057/17, Dated:08.05.2017.
- Land Acquisition of Ac.68.03 gts situated at Dacharam, Thotapally villages of Bejjanki (M) for Formation of Gouravelly Reservoir Submergence.Proc.No.G3/89/2017, Dated:08.05.2017.
- Land Acquisition of Ac.26.25. Gts for construction of kondapochamma sagar reservoir under kaleshwaram project situated at pamulapalli (V) of markuk (M).Proc.No:G1/362/2016.Dated:07.04.2017.
- Land Acquisition of Ac.0.14 gts situated at venkatapur (V) of nanganoor (M) for construction of Left canal of Ranganayaka sagar project under Kaleshwaram project Lr.No.A/519/2017,Dated:03.04.2017.
- Land Acquisition of Ac.248.39½ gts situated at gouravelli, janagam, Gandipalli, Regonda villages of Akkannapet (M) for construction of Gouravelli Reservoir Proc.No. G3/715/2017, Dated:28.03.2017.
- Land Acquisition of Ac.106.34½ gts situated at Marpadaga (V) of Kondapaka (M) for construction of J Chokka rao irrigation project phase-II of D4 Distributor of Lift main canal File.No.G2/547/2017, Dated:28.03.2017.
- Land Acquisition of Ac.22.36½ gts situated at Raghavapur (V) of siddipet (R) Mandal for construction of Ranganayakula project canals File.No.G1/1212/2017, Dated:28.03.2017.
- Land Acquisition of Ac.56.26 Gts, Situated at Toguta(M),Yetigadda Kistapur(V),Ac40.0525Gts Situated at Toguta(V) and Ac.3.00 situated at pallepahad(V) and Ac.0.04 Gts Situated at Tukkapur (V) for under construction of Kaleswaram konda pochamma sagar reservoir/canal .Lr.No:G1/1195/2017.Dated:27.03.2017
- LandAcquisition of Ac 19.20¾ Gts & Ac.18.03½ Gts.for construction of pakage 11 Ranganayakula sagar Reservior project Situated at Ramancha&Chandlapur villages of chinnakodur(M) .Proc.No:G1/1031/2017,Dated:17.03.2017.
- Land Acquisition of Ac.41.06 gts situated at Konaipally (V) of Nangnoor (M) for construction of dr||B.R. Ambedkar Pranahitha chevella sujala sravanthi Project, package-11. Lr.No.G1/994/17,Dated:11.03.2017.
- Land Acquisition of Ac.1356.01 gts situated at Mamidyala (V) of Mulugu (M) for construction of Kondapochamma sagar reservoir & Band.Lr.No.G2/460/2017,Dated:30.01.2017.
- Land Acquisition of Ac.56.02 gts situated at Gajwel (V)&(M) for construction of package -17 canal under kaleshwaram project.Lr.No.G1/4564/2017,Dated:11.01.2017.